Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-Oó-23-81ó0 ASPEN GLEN CLUBHOUSE PRO SHOP ADDITION AND REMODEL 545 BALD EAGLE WAY CARBONDALE, CO 81623 1) The approved plans are to be on-site for inspections. 2) Sanitary facilities are required to be provided for workers. 3) A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www. colorado. oovipacific/doraiDPO Electrical Plu m binq Perm its 4) Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. 5) All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. 6) Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. 7) The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. 8) The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. 9) Please provide special inspections reports to the Building Department as specified within the General Notes of the structural drawings. 10) Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 713) 11) Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 1500psf. 12) All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI Ê.117.1 - 404.2.6) 13) Plcasc call for a plumbing inspection for thc Grcacc lnterceptor prior to baekfilling or covering any pipes.