HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-1 1-23.8458
MARIO & RAMONA PENA
SINGLE-FAMILY DWELLING WITH ATTACHED GARAGE
TBD Rodeo Dr
Grass Mesa Ranch, Lot 43 - 217734300375
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITÊMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMËNTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGAIION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COIVIMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMAION.
5) OPEN HOLE SOTLS REPORT rS REOUIRËD AT FOOTTNG TNSPECTTON AND PRTOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
FOUNDATION DESIGN IS BASED ON AN ASSUMED 1,500 PSF SPECIFIED BY MIC BACA, STRUCTURAL
ENGINEER OF RECORD.
6) pRE-ENGTNEERED ROOF TRUSS SHOP DRAWINGS MUST BE PROVIDED TO BUILDING TNSPECTOR AT
TIME OF FRAMING INSPECTION.
7) PROPANE FUEL TYPE SPECIFIED ON THE PERMIT APPLICAÏION. SEE ATTACHED GARFIELD COUNÏY
LOCALLY ADOPTED AMENDMENTS FOR ANY FUEL INSTALLED IN A CRAWL SPACE / PIT LOCATION.
8) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
9) BLOWER DOOR TEST rS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFTELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
10) PRESCR|pTtVE PATH WrrH RESCHECK SOFTWARE rS CHOSEN FOR ENERGY COMPLTANCE OF THrS
HOME DESIGN. RESCHECK REPORT & WRIGHTSOFT LOAD CALCULATIONS ATTACHED FOR
REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM
INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)AS STAMPED ON COVER SHËET.