HomeMy WebLinkAboutInstallation Observation Letter 11.13.23
November 13, 2023
AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE
Onsite Wastewater Treatment System
4-BR Single-Family Dwelling
7960 County Road 301
Parachute, CO 81635
The referenced onsite wastewater treatment system (OWTS) was inspected November 7, 2023.
At the time of inspection, the OWTS was installed in general conformance with the OWTS
design plans prepared June 2023. Design modifications include placing the septic tank north of
the dwelling rather than south and leachfield more to the north. Please contact WestWater
Engineering for any additional information regarding engineered-design OWTS for referenced
address.
Respectfully,
Dean R. Goebel, MS Hydrogeologist, PG
WestWater Engineering
Reviewed By:
Keith Mendenhall, P.E.
2516 Foresight Circle, #1
Grand Junction, CO 81505
(970) 241-7076
www.westwaterco.com