Loading...
HomeMy WebLinkAboutEngineer's Letter 10.21.2022SI( PEIGHTAL ENGINEERS Ltd STRUCTU RAL' CON SU LTANTS TO ATTN FROM DATE PRO,|ECT PROJECT No. ¡ Endeavour Projects . Rick Perrin rick@rickperrin.com . Adrienne Prosser, PE . 21 October2o22 . Conklin Residence r 21063 This memo is written in response to your request for a header substitution for the project listed above. Per the Roof Framing Plan Notes on Sheet SlL1: All headers, unless noted otherwise, shall be (3)- 2x10 or (2) I yz" VL with 2" rigid insulation. lt is desired that these headers be (2)- 2x10. Based on the spans of these headers, and the imposed loads, this is an acceptable substitution. 21063 Memo 2022-L0-21 PO Box 410. Basalt, Colorado .8162L.970.927.9510. skpe.structural@gmail.com www, sk peig h taleng inee rs.c o m MEMORANDUM