HomeMy WebLinkAboutCondition of PermitCONDITION OF PERMIT
BLMF-O6-23-8176
Froylan & Ponce Diaz
Single-Family Manufactured Home
7960 CR 301 , Parachute
240505400022
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.)
AND AtL FACTORY.BUITT RESIDENTIAT STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALTATION AT THE JOB SITE.
1 ) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDING / STATRS SHALL COMPLY WITH 201s l.R.C.,
2OO9 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
MAN UFACTURER'S INSTALLATION REOUI REM ENTS.
3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMIVìENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BYA COLORADO LICENSED
ELECTRICIAN.
s) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
ó) pRtoR To FTNAL BUtLDtNG tNSPECT|ON & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR
WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR
INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
7) GARFTELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2,OOO PSF, VERIFY 3ó INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST FOOTING INSPECTION, 2,OOO PSF
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS AND ON-SITE INSTALLATION AND FINISH OF ITEMS 1.8 OF
THE COLORADO DOLA LETTER DATED APRIL 9, 2021.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY