Loading...
HomeMy WebLinkAboutRevised-Engineer's Design Plan 10.04.2023 2789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com September 6, 2023 Project#00505-0027 Keystone Custom Builders, Inc. PO Box 1807 Grand Junction, Colorado 81502 Attention: Mr. Jarred Eddy Subject: OWTS Design 68 Wilson Lane Rifle, Colorado Reference: Geotechnical Investigation, 68 Wilson Lane, Rifle, Colorado by Huddleston- Berry Engineering & Testing, LLC for Jarred Eddy, July 28, 2023. Dear Mr. Eddy, At your request, Huddleston-Berry Engineering & Testing, LLC completed design of an Onsite Wastewater Treatment System (OWTS) for a new shop building at 68 Wilson Lane in Rifle, Colorado. The site location is shown on Figure 1 – Site Location Map. A site plan is included as Figure 2. Site Description At the time of the investigation, the site was open. However, a small garage structure was present in the southeastern portion of the site. The site sloped moderately down to the north. Site topography is shown on Figure 2. Vegetation consisted primarily of grasses. Vegetation consisted primarily of grasses and weeds with a few trees. The site was bordered to the north by E. 7th Street, to the west and south by open land, and to the east by an existing residence. Subsurface Investigation As discussed in the referenced report, the subsurface conditions at the site were the subsurface conditions at the site were variable. However, Using visual-tactile classification methods, the soil profile in most of the test pits consisted of 1.0 foot of topsoil above reddish tan, moist, soft to medium stiff, structureless sandy loam soils (Soil Type 2A). The loam soils were underlain by tan, moist, medium dense to dense sand with gravel and cobbles (<35% rock, Soil Type 1) to the bottoms of the excavations. Groundwater was not encountered in the subsurface at the time of the investigation. In general, based upon the results of the subsurface investigation, HBET believes that the seasonal high groundwater elevation is deeper than 8.0 feet below the existing grade at this site. The locations of the test pits are shown on Figure 2. Copies of the test pit logs are included in Appendix A. 68 Wilson Ln. #00505-0027 10/04/23 Z:\2008 ALL PROJECTS\00505 - Keystone Custom\00505-0027 68 Wilson Lane\200 - Geo\00505-0027 LR100423.doc 2 Onsite Wastewater Treatment System Seepage Bed Design The design of the absorption system generally follows the requirements of the Garfield County Department of Public Works as outlined in the Garfield County On-Site Wastewater Treatment System Regulations, effective June 2018. The proposed construction at the site is anticipated to include a shop structure with a lavatory and kitchen sink. Based upon the visual-tactile classification of the soils, a Long-Term Acceptance Rate (LTAR) of 0.5 will be utilized for the absorption field design. Infiltrator Systems Quick4 Standard Chambers are proposed. The daily flow of the sewage disposal system is calculated below and a plan and profile of the absorption system are shown on Figure 3. Average Daily Flow = (1 lavatory)(8.4 GPD/lavatory)(1 person)+ (1 kitchen sink)(5.8 GPD/kitchen sink)(1 person)+ (1 travel trailer hookup)(50 GPD/travel trailer hookup) = 65 GPD Soil Treatment Area = (65 GPD / 0.5) = 130 Square Feet Adjusted Soil Treatment Area = (130 SF)(1.0)(0.7) = 91 Square Feet # of Quick4 Chambers = (91 / 12) = 8 Chambers System Installation The installation of the septic tank, plumbing lines, Infiltrators, etc. should be completed in accordance with the Garfield County On-Site Wastewater Treatment System Regulations and Infiltrator Systems, Inc. specifications. In addition, the following construction procedures are recommended:  The septic tank and distribution box should be placed level over native soils that have been scarified to a depth of 8 to 12 inches, moisture conditioned, and recompacted to a minimum of 95% of the standard Proctor maximum dry density, within ±2% of optimum moisture content. However, up to 3-inches of washed rock or pipe bedding passing the 1-inch sieve may be used as a leveling course under the septic tank and/or distribution box.  The bottoms of trenches and backfill around the septic tank and distribution box which will support sewer or effluent lines should be compacted to at least 90 percent of the standard Proctor maximum dry density, within ±2% of optimum moisture content. Pipe bedding should have a maximum particle size of 1-inch.  Vehicular or heavy equipment traffic and placement of structures should not encroach within 10 feet of the septic tank or distribution box. Inspection Schedule Huddleston-Berry Engineering & Testing LLC should be retained to monitor the construction of the OWTS. The following schedule of observation and/or testing should be followed:  Observe the absorption bed excavation prior to placement of Infiltrator chambers.  Observe placement of the septic tank, distribution box, and all connecting sewer and effluent lines prior to backfill. Verify proper fall between inverts. 68 Wilson Ln. #00505-0027 10/04/23 Z:\2008 ALL PROJECTS\00505 - Keystone Custom\00505-0027 68 Wilson Lane\200 - Geo\00505-0027 LR100423.doc 3 Observe and verify installation of the absorption bed prior to placement of cover and backfill. In conformance with Garfield County regulations, HBET will be required to provide the Garfield County Health Department with documentation certifying that the OWTS was placed in conformance to the plan and profile and Garfield County regulations. General Notes The OWTS design was based upon the results of the subsurface investigation and on our local experience. The design is valid only for the proposed construction. We are pleased to be of service to your project. Please contact us if you have any questions or comments regarding the contents of this report. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering 10/04/23 FIGURES Gareld County, CO Developed by Account Number   R210826 Parcel Number   217710300022 Acres 2 Land SqFt 0 Tax Area 021 2019 Mill Levy 66.3370 Physical Address   9 294 COUNTY RD RIFLE 81650 Owner Address   SCHMUESER, LARRY R II & LORI J 68 WILSON LANE RIFLE CO 81650 2019 Total Actual Value   $129,000 Last 2 Sales Date   Price   5/23/2016   $44,000   n/a   $   Date created: 7/11/2023 Last Data Uploaded: 7/11/2023 2:08:10 AM 826 ft Overview Legend Parcels Roads Parcel/Account Numbers Owner Name Lakes & Rivers County Boundary Line TP-1 TP-2 TP-3 55 7 6 2789 Riverside Parkway Grand Junction, CO 81501 Project No.: 00505-0027 Date: 09/06/23 By: MAB 68 WILSON LANE PARCEL#217710300022 FIGURE 2 - SITE PLANTEST PIT C.I. = 2 FT SCALE: 1" = 40' **NOTE: TANK AND BED LOCATIONS APPROXIMATE AND MAY SHIFT SOME DURING CONSTRUCTION BASED UPON SITE TOPOGRAPHY, OWNER PREFERENCE, AND/OR OTHER FACTORS AS LONG AS APPLICABLE SETBACKS ARE MET. ACTUAL LOCATION OF TANK AND BED WILL BE INDICATED ON AS-BUILT DRAWINGS.** TP-5 TP-4 5560 5570 5574 5572 5568 5566 5564 5562 5558 5556 ~24' (10' MIN) ~124' ~51' 60' 110' ~18' ~28' ~226' ~19' ~184' ~34' ~23' 5' MIN 3' 32'~144' NEW SHOP ANTICIPATED WATER LINE REPAIR AREA MINIMUM 500 GALLON TANK STA GRAVEL DRIVEWAY EXISTING SHED TP-6 10/04/23 2789 Riverside Parkway Grand Junction, CO 81501 Project No.: 00505-0027 Date: 10/04/23 By: MAB MINIMUM SETBACKS (UNITS = FT) **OTHER SETBACKS NOT LISTED HERE SHOULD BE IN ACCORDANCE WITH GARFIELD COUNTY OWTS REGULATIONS **USE SWEEP 90'S OR TWO 45'S AT 90 DEGREE BENDS** DETAIL AREA SCALE: 1" = 30' 68 WILSON LANE PARCEL#217710300022 FIGURE 3 - SEPTIC SYSTEM DETAILS 4-INCH DIAMETER SEWER AND EFFLUENT PIPE MEETING ASTM D1785, SCHEDULE 40 OR SDR 35 SEPTIC TANK WITH MINIMUM 500 GALLON CAPACITY ANTICIPATED WATER LINE INFILTRATOR SYSTEMS QUICK4 STANDARD CHAMBERS NEW SHOP INSPECTION PORTS GENERALIZED SYSTEM PROFILE GENERALIZED BED PROFILE COVER SOIL; NATIVE SOILS OR OTHER SUITABLE TOPSOIL. GRADE TO CARRY SURFACE WATER AWAY FROM BED. NONWOVEN, NEEDLE PUNCHED, GEOTEXTILE FABRIC IMMEDIATELY ABOVE CHAMBERS INFILTRATOR SYSTEMS QUICK4 STANDARD CHAMBERS ~51' 5' MIN 3' 32' 10/04/23 APPENDIX A Typed Test Pit Logs Sandy Loam with Organics (TOPSOIL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) Sand with Gravel and Cobbles (<35% Rock), tan, moist, medium dense to dense, structureless (Soil Type 1) Bottom of test pit at 8.0 feet. MC 1 93 7 NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry AT END OF EXCAVATION Dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 6/23/23 COMPLETED 6/23/23 DE P T H (f t ) 0.0 2.5 5.0 7.5 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-1 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 Sandy Loam with Organics (TOPSOIL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) Sand with Gravel and Cobbles (<35% Rock), tan, moist, medium dense to dense, structureless (Soil Type 1) Bottom of test pit at 6.0 feet. NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry AT END OF EXCAVATION Dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 6/23/23 COMPLETED 6/23/23 DE P T H (f t ) 0.0 2.5 5.0 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-2 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 Sandy Loam with Organics (TOPSOIL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) Sand with Gravel and Cobbles (<35% Rock), tan, moist, medium dense to dense, structureless (Soil Type 1) Bottom of test pit at 6.0 feet. NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry AT END OF EXCAVATION Dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 6/23/23 COMPLETED 6/23/23 DE P T H (f t ) 0.0 2.5 5.0 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-3 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 Sandy Loam with Organics (TOPSOIL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) Sand with Gravel and Cobbles (<35% Rock), tan, moist, medium dense to dense, structureless (Soil Type 1) Bottom of test pit at 8.0 feet. GB 1 80432171515 NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry AT END OF EXCAVATION Dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 6/23/23 COMPLETED 6/23/23 DE P T H (f t ) 0.0 2.5 5.0 7.5 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-4 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 Sandy Loam with Gravel, and Cobbles (FILL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) **Front half of pit exposed cement foundation that starts at 4' and goes to 7' Bottom of test pit at 8.0 feet. NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION Dry AT END OF EXCAVATION Dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 6/23/23 COMPLETED 6/23/23 DE P T H (f t ) 0.0 2.5 5.0 7.5 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-5 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 Sandy Loam with Organics (TOPSOIL) Sandy Loam, reddish tan, moist, soft to medium stiff, structureless (Soil Type 2A) Sand with Gravel and Cobbles (<35% Rock), tan, moist, medium dense to dense, structureless (Soil Type 1) Bottom of test pit at 8.0 feet. NOTES GROUND ELEVATION LOGGED BY TEC EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry AT END OF EXCAVATION dry AFTER EXCAVATION --- TEST PIT SIZE EXCAVATION CONTRACTOR Wiseland GROUND WATER LEVELS: CHECKED BY MAB DATE STARTED 9/1/23 COMPLETED 9/1/23 DE P T H (f t ) 0.0 2.5 5.0 7.5 GR A P H I C LO G ATTERBERG LIMITS MATERIAL DESCRIPTION SA M P L E T Y P E NU M B E R FI N E S C O N T E N T (% ) RE C O V E R Y % (R Q D ) BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X PL A S T I C I T Y IN D E X PAGE 1 OF 1 TEST PIT NUMBER TP-6 CLIENT Keystone Custom Builders PROJECT NUMBER 00505-0027 PROJECT NAME 68 Wilson Lane PROJECT LOCATION Rifle, CO GE O T E C H B H C O L U M N S 0 0 5 0 5 - 0 0 2 7 6 8 W I L S O N L A N E O W T S . G P J G I N T U S L A B . G D T 1 0 / 4 / 2 3 Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005