Loading...
HomeMy WebLinkAboutConditions of PermitCOND ¡TIONS OF PERMIT BLCO-0209-22-781 1 ECO DWELLING, LLC ADDITION TO AN EXISTING WAREHOUSE 5 POWERLINE ROAD, RIFLE POWERLINE PROFESSIONAL PARK SUBDIVISION 1) The approved plans are to be on-site for inspections. 2) Sanitary facilities are required to be provided for workers. 3) A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. 4) Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. 5) Drainage across property lines shall not exceed that which existed prior to grading' Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of non-erosive down drains or other devices. ó) All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. 7) Separate Sign Permits are required for any external signs. Please contactthe County Planner for the application. 8) Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 8ó9-3458. Please have the inspector sign the building card or provide written documentation of the inspections. 9) The Electrical Code requires a separate Electrical Permitfor lowvoltagefire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303)8ó9-3458. Please have the inspector sign the building card or provide written documentation of the inspection. 10)This is to be a fully sprinkled building. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. 1 1 )Special lnspections are required for this addition. Typically, in metal buildings all welding and bolting are required to have special inspection. Please provide these reports prior to the final inspection. 12)Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 3000psf. Reports calls for 24" of structural fill. Please have the Geotech verify structural fill. 13)Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 71 3) 14)A Knox Box is required to be mounted adjacenttothefrontdoor. Please contactthe Local Fire District for exact location. 1 5)Any exposed closed cell foam is to be covered with a Thermal Barrier or coated with the appropriate listed coating. 1 ó)The y2" OSB decking for the roof structure and the 1 .1 0" plywood specified on the top of the containers are required to be fire-resistant. Please see the attached code section regarding combustible allowed in Type I and ll Construction. This condition was not part of the original letter but is a requirementto make the installers aware of. 17)lf Hazardous Materials are stored and the quantities are over the allowed amounts in IBC Table 307.1(1)then additional precautions will be required. Typically, Control Areas or listed cabinets are utilized. Control areas are one-hour rooms, the building code allows 4 ControlAreas at grade level. No hazardous materials are to be stored, unless a Hazardous Materials Report is created and approved. The 55 gallons drums of foam insulation are not stored in the building anymore. The insulator is to bring the product when needed. Gurfteld CounQ Community Development Department 09t26t2023 Owner: ECO Dwellings LLC 5 Powerline Road Rifle, CO 81650 Architect: N/A Contractor: ECO Dwellings LLC 5 Powerline Road Rifle, CO 81650 Re: Conditions of Approval Job Address: 5 Powerline Road Dear ECO Dwellings LLC, The plans have been reviewed to the currently adopted codes in Garfield County. lf an item is missed during review, it is the applicant's obligation to comply with all adopted codes in Garfield County. Below is a list of conditions to be addressed during construction. There is no response needed, compliance will be required during field inspections. Documentation is to be provided during construction, if needed. Please contact me if clarification is required. Conditions to be addressed during construction: The approved plans are to be on-site for inspections. Sanitary facilities are required to be provided for workers 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)94s-8212 A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://uryvw.colorado.oov/pacific/dora/DPO Electrical Plumbinq Permits Underground utility locates is the responsibility of the owner or contractor. 81 1 is the Colorado Utility Locate Hot Line. Drainage across property lines shall not exceed that which existed prior to grading. Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of non-erosive down drains or other devices. All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. Separate Sign Permits are required for any external signs. Please contact the County Planner for the application. Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspeclion. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Special lnspections are required for this addition. Typically, in metal buildings all welding and bolting are required to have special inspection. Please provide these reports prior to the final inspection. Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 3000psf. Reports calls for 24" of structural fill, Please have the G verifv structural fill. Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 713) A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location. Any exposed closed cellfoam is to be covered with a Thermal Barrier or coated with the appropriate listed coating. The Tz" OSB decking for the roof structure and the 1 .10" plywood specified on the top of the containers are required to be fire-resistant. Please see the attached code section regarding 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)94s-8212 combustible allowed in Type I and ll Construction. This condition was not part of the original letter but is a requirement to make the installers aware of. A Hazardous Materials Report is to be submitted and reviewed prior to the completion of the addition to the building. lf the quantities are over the allowed amounts in IBC Table 307.1(1) then additional precautions will be required. Typically, Control Areas or listed cabinets are utilized. Control areas are typically one-hour rooms, the building code allows 4 Control Areas at grade level. The responses indicate that the 55-gallon drums of foam insulation would not be stored in the building anymore. The insulator is to bring the product when needed. No hazardous mate¡als are to be stored, unless a Hazardous Materials Report is created and approved. Sincerely, Ißnn thne John Plano Building Official 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)e4s-8212