RE: BLRE-11-23-8458 - PENA residence TBD Grass Mesa Ranch Lot 43 is PENDING
BLRE-11-23-8458 - PENA res¡dence TBD Grass Mesa Ranch Lot 43 is PENDING
Hello Mario and Mic,
Thank you for your recent submission of new materials for the PENA residence in Grass Mesa.
Correction items 2, 3 and 4 have now been addressed.
When reading through the AMENDED Architectural sheets AL.O and A2.L- l, unfortunately, did not find enclosed - an
accompanying RESCheck report? I find the architectural sheets, the Manual J Report and the Geotechnical
lnvestigation report, but no RESCheck report for PENA? When the RESCheck report is made available, please forward
copy to me at cwirth@garfield-countv.com.
Thanks, have a wonderful New Yearl
Colleen W¡rth
Building Plans Examiner
Garfield Cou nty Commu nity Development
108 8th Street, Suite 401
(970) 94s-1377 ext 1610
cwi rth @ga rfie ld-cou nty.com
From: Colleen Wirth
Sent: Monday, December !8,2023 9:04 AM
To: 'mario@madiganco.co' <mario@madiganco.co>; Mic Baca <studiom.engineer@gmail.com>
Subject: BLRE-11-23-8458 - PENA residence TBD Grass Mesa Ranch Lot 43 is now UNDER REVIEW
BLRE-I1-23-8458 - PENA residence TBD Grass Mesa
Courtesy Message for Mario Pena and Mic Baca:
l'm now completing the initial building code review for the new house in Grass Mesa and will need further
information before releasing this building permit for issuance:
LIST OF ESTIONS:
L. Reading through the submitted blueprints and details, it is not clear what ENERGY COMPLIANCE PATH
is chosen for this home design?
lf you are intending to design the home using 2015 IECC Table R402.L.2 and the PRESCRIPTIVE PATH,
we would like to obtain that statement in writing.
1
lf you are intending to design the home using 20L5 IECC and RESCheck software Table R402.1.4.
PRESCRIPTIVE PAT"H, we would like to obtain that statement in writing along with the accompanying
RESCheck Report(s).
lf you are intending to design the home using 2015 IECC and PERFORMANCE PATH with ERI index
software or a HERSRater, we will need that statement in writing along with the HERSRater report.
Plans must clearly state the chosen energy path, so that it is clear to bulldlng lnspectors, as well as the
owner builder and their window, door, insulation suppliers when at the job site.
2. Architectural Sheet 4L.0 Building Code Analysis lists the 2015 IECC and 2015 IGCC, however Garfield
County has adopted the 2018 lnternational Energy Conservation Code (IECC) and does not enforce nor
has adopted
any sections of the 2015 lnternationalGreen Construction Code.
We ask Sheet 41.0 be resubmitted referencing the currently adopted 2018 lnternational Energy
Conservation Code (IECC), and recommend further referencing the job site in Garfield County is located
in CLIMATE ZONE 58.
t-2-2024 REQUESTED INFORMATION HAS BEEN RECEIVED, thank you!
3. When the septic engineer was preparing the design for the onsite wastewater treatment system, did
they also perform a preliminary test observations for the proposed building foundation location?
No preliminary soils investigation report by a geotechnical engineer was included in the building
application materials, if there is an available report we'd like to read a copy of the findings and scan it
into the building file record.
Please advise lF there is an existing geotechnical engineers report available?
L-2-2O24 REQUESTED INFORMATION HAS BEEN RECEIVED, thank you!
4. Garfield County adopted the 2018 IECC effective on June 30, 2023. A requirement of the building
plans examination process is receiving copy of a MANUAL J REPORT for the specific job site.
SITE PLAN slreet 1 intlicates the home site will be at an approximate elevation between 6,730 and
6,740 ft in elevation.
Sites less than 7,000 ft in elevation must have a WINTER DESIGN TEMPERATURE of MINUS 2 degrees.
The MANUAL J REPORT is required to be submitted along with any other corrected plan sheets BEFORE
the building permit can be issued.
The MANUAL J REPORT must list the correct owner name, correct lot location or job site address, the
actual site elevation data, and correct WINTER DESIGN temperature.
Please work with your chosen mechanical equipment supplier to prepare a MANUAL J REPORT,
Please proofread the completed MANUAL J REPORT to verify all information is correct before
submitting to our offices.
lncorrect information in the remitted MANUAL J REPORT will not be accepted, and will pose further
delays in the review process,
t-2-2O24 REQUESTED ¡NFORMATION HAS BEEN RECEIVED, thank you!
2
ESTED ACTION:
Please resubmit (2) full size paper copies of any REVISED blueprint sheets along with (21 paper copies of any
and all requested reportsto the Garfield County Community Development Department front desk.
Walk-in customers are welcome to visit us between 8:30 am - 4:00 pm weekdays. Garfield County will be
closed on December 22, December 25 and January 1to observe the holiday season.
Colleen W¡rth
Building Plans Examiner
Garfield County Community Development
108 8th Street, Suite 401
(970) 945-1377 extT6LO
cwi rth @ ga rfie I d-co u nty. co m
3