Report #2
Page 1 of 1
Inspection Re p0rt
I)ate: 4-5-22
Project: Pestotnik Residence Lot 20 Ranch @ Coulter Creek
Address: 133 Saddle Cir. Carbondale" CO
Building Permit No: BLRE -09-21 -7 097
General Contractor: Dave Cardiff Const.
Contractor that Performed Worl¡; Sopris Steel
[ns n of sho fabrication or freld work at ob site: Field
R.eport: Visually inspected field wel at center tube steel connections steel
frame A at grid line G, field welded LVL buckets at steel column main floor
framing grid line 1, and inspected high strength A325 bolting at the steel beam,
column, and frame connections except for one connection where steel beam was
not yet installed at grid line 6 between grids Ë & F.
The onsite welding & high strength bolting inspected above appeared to be in
substantial conformance with the plans & the quality requirements of the A'WS
D 1.1 Structural Welding Code & the AISCIRCSC Specification for high str-ength
bolting.
Inspector/TechnicÍan: Douglas E Young
3¡iray-a
Douglas Ë youno
cwt eG070131 "
QC1 EXP.7t1t2o2g
Pæøw/z