HomeMy WebLinkAboutEngineer's Letter 10.21.2022SI( PEIGHTAL ENGINEERS Ltd
STRUCTU RAL' CON SU LTANTS
TO
ATTN
FROM
DATE
PRO,|ECT
PROJECT No.
¡ Endeavour Projects
. Rick Perrin rick@rickperrin.com
. Adrienne Prosser, PE
. 21 October2o22
. Conklin Residence
r 21063
This memo is written in response to your request for a header substitution for the project listed
above.
Per the Roof Framing Plan Notes on Sheet SlL1: All headers, unless noted otherwise, shall be (3)-
2x10 or (2) I yz" VL with 2" rigid insulation. lt is desired that these headers be (2)- 2x10.
Based on the spans of these headers, and the imposed loads, this is an acceptable substitution.
21063 Memo 2022-L0-21
PO Box 410. Basalt, Colorado .8162L.970.927.9510. skpe.structural@gmail.com
www, sk peig h taleng inee rs.c o m
MEMORANDUM