Loading...
HomeMy WebLinkAboutCorrespondence-Design CriteriatrHIE t4 BUI LDINGS 1821 S. North Rd Grand lsland, NE 68803 308.38s.7289 chiefbuildings.com cs@chiefind.com 3t7t2023 Re Chlef Order No. Description: Builders Name: Building Owner's Name: Jobsite City, State: B,3022822 Atlantic Aviation - Rifle, Hangar 6 Tectonic Management Group, lnc Atlantic Aviation Rifle, GO To Whom lt May Concern Please accept this letter of certification that the Chief components furnished to Tectonic Management Group, lnc, for Atlantic Aviation, Rifle, CO, have been designed for the criteria as specified by Purchaser in the order documents and as shown in the attached Design Criteria. These Chief components as supplied, when properly erected as furnished, on an adequate foundation, will meet the loading requirements supplied to Chief by Purchaser in accordance with good engineering practices. This certification does not cover field modifications nor does it cover materials furnished by someone other than Chief lndustries, lnc.; nor the connection between Chief components and those manufactured or supplied by someone other than Chief lndustries, lnc. Sincerely Dwaine Voboril, P.E. Engineering Supervisor Chief Buildings DV/tt Mar 14 2023 Þoeufu'", BUIL trHIE 1821 S. North Rd Grand lsland, NE 68803 308.389.7289 chiefbuildings.com ts@chiefind.com Building Gode IBC Risk Gategory Roof L¡ue Loart Tributáry IUea Redu ction'Al l-owe d Godat¡rd't-o.d- Ground SÐo*.Loat(PgÈ Exposure Factor (Ge) Thermal Factor {Ct) lmportance Factor (l) Flat Roof Snow Load (Pf) Minimum Roof Snow Load (Pm) Drift Surchatge Load, Pd and Snow Drifr Width, w Building Enclosure Ultimate Design Wind SPeed (Vult) Nominal Design Wind SPeed (Vasd) Exposure Category Wind Pressure (q) Seismic Spectral Response Short Periods (Ss) Spectral ResPonse { s Period (S{) Seismic lmPortance Factor Seismic Design Category Site Glass Seismic Resisting SYstem Longitudinal Direction Lateral Direction Seismic Response Coefficient (Gs) Spectral Response Parameter Short Period (SÐS) Spectral Response Parameter I s Period (SDf ) Analysis Procedure: Base Shear Other Loads: lnternational Building Code 2015 ll - Standard Buildings 20 psf No 6 psf 40 psf t.0 t.0 1.00 28.00 psf 40 psf - Not used with drift, sliding, unbalanced, or partial loads. None Closed 115 mph (Gcpit 0.18) 89 mph c 29.6 psf 3O.70o/" 8.00% 1 B D Steel System (R=3.00) Steel System (R=3.00) 0.079 0.318 0.128 ELF 36.46 kips 200 lbs Curtain 2 x 400 lbs Ceiling Fans 6 x 100 lbs Radiant Heaters 3 x 200 lbs Furnaces