HomeMy WebLinkAboutConditions of PermitGuffield CounQ
Community l)evelopment Department
12t04t2023
Owner:
CCC-B LLLP
0132 ParkAvenue
Basalt, CO 81621
Architect:
Theodore Guy and Associates
23280 Two Rivers Road, Suite 1
Basalt, CO 8'1621
Contractor:
Tally Ho Construction
0145 County Road 225
Rifle, CO 81650
Re: Conditions of Approval
Job Address: 62 County Road 1 13, Building C
Dear CCC-B LLP,
The plans have been reviewed to the currently adopted codes in Garfield County. lf an item is
missed during review, it is the applicant's obligation to comply with all adopted codes in Garfield
County. Below is a list of conditions to be addressed during construction. There is no response
needed, compliance will be required during field inspections. Documentation is to be provided
during construction, if needed. Please contact me if clarification is required.
Gonditions to be addressed during construction:
Building permits are required for tenants to finish out the spaces.
The approved plans are to be on-site for inspections.
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970) e4s-82r2
Sanitary facilities are required to be provided for workers.
A list of required inspections will be attached to the plans. The State is to permit and
approve the electrical work.
https;//¡444¡vu-qeþrqdq.govlp_eç{ic{dq_ra/DB_O_Eleclrical_Plumþrng_Petmlg
Underground utility locates is the responsibility of the owner or contractor. 81 1 is the
Colorado Utility Locate Hot Line.
Drainage across property lines shall not exceed that which existed prior to grading. Excess
or concentrated drainage shall be contained on site or directed to an approved drainage
facility. Erosion of the ground in the area of discharge shall be prevented by installation of
non-erosive down drains or other devices.
All backflow preventers are required to be tested and certified by a licensed backflow
specialist after installation and prior to issuance of the Certificate of Occupancy.
Separate Sign Permits are required for any external signs. Please contact the County
Community Development website for the application.
Electrical Code compliance will be determined based on field inspections performed by the
State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card
or provide written documentation of the inspections.
The Electrical Code requires a separate Electrical Permit for low voltage fire alarms that has
an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln
inspection with the State Electrical lnspector is required (303) 869-3458. Please have the
inspector sign the building card or provide written documentation of the inspection.
The fire sprinkler ancj aiarm are requireci to be inspected and approved by the Local Fire
Protection District. Please provide shop drawings to the Fire District for review and schedule
the inspections accordingly. Please have the Fire Marshal sign the inspection card when the
rough inspection is approved and when the final inspection is approved.
Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal
for that Fire District prior to backfilling.
Please provide special inspections reports to the Building Department as specified within the
General Notes of the structural drawings.
Geotechnical observation is required when the excavation is complete and written
verification be supplied at footing inspection, 2000psf.
Safety glazing is not designated on the plans. Safety glazing will be checked during the
framing and final inspection. (lBC 2406.4)
Any membrane and through penetrations of the fire resistive construction will be required to
be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet
for the assemblies at the framing inspection. (lBC 713)
A Knox Box is required to be mounted adjacent to the front door, Please contact the Local
Fire District for exact location.
108 h,ighth Street, Suite 401
Glenwood Springs, Colorado 81601
(970)94s-8212
lf the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump
will be required to be one-hour construction. (lBC Table 508.2.5)
The walls surrounding the toilet are to be non-absorbent for a height of 48" and 2' past on
each side of the toilet.
All accessible door hardware shall have a shape that is easy to grip, including pocket and
sliding doors. (ANSI A117.1 - 404.2.6)
4 Accessible parking is to be in place prior to issuance to the Certificate of Occupancy.
Sincerely,
,ßftn thne
John Plano
Building Official
108 Eighth Street, Suite 401
Glenwood Springs, Colorado 81601
(e70)94s-82r2