Loading...
HomeMy WebLinkAboutLeach Field Soil Investigation          Project 23‐05  Date: 12/26/23  Kenneth Williams  489 Harmony Way  Silt, CO  81652  719‐371‐4805    RE: Leach Field Soil InvesƟgaƟon  Dear Mr. Williams,  Free Range Engineering (FRE) was asked to perform a visual and tacƟle soil evaluaƟon for leach field  improvements at a residence located at 489 Harmony Way in Silt, Colorado. This memo presents the  invesƟgaƟon details and subsurface condiƟons observed at the residence on Tuesday, December 26,  2023.   Two  borings, idenƟfied as B‐1 and B‐2, were drilled with a truck mounted drill rig using 4‐inch solid stem  auger to total depths of 10.5 feet and 9.5 feet respecƟvely. Samples of the subsurface materials were  obtained from the borings at select depths by driving a split‐spoon sampler. The samples were collected  at depths of 3 feet, 7 feet and 9 feet in boring B‐1 and 4 feet and 8 feet in boring B‐2. Generally, the soil in  both borings correlates to a Type  2 based on USDA Table  10‐1 as presented below with an increasing  percentage of sand and gravel below 7 to 8 feet in the borings.  Ground water was not encountered in the test pits at the Ɵme of excavaƟon. Neither bedrock nor a  limiƟng layer were encountered to the depths explored.   Table  10‐1 Soil Treatment Area Long‐Term  Acceptance Rates by Soil Texture, Soil Structure, PercolaƟon  Rate and Treatment  Level  Soil Type  USDA Soil  Texture   USDA Soil  Structure‐Type  USDA Soil  Structure‐Grade  Treatment  Level 1  (MPI)  Treatment  Level 1  2 Sandy Loam GR 1‐Weak 16‐25 0.6    Respecƞully SubmiƩed,      Kevin Dye, P.E.        AƩachments: Boring LocaƟon Map                           Boring Logs  12/26/23                            Boring LocaƟon Map                            N  Boring B‐1 Boring B‐2  489 Harmony Way