Loading...
HomeMy WebLinkAboutApplicationGørfield County Community Development Department 108 8th Street, Suite 401 RL Glenwood Springs, CO 81601 (s7ol e4s-82L2 d\tJü lj /,üuww.sarfield-countv.com GARFIË COMM BUILDING PERMIT APPLICATION Commercial/Multi-Family Demolition Manufactured Home (Sinele or Multi-Level) I Residential (SF, Duplex orTownhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET 1281 County Road 129 Glenwood Springs, CO 81601 Reid and Zoey Weissbeck 936-4154 Ema ir Address: raweissbeck@ gmail.com Property Owner: Mailing Address: Phone: (72O I ^^-Â___¡^-. Built Better Carpentryuontractor:19-2123Phone Mailing Address: E_^:, ^rr_^_^. builtbettercc@gmail.comEmar¡ Aodress: Architect: Kyle Hoehnen 781 1427Phone: ( N/AMailing Address: F__:, ^ rr-_-_" kyle @formworkshop.comtmarl Adoress: 440 ) Kyle Swartz 655-9118 N/A Email Address:kyle@censpace.com plron", (303 Mailing Address Engineer: 1¡¡or¡. Renovation/Remodel and increase energy efficiency of 1940s horryl 1281 County Road 129 Glenwood Springs CO 81601 N/A Phone: 218502300027 1032 Height Lot Describe Job Address: Block ,000 Property Size (Sq. Ft. or Acres); Manufactured Home lnstaller: Assessor's Parcel Number: Sub. Owner's Valuation of Work: Sq. Ft. of Building:1032 # of Floors:1 Mailing Address Email Address: Class of Work:New f,Remodel/Alteration , [l leOaitlon ,,t; Garage:ched Detached ISeptic:OWÏS Community Type of Heat Natural Gas Propane Electric Other Driveway Permit: pt Permit #: Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division" Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. I herebycertifythat lhave read thisApplication and thatthe information contained above istrue and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of th¡s Appl¡cation, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, ifthe location, construction or use ofthe structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby provided the I have read rmation d the Notice and Certification above, as well as, have correct and rate to the best of my knowledge. DateOwner Print and Sign 6æ a.ha&/aNp/72/lÆSpecial Conditions: Êu':iþfr:'üÞ Plan Check Feeu<4 O'-1 'yizï/6 Manu. Home Fee:wn TotafFees: -í645. ar 'äii"q Balance Du ,g/2,Vø v)-Qr--.q^Aq, BP No otrVls trlo: t"t0ffi7,4 oCC Group: t RC const. rloþ D Zonine:R3 Signed Approval shau4 Date tu BUITDING / PLANNING DIVISION : Gørfield County BU'LDING DEPARTMENT 7A8 Eighth street, Su¡te 407, Glenwood Springs, CO 81607 Tel: (97o) 945-8212 PLAN RE VIEW CHECKLIST n¿Rr-09¿t-8æ8Permit No: Building lssues Planning/Zoninglssues re q,þh'na-7 Nrf Su Plan Septic cks 30% aa Ae / Attach Residential Plan Review List ¿/ Subdivision Plat Notes Ø Engineered Foundation Dríveway Permit pite Fire Department Revíew Valuation Determinationf Fees Red Line Plans/ Stamps/ Stícker Attach Conditions Applicatíon Signed Parcell Schedule No. 40# Snowload Letter - Manu. Homes Soils Report tlAdHnrn¿anL Property Líne Setbacks 35 ft. Stream Setbacks Flood Plaín Building Height Grade/ Topography 40% Planning lssues Subdivísion Plat c.r*Hä:,tr#f _/ tl/Å 22rgêe Descrintion &Summarv: .' /1/4 N14 lr0lZx /a5 = a !'aeÞ/ l ø,//ryt ra /aa-h an f au, /zo, o 0 Perrodel h rinTrvte ØVf ffiuen7 ln cri,q- /r4ç l*f /V'il*,u ENERGY COIVI PLIAÑCE SHEET REQU IREI\/IENTS : Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018 IECC and Glimate Zone 5 Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of the building to be conditioned inside the envelope (and label or otherwise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Path. Prescriptive: Cross Sections of insulated assemblies including the selected material/ R-Value and U-Values to comply with IRC Table R402.1.2. U-Factor Alternative: Provide a ResCheck Reporto Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) Manual J Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. . SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigation report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to submit a building permit application". Design specifications to include roof and deck snow load, wind and seismic design and frost depth.. Foundation plan showing complete footing and foundation dimensions". Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. . Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. sigOwner Print:Date: * l- z3