Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO -09-23-8287 TEP Rocky Mountain LLC Electric Pump Building Lat: 39.4888ó31 N Log: -1 08.1 209956 Parcel : 2171 3320001 9 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (I.B.C.)AND MANUFACTURER'S INSTALLATION I NSTRUCTIONS. 2) ALL WORK MUST COMPLY WITH CONDITIONS OF THE CURRENT LAND USE PERMIT. ¡) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 4) PROCESS PIPING IS NOT REVIEWED, E.O.R. RESPONSIBILITY FOR THIS ASPECT. S) LOCKS, LATCHES AND LANDINGS SHALL COMPLY WITH 2015 IBC, SECTION 1010.1.9 - DOOR LATCH TO BE OPERABLE FROM INSIDE WITHOUT A KEY OR SPECIAL KNOWLEDGE. ¿) PROVIDE A LANDING OUTSIDE THE EXTERIOR DOOR. CAN BE 7" BELOW THE INTERIOR 7) ELECTRTCAL PERMTTTTNG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. B) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12 AND 2015 IMC CHAPTER 3-4 9) HIGH STRENGTH BOLTING / FIELD WELDING (IF ANY PERTAINS), SHALL BE REOUIRED BY SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT TO BE AVAILABLE FOR BUILDING FINAL. 1O) GARFIELD COUNTY FINAL / COMPLETION INSPECTION IS REOUIRED. 1 1) HEATING SYSTEM IS sKVA _ ENERGY CODE DOES NOT APPLY.