HomeMy WebLinkAboutEngineer's Letter- Slab Reinforcement 07.10.2023Metal Building Engineering, LLC
Fountain Inn, SC 29644
Phone: (843) 296-4716 Email: EngSupport@ActBuildingSystemns.com
July 10, 2023
Re: MPAI92916725.1 Gatlin Drawings - R01 SEALED 06122023
To whom it may concern,
This letter is to affirm that the slab reinforcement may exclusively be fiber reinforcement in lieu of the wire mesh and
rebar options shown on the footing detail in the above referenced engineering drawings.
IF the wire and/or rebar are left out and only fiber is used to reinforce the slab against cracking, a #4 rebar tie must
be installed between column lines per Foundation Note 1 in the foundation plan.
If you have any questions regarding this letter, please contact me at phone or email address listed above.
Sincerely,
Kyle McDonough, PE
Metal Building Engineering, LLC