HomeMy WebLinkAboutEngineer's Letter 07.11.2023SI( PEIGHTAL ENGINEERS Ltd STRUCTU RAL CONSULTANTS FIELD REPORT TO ATTN FROM DATE PROJECT PROJECT No. . T. Thompson Construction, lnc. . TerryThompson . Adrienne Prosser, PE . ll July 2023 . Residence Callicotte Ranch Lot 14 . 22011 Those Present TerryThompson,TTC Ryan Thompson, TTC Adrienne Prosser, SKPE On site 5 July 2023, to review roof framing and assess in-place conditions. Rough carpentry appeared to be nearly complete. Overall, workmanship looked good, and the observed work appeared to be per the structural plans except for the following items which were discussed while on site: Item 1: The multi-ply girder trusses in the garage were bearing on the double 2x top plate with no support directly beneath. Provide a wood column directly under the double top plate to align with and match the thickness of the truss plies. Ensure the column tracks to support beam or foundation. Typical at all locations. Item 2: ln Guest Bedroom 2 it was noted that a window had been installed in the west wall (Grid 2.25)lrom Grid C to Grid E. This wall was originally intended as a shear wall. Add shear wall framing to the west face of the east wall at the Guest Primary Closet. Shear wall to extend from Grid G to the bump out for the mechanical chase. Nailing to be per the General Notes on Sheet 5500. Item 3: Observed multiple locations where framing ledgers'attachment exceeded 16" oc as was indicated on plan. This appeared most common at locations where the ledger was backed with a header as opposed to 2x wall studs. Verify (a)- SDS25412 screws are installed into the supporting structure at not more than 16" oc for the full extent of the ledger. Item 4: Noted the (3)- l-8" VL header at Grid J of the Dining Room to be supported at each end with a (2)- 2x6 wood column as opposed to a 4-ply column as indicated on plan. Please see attached Clarification C3. 22013_ FR 2023-07-O5 PO Box 410. Basalt, Colorado .81.627.970.927.9510. skpe.structural@gmail.com www.skpeightalen gineers.com SI( PEIGHTAL ENGINEERS Ltd STRUCTU RAL CO NSULTANTS Item 5: Observed (L)- 2" @ hole and (5)- "tt' Z holes at 2" oc in the (3)- 11.7/8 VL beam on Grid G/2.75-4. These penetrations have been reviewed and found to be acceptable in this condition. Item 6: Observed t3/8" A hole through the center of the VL rafters over the mechanical room approximately 4'-4" south of Grid B. These penetrations have been reviewed and found to be acceptable in this condition. Item 7: Observed !3/+" A hole through the center of the VL rafters over the mechanical room where they bear on the wall at Grid E. These penetrations have been reviewed and found to be acceptable in this condition. Item 8: Verify that solid blocking is provided between all joists and rafters at supports per Paragraph F of the General Notes on Sheet 5500. Item 9: Verify that an LSTA strap is provided at all discontinuous wall plates per Paragraph L of the General Notes on Sheet 5500. The above represents our report of events noted and items discussed and will be relied upon as true and correct by all parties unless notified within (5) working days of receipt 22011, FR 2023-07-05 PO Box 410. Basalt, Colorado .81621" .97O.927.9510. skpe.structural@gmail.com www.s kpeig htalengin eers.com o {fl,^o hn}irI . ]'JU L U LI i LliJr'J lr'ai!ufii"rJt-, I LL $) IFIo Xo tLs-(f)*I $XI TARIIAL ROOF FRAMING TLAN @ 114"=1''O"22011 WALL (3)-1BVL gcovered dinirr HT-57F or WALL o s- CNg o X rf) T.TLATE '-15t16" W ISSUED: 11JULY'23 DRAWN: A7 S I( PEICHTAL ENCINEERS Ltd STRUCTU RAL CONS U LTANTS PO Box 41 0 . Basalt, Colorado 81621 970,927,951 0 . skpe.struclural@gmail.com www,skpeightalengineers.com CLARIFICATION LOT 14 _ CALLICOTTE RANCH CARBONDALE, COLORA2O SHEET: OF: c3.1 2 ADD (2)-2x6'tO COLUMN (?L1E5C&D) lN TLACE VL HEADER IMPLACE (2)-zx6 COLUMN (?LtE? A&9) 5D325312 gCREW5 CONNECNNG ?LY CTO ?LY 9. 3?ACE EQUALLY fO EN5URE AT LEA9T 1B FAgTENER9COLUMN TLY CALL-OUT9 9D525312 gCREW5 CONNECTING ?LY DTO ?LY C. 5?ACEEQUALLY TO EN9UKE AT LEAgT 9 FAgTENERg. OFFSETTO AVO1D INNER ROW OF FASTENER9 INPLACE 2x?.T. DEARING ?LNE VERIFY COLUMN FEARg TIGHI a;\ KEINFORCW COLUMN @314"=1i{"22011 ISSUED: 11JULY 23 DMWN: A7 S I( PEICHTAL ENCINEERS Ltd STRUCTURAL CONSULTANTS PO Box 410. Basalt, Colorado 81621 970.927.9510 . skpe.structural@gmail.com www.skpeightalengineers.com CLARIFICATION LOT 14 _ CALLICOTTE KANCH CARDON)ALE, COLORADO SHEET: c3.2 OF: 2