Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 10.12.2023 October 12, 2023 Kevin Wakefield Divide Creek Builders 75B North Second Street Carbondale, Colorado 81623 RE: Structural Observation Letter Bear Wallow Ranch – South Unit Guest Cabin Remodel, Glenwood Springs, Colorado Kevin, As requested, we visited the above site on October 11, 2023 to observe the construction to date for the South Unit Guest Cabin. At the time of the site visit, the rough framing for the remodel was substantially complete. Observations made at the site were as follows: · Observed new framing appeared to be as outlined in the structural drawings by Evolve dated May 10, 2023. At the time of the site visit, the structural framing to date appears to be in general conformance with the structural design intent as outlined in the structural drawings noted above. Should you have any further questions regarding this matter, please feel free to contact our office. Sincerely, Evolve Structural Design LLC Steven R. Edmiston, P.E., S.E. Principal 10/12/2023