Loading...
HomeMy WebLinkAboutCorrespondence-Clairificaiton on Overall Work ScopeColleen Wirth latnæ PeVresa4*ah'Ve- C/ao$bah'ans o4 From: ggreenl 31 3@yahoo.com; cameronkbazley@gmail.com; John Plano RE: BLRE-10-23-8403 - Greenhouse remodel @ 3 Seven Oaks is UNDER REVIEW Colleen, See answers below. Let me know if you have any other questions. With approval by Chris Beebe of the use of the plans, we should be good to move forward again. Jeff Sabo From: Co lleen Wirth <cwirth @ga rfield-cou nty.com> Sent: Thursday, November 16, 2023 11:08 AM To: Jeff Sa bo <jeff@ legacyhomesofaspen.com> Subject: BLRE-10-23-8403 - Greenhouse remodel @ 3 Seven Oaks is UNDER REVIEW BLRE-l0-23-8403 - Greenhouse remodel @ 3 Seven Oaks Courtesy Message for Jeff Sabo: l'm starting the code review for the Greenhouse remodel project on Seven Oaks in Homestead Est. You are listed at Project Manager contact with a further note, "do not reach out to the Architect, the Architect is no long with the job." tf you are not the correct party to respond on behalf of the owner, please forward this email to the appropriate parties. To verify / confirm the proposed floor plans meet all applicable adopted land use and building codes, please respond the following: LIST OF OUESTIONS TO RESPOND TO PRIOR TO CONTINUATION OF THE PLAN REVIEW PROCESS: L. What is the proposed floor area in square feet for the lower level attached ADU (Accessory Dwelling Unit!? _828.4-Sq Ft. lnclude total sq ft of the ADU closet, ADU master bedroom, ADU bathroom, ADU powder room, living, kitchen, entry space. 2. ls the existing home, existing ADU fire sprinklered? No 3. 3.a. ls there an existing drywall fire-separation between the attached ADU and the primary dwelling? thr 3.b. Was the existing home {prior to recent demo permit approval) open to the primary residential space? No 4. ls the ADU served by same electrical, propane fuel piping, domestic water and sewer service connections as the primary residence? Yes Jeff Sabo <jeff@ legacyhomesofaspen.com > Monday, December 4,2023 2:55 PM Colleen Wirth 2re.o// /lorkSent: To: Cc: Subiect: A- 0$ OJ.- tt ı(s ) l0 5. 5.a. ls the ADU served by the same building heating and cooling system as the primary residence? Yes 5.b. Perhaps same mechanical equipment / appliances, but different zone or separate programmable thermostats? Zoning and forced air damper¡/zoning 5.c. Willthe mechanical heating equipment for the primary residence remain untouched? No, being replaced. 5.d. W¡ll the mechanical heating equipment for the ADU remain untouched? No, being replaced 6. Will all lighting systems throughout the existing primary residence and ADU be replaced, upgraded or altered? Replaced and upgraded 7. W¡l¡ there be any alterations, upgrades or replacements to the building thermal envelope? lf so, provide insulation detail. No. The existing exterior Log Home walls remain. Upgrading windows to.27 U value 8. Describe work on the application form states: Interior renovation of the complete house, cabinets, mechanical windows door plumbing lighting: 8.a. ls there a proposed window I door schedule or detail including information on types of windows, dimensions, tempered, egress openings, U-factor information? No. Replacing existing windows in openings with Pella Aluminum clad windows per field measurements. Upgrading basement bedroom windows to legal Egress. lnstalling tempered windows in locations as required by code. New U value .27. Please answer questions 1 - 8 at your earliest convenience, I look forward to seeing more detail Have a good day! Colloon W¡rth Building Plans Examiner Garfield County Community Development 108 8th Street, Suite 401 (970) 945-1377 ext 1610 cwi rth (ôga rfie ld-co u ntv.com 2