HomeMy WebLinkAboutAmended Scope-Unheated Shop BuildingColleen Wirth
From:
Sent:
lo:
ccrower@netzero.net
Friday, December 1,2023 9:24 AM
Colleen Wirth
Re: BLRE-10-23-8361 - Klein Steel Shop Building - UPDATESubject:
So after speaking with the building manufacturer, as well as 2 insulation companies it seems that the only way to get r49
insulation in a steel building would be through spray foam,which would need painted for a fire break. Also the building
manufacturer hinted that spray foam could void the warranty due to the possibility of it trapping moisture. Due to the N)
fact that I would only be working in this building 20 or so days a year that it would need to be heated I can't justify the N
added expense. I will not be heating this building SBrianKrein
$
I
>l\s
ç-)
()
LT
s\.s)
-ìRT¡
S
ÈD
1