HomeMy WebLinkAboutConditions of PermitCONDITIONS O F PERMIT
BLCO -06-23-8242
Clough Sheep Company Compressor Station
Replace Existing Housing of Air Compressor and Air Drying Packages
Township:ó Ra nge:94 Section:21 - LaVLong: 39.5001 BN/-1 07.905553W
Parcel:2175221 001 40
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL BUILDING CODE (l.B.C.)AND
MANUFACTURER'S INSTALLATION I NSTRUCTIONS.
2) ALL WORK MUST COMply W|TH CONDTTTONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LOCKS, LATCHES AND LANDTNGS SHALL COMPLY WITH 2015 lBC, SECTION 1010.1.9 -
DOOR LATCH TO BE OPERABLE FROM INSIDE WITHOUT A KEY OR SPECIAL KNOWLEDGE.
s) pRovtDE A LANDTNG OUTSTDE THE EXTERIOR DOOR. CAN BE 7" BELOW THE INTERIOR
o) CONTRACTOR TO VER|Fy CDOH CERT|FTCATTON PR|OR TO SCHEDULING BUILDING FINAL
INSPECTION
7) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINALAPPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
B) LtcHT AND VENTTLATTON pER 2015 rBC, CHAPTER 12 AND 2015 IMC CHAPTER 3-4
9) HIGH STRENGTH BOLTING / FIELD WELDING (IF ANY PERTAINS), SHALL BE REOUIRED BY
SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT TO BE AVAILABLE FOR
BUILDING FINAL.
1O) GARFIELD COUNTY FINAL / COMPLETION INSPECTION IS REOUIRED.
1 1) PROV|DE AN EXCAVATTON OBESERVATTON REPORT FROM A GEOTECH ENGINEER AT THE
FOOTING INSPECTION, 2OOO PSF TO BE VERIFIED.