HomeMy WebLinkAboutAnchor Bolt Inspection 06.13.2023THUI\DER MOUI{TAIIì{ TE STIT{G P.O. Box 62 I Collbran, CO 81624 Cell (970) 210-7008 E-Mail : thu ndermountaintesting@gmait.com www.thundermountaintesting. com June 13,2023Eagle's Rise Ranch 250 Reitschule Lane Snowmass, CO 816564 AITN: Mr, Trevor MountjoY 725 Spring Park Ridge Carbondale, CO *Field Inspection RE Permit #BLRE A7 -22-7 657 Dear Mr. Mountjoy, As requested, structural steel special inspection was conducted per the IBC 2Û18 Edition - Chapter l7: Structural Tests and Special Inspection and Garheld County requirements. I arrived on site at 12:00 PM. I met with you to review project requirements and materials ready for inspection' High strength bolting inspection was conducted at the Roof Framing Plan level on fheVr.",5/8", and %" ASTM 4325 high strength beam to beam and beam to column bolted connections on this project. Project bolt tension requirements indicate o'Snug Tight" as required on engineering approved stamped drawings provided by Heritage Building Systems in North Little Rock, AR.: Job No. l8-8-53753 dated 8-11-22: Sheet C2 - Bold Tightening. All main frame bolted connections were inspected for project bolt tension requirements of 'osnug tight". Inspection was conducted at grid line A - E & I - 4. Upon completion, I observed all newly installed bolts to be in compliance with project specifications and the inspection criteria of the American Institute of Steel Construction (ASIC) Research Council on Bolted Connections (RCBC). Anchor bolt inspection was conducted at the Foundation Plan level on all column anchor bolts. Upon completion, all bolts were observed to be properly installed and all bolt nuts to be tensioned to a snug tight condition. PAGE 2 L Submitted, t2024 AWS CWI 1040201 ICC Certified #0863569-5l & S2 ASNT NDT Levellll #30242 Thunder Mountain Testing @