HomeMy WebLinkAboutObservation of Excavation 07.25.2023Huddleston-Berry
l;n¡i*ccling .f.'l crt ing, I-l-(l
Project: Parcel 239503309026
2789 RiBrside PðlMy
Gråfld Jurclion, CO. 81501
(s70) 25S8005
lflli¡ûI!r¡,1e3lr¡lurEirs
SOIL OBSERVATION REPORT
Tcchnicien: ErnnualAragon lcview
)bservatlon D¡te: Juty 12,2O23
Client: Rob Ashcraft
PO Box 867
Carbondale
c¡ 8'1623
bhck
Review Date: JuIy 25,2O23
ProjcctNumber: 02585 - 0001
Work OrderNo: 86767
Gootechnical Report No &
Geotechn ical Reporl Bearing 2000
llevelopment or Lot Specific Lot
Gootechnical fu port Tltle:
Geotechnlcal Raport Author:
Parcel 239503309026
HBET
12t7t2022
Sub-Conlractor:
On Slte lrlotification:
Foundation Type:
Proof-roll egulpment:
Þtcavation Llmlts, ft:
Rob Ashcraft
Footing / StemWal
Wak beh¡nd trench conpactor
by
Soil Type Observed: cla6s 6
roposed Type of Structural Fill for l,lext Lift; flA
Anticipated Thickness of Structural Fill, ft: 0
tance below Existlng Ground and locatlon of measurement, lnl
tl,
Ê
o
co(J
& Date of Callbration: 17410 glgl22
Ilensity Counts: 1568
lloisture Counts: 610
Munlelpelity: Glënwood
x
" Surveying and elevation validation are outside of the scope of w ork and w ere not perforrned by HBE[.
x
Lab #: 23-4421 Max. thy fÞnslty, pcf: 134.5
laterial Classification: 3/4' base course
Opt. toisture, %: 6.5 Proctor Type: D1557 C
Spccification: 95 , -2 to +2 D1557
Remarks I
Rock Gorrected Proctor Values:
Not Applicable
g¡i
oatoê2.t,
c
È.P
(J
lr .ioÈÈã
ct
o
Ës
o
=
*
¡Ës
o.!(A J.¡
LO\o-
o
.:
Ë
o
IE
0
:*
ooF
Location
FassProof-roll01 f,,lot Appl¡cable
2 N spot footing 0 0 132.2 6.7 6 98o/o Þss 134.5 pcf @ 6.5 % Mo¡sture
3 S spot foot¡ìg 0 0 128.2 7.2 6 95olo kss 134.5 pcf @ 6.5 % fMoisture
4 South Section 0 0 129.0 7.5 6 96% Fass 134.5 pcf @ 6.5 % ftloisture
5 West Section 0 0 '131.1 5.8 6 97o/o Pass 134.5 pcf @ 6.5 o/o Moisiure
0
Commentg:
Huddleston-Berrl'
Engirrccrin6 & I'crting, LL('
2789 R¡wrslde Padwy
Grarìd Jurc¡íon, CO. 815O1
{970) 255-8005
'!¡üii{!rdgB!dä$rd!1
SOI L OBSERVATION REPORT
Client: Rob Ashcraft
PO Box 867
Carbondale
co 81623
Projeet Parcel 239503309026
ProjeclNumbcr: 02585 - 0001 Technician:
Work Ordcr ilo: 86767 )bservãt¡on flate:
Émanuel Aragon
July 12,2O23
Approval: Ongoing Testirg is Required
leviewed by: Fambhck
Revlew Datc: July 25,2023
Gsotechnical Report Title:
Ge otechnlcal Report Author:
@otechnical Report l,lo & Date:
Geotechnical Report Bearlng Gapacity, psf:
Development or Lot Specüic Roport:
Farcel 239503309026
HBET
02585-0001 121712022
2000
Lot Specif ic
Sub-Contractor:
On Site Notlflcation:
Foundatíon Type:
Proof-roll ogu¡pment:
E¡tcavatlon Llm its, fl:
Rob Ashcraft
Footing / Stem Wall
Waå< behind trench corpactor
by
SoilType Observed: chss 6
roposed Type of Structural F¡ll for Nêxt Lift: clase 6
Anticipated Thlckness of Structural Flll, ft: 1
lance below Bdstlng Ground and locatlon of mea¡urement, ln:
* Surveying and elevation validation are outside of lhe scope of w ork and w ere not perforrned by HBEL
o
ELo
co()
& flate of Galibration: 17410 919122
fÞnsity Counts: 1568
liolsture Counts: 610
l¡lunicipality: genwood
x
x
Lab #: 23-0421 Max. t)ry lþnsity, pcf: 134.5
laterial Classification: 3/4" base course
Opt. Molsture, %: 6.5 Proctor Typei D1557 C
Specification: 95 , -2 to +2 D1557
Remarks /
Rock Gorrocted P¡octor Values
î.lot Applbable
3itl¡ {¡{ro.
=tn
EL
5s(,
c
.oioÈ!: O.*A
d
t..;s
ı
=
j
tËE
o
.Èes{r-
o
tt
>'o
ul
-1
:*
ctoÞ
Location:
fussProof-roll01 l.lot Applicable
2 l,lorth Section 0 131.3 7.2 ô 98% Fass 134.5 pcf @ 6.5 % lvbisture
3 East Section -1 O 129.7 6.3 6 96% l%ss '134.5 pcf @ 6,5 70 fiioisture
4 South Section 10 129.9 6.8 6 97o/o Fass 134.5 pcf @ 6.5 % i/oisture
5 West Section -1 0 132.4 6.2 6 98% Fass 134.5 pcf @ 6.5 % Moisture
Com m ents
Huddleston-Berty
lrngincering ñ I'crting, LL(ì
2789 Rlwrside Pðlwy
Gffü Jurction. CO. 91501
{970} 25S8ûr5
rdiå:Lllqf kgÞlø{snc({ n
SOIL OBSERVATION REPORT
Client: Rob Ashcrâtt
FO Box 867
Carbondale
co 81623
Proiec{: Parcel 239503309026
ProjcctNumbcr: 02585 - 0001 Tcchnician:
Work Order ilo: 86676 Jbservatlon fÞte:
Enunuel Aragon
July 7,2O23
Approval
leviewed by:
Review fÞte:
Ongoing Testirg is Required
Pam black
July 25, 202s
Geolechnlcal Re port Tltle:
Geote chnlcal Report Author:
Geotechnical Report No & Date:
Geotechnlcal Report Bearing Capaclty, psf:
Development or Lot Specific Rsport:
Parcel 239503309026
HBET
02585-0001 12t7t2022
2000
Lot Specific
Sub-Contractor:
On Site Notlflcation:
Foundation Type:
Proof-roll equipment:
Encavation Lim ]ts, tt:
Rob Ashcraft
Footing / Stam Wall
Walk behind ûench conpactor
by
Soil [pe Ob¡erved: class 6
roposed Type of Structu¡al Flll for t¡êxt L¡ft: class 6
Antlclpatèd Thlckness of Structural Fill, lt: 2
lance below Þtistlng Ground and location of measurement, inl
* Surveying and elevation valkJation arè outs¡de of the scope of w ork and w ere not performed by HBFI
o
É
o
co(J
& tlate of Calibration: 17410 919122
' Iþnsity Counts: 15ô8
Moisture Counts: 604
llunicipallty: Glenwood
x
x
Lab #: 23'A421 ftlax. Dry tÞnsity, pcf: 134.5
laterial Classification: 314" base course
Opt. Moisture , o/o:. 6.5 Proctor Type
Specification
D1557 C
95 , -2 to +2 D1557
r¡!
o
(Dl-
Location:I¿;oooo.
=
tt,
ri
5ji
IJ
st:oãå*
¿I
0¡
t--
a,) o\
E
E
c¡
,È¿I Jé
o-
o
0
lt
)ro
ut
-2
Rsmarks /
Rock Corrected Proctor Values:
1 frlot Applicable Proof-roll Fass l.lot Appl¡cablê
-2 O 127.5 5.8 6 9s% Pass 134.5 pcf @ 6.5 % lVloisture2 l,lorth Section
3 EastSection -2 0 131.6 7.2 6 98o/o Pass 134.5 pcf @ 6.5 % ftloisture
4 South Section -2 0 133.0 7.O 6 9S% Fass 134.5 pcf @ 6.5 % Ivloisture
5 West Section -2 0 129.4 5.5 6 96% Pass 134.5 pcf @ 6.5 % Àíoisture
Com m ents
Huddleston-Berry
firgirrccring .* 'l csting, !.1-(l
2789 Risside Pðls€y
Grård JuætÌon, CO. g15Ol
(970) 2558005
r¡{r¡¡¡lvJqtæls{frrlcë¡
SOI L OBSERVATION REPORT
Client: Rob Ashcraft
PO Box 867
C¿rbondale
co 81623
Project Parcel 239503309026
Projectilumber: 02585 - 0001 Tcchnician:
Wórk OÌ.ler ¡ùo: 86628 Jbservatlon fÞte:
Alex Brow n
July 5,2023
Approval: Ongoing Testing is Required
leviewcd by: Fam black
Revlew ûale: July 25,2023
Geotechnlcal RÉport Title :
Ge otochnlcal Roport Author:
Geotechnical Report No & Date:
Geotochn¡csl Report Bearing Capaclty, psf:
Development or Lot Speciflc Report:
Farcel 239503309026
HBET
02585-0001 12t712022
2000
Lot Specific
Sub.Contractor:
On Slte l{otificalion:
Foundalíon Type:
Proof-roll equlpment:
Etcavation Llmlts, ft:
Rob Ashcroft
lvlono-Slab
Walk behind trench corpactor
by
Soll Type Obge¡ved: l.lalive (CL)
roposed Type of Structural Fall for iúext Lift: Class 6
Anticipated Thlckness of Structural Fill, ft: 1
lance below Existing Ground and location of measuroment, ini
ot
o
Êoo
& D¡te of G¡libration: 4335 919122
Deneity Counts: 2603
fllolsture Counts: 711
Mun¡cipâl¡ty: Glenwood
x
* Surveying and elevation valirjalbn are outside of the scope of w ork and w ere not perf ormed by HBE[.
x
Lab f: 22-0946 Max. Dry tþnsity. pcf: f 05.5
laterial Classificetion : (CL)
Opt. Moisture,'/":. 15.5 Proctor Type
Specification
D698 A
Proof-Roll
Y '.jot¡rDL
-.t,
ê
E:o
(J
g
g-'oÈËå
o
ud.
ı
=
{t
ooF
Locatlon:
1 Boltom of foot¡ng excavations
:j$|¡-¡ã
åå
-3
*
at,tt t¡
o.
Remarks J
Rock Corrscted Proclor Valuesi
¡¡o Doflection ObservedProof-rolf Fass
2 l,lortheast Section -3 30 116.2 9.5 6 98% Pass 118.5 pcf @ 11.5 % Àiþisture
3 llorth Section -3 10 106.1 12.3 6 97o/o fàss 109.8 pcf @ 14.2V' Moisture
4 Center of House -3 20 110.7 14.5 6 97% Pass 114-2 pcl @ 12.8 olo tvloisture
5 W€st Section -3 10 106.3 13.1 6 g7o/o Pass 109.8 pcf @ 14.2o/o Moisture
tom m ents: Did 2 additional Tests @ the South West and Ëast areas of the pad as w ell, South West= 102.0@14.4% w I a Oo/o coreection
needed -ANF East= 114.9@11.5 w/ a 30% correction,
¡;-t'ì'_l
Huddleston-Berry
Enginecring,& I'esting, LLC
2t89 Rilêrsid€ PåflflÉy
Grand Juncl¡on, CO, 81501
(970) 2558005
ir{cnÊlelllËrr¡ ûþ,r ysjù¡:
REVIEW of CONSTRUCTION
Gllent; Rob Ashcraft
FO Box 867
Carbondale
co 81623
ProJec[ Parcel 239503309026
Prolect Number: 02585 - 0001 Technlcian: Jesse Lueras
Work Order t{o: 86530 Observation Date: June 28,2023
Type of Work Soil
Revlewed by: Jesse Lueras
Review Date: June 28,2023
General Contractor: Subcontractor: on Site l{otification:
Erplanation:
A representative of Huddleston Berry Engineering and lbsting (HBET arri\ed on site as requested to obsene the open
hole excaratim. Contractor did not scarifr and moisture condition the bottom along with the excawtion not being wide
enq/gh at the northtrcstern section of the trenches. There wse also laqe boulders that required remo\€|. Reinspection
required.
Diagrams: