Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT B LRE-0 6-23-B 17 1 HEATHER BEATTIE DETACHED STORAGE BUILDING ONLY ó31 CR 321 , Rifle - 217719200490 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATIONAL RESTDENTTAL CODE (r.R.C.)AND 2009 I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMITT|NG AND TNSPECTIONS BY COLORADO STATE ELECTRTC BOARD. ELECTRTCAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FrRST FOOTTNG TNSPECTTON ,2,000 PSF SOIL BEARTNG. AS PROVIDED BY MIC BACA ENGINEERED FOUNDATION DESIGN (GEOTECH TO INCLUDE COMPACTION REPORT FOR ANY STRUCTURAL FILL). ó) ALL HtcH STRENGTH BOLTTNG AND FrELD WELDTNG REOUTRES SPECTAL TNSPECTOR. PROVIDE APPROVAL REPORT AT FRAMING INSPECTION. 7) THE BUILDING HAS BEEN REVIEWED FOR PRIVATE USE STORAGE ONLY, AND, AS AN ACCESSORY BUILDING TO THE I\4AIN RESIDENCE. ANY FUTURE CHANGE TO BUILDING OCCUPANCY OR USE, WILL BE SUBJECT TO A NEW BUILDING PERMIT APPLICATION AND REVIEW FOR COMPLIANCE WITH ZONING REGULATIONS, LAND USE & BUILDING CODES IN EFFECT AT TIME OF FUTURE WORK. B) PURSUANT TO KIRK BEATTIE EMAIL (SEE ATTACHED) FUTURE DWV AND PO-TABLE WATER SUPPLY TO BE ROUGH-IN ONLY UNDER THIS PERMIT. BUILDING FILE CONTENTS EXPRESS AN UNHEATED, UNCONDITIONED BUILDING SPACE WITH NO BATHROOM GROUPS OR FINISHED PLUMBING FIXTURES. 9) MINtMAL, LtM|TED WTNDOW / DOOR TNFORMATION PROVIDED lN THE MANUFACTURER',S SUBMITTED STEEL BUILDING SPECIFICATIONS. AS OWNER'S REPRESENTATIVE CONTEMPLATES A FUTURE CHANGE IN BUILDING USE TO INCLUDE RESIDENTIAL LIVING USE(S)WITHIN A PORTION OF THE BUILDING FOOTPRINT.. WE HIGHLY RECOMMEND OWNER OBTAIN SERVICES OF A OUALIFIED ARCHITECT OR ENERGY CONSULTANT TO ASSESS SELECTED WINDOW / DOOR PACKAGE ORDER, PROPOSED WINDOW ENERGY U-FACTORS, AND CODE REOUIREMENTS FOR ROOF VENTING, MECHANICAL AND ELECTRICAL DESIGN, FUTURE BEDROOM EMERGENCY ESCAPE AND RESCUE OPENINGS, NATURAL LIGHT AND/ OR MECHANICAL VENTILATION OF HABITABLE SPACES. FUTURE CHANGES IN BUILDING OCCUPANCY WILL BE SUBJECT TO INTERNATIONAL ENERGY CONSERVATION CODE(S) IN EFFECT AT TIME OF FUTURE WORK. PLEASE PLAN AND SEEK ADVISEMENT OF OUALIFIED DESIGNER TO AVOID RISK OF DEMOLITION, REMOVAL / REPLACEMENT OF INSTALLED MATERIALS DURING LATER PHASES OF CONSTRUCTION. t