Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plans
MATERIAL INDICATIONS MASONRY: FIREBRICK FACE BRICK CERAMIC TILE CONCRETE: CONCRETEBLOCK CAST -IN -PLACE and PRECAST LIGHTWEIGHT EARTHWORK: DISTURBED UNDISTURBED STONE/GRAVEL POROUS FILL ALUMINUM STEEL - LARGE SCALE STEEL - SMALL SCALE G INSULATION L LOOSE FILL RIGID ftlltl411i(Ililtftt3111, 111111 111111 111111 ACOUSTIC TILE — GLASS CAULK and SEALANTS: SEALANT w/ BACKER ROD JOINT FILLER —� SETTING BEDS: SANDIMORTAR/ PLASTER �0°o°8rjo� s a . FINISH ROUGH FRAMING/ BLKG-CONTINUOUS BLOCKING - DISCONTINUOUS PLYWOOD - LARGE SCALE TEMPERED HARDBOARD PLASTER/BACKING BOARDS PLASTER w! MTL. LATH GYPSUM WALL BOARD GLASS MESH MORTAR BOARD STONE: STONE VENEER FLOOR COVERING: RESILIENT TILE FLOORING CARPET GRAPHIC SYMBOLS �0, 1 BUILDING OR WALL SECTION REFERENCE DRAWING NUMBER + NEW OR REQUIRED POINT ELEVATION A8.1 + 461.0' EXISTING POINT ELEVATION (PLAN) B ' 268 EXISTING CONTOURS ELEVATION NOTED ON HIGH SIDE A 1 A7.1 ELEVATION NUMBER REFERENCE DRAWING NUMBER 320 NEW CONTOURS ELEVATION NOTED ON HIGH SIDE DETAIL NUMBERTB 1 TEST BORING !Al2 REFERENCE DRAWING NUMBER —� LEVEL LINE 302 ROOM/SPACE NUMBER �B REVISION 101 DOOR DESIGNATION O WINDOW TYPE W1 WALL, FLOOR OR ROOF CONSTRUCTION ASSEMBLY COLUMN REFERENCE GRIDS 01 KEYNOTE PROJECT NORTH GRAPHIC SCALE (IN FEET) DASH &DOT LINE CENTER LINES FLOOR LINES IN _ — EXTERIOR ELEVAT�A�PROJECTED LINES DASH & DOUBLE DOT LINE ------ — — PROPERTY LINES, BOUNDARY LINES DOTTED LINE ARCHITECTURAL ELEMENT HIDDEN OR ABOVE BREAK LINE A � A Y y DISCONTINUOUS DRAWING ABBREVIATIONS A.F.F. ABOVE FINISHED FLOOR LAV. LAVATORY ADJ. ADJACENT LH. LEFT HAND AGG. AGGREGATE L LENGTH A/C AIR CONDITIONING LIN. LINEN ALT. ALTERNATE L.P. LOW POINT ALUM. ALUMINUM A.B. ANCHOR BOLT MH. MANHOLE ANOD. ANODIZED MFR. MANUFACTURE(R) APPROX. APPROXIMATE MAS. MASONRY ARCH. ARCHITECT(URAQ M.O. MASONRY OPENING A.D. AREA DRAIN MATL. MATERIAL(S) ASPH. ASPHALT MAX. MAXIMUM MECH. MECHANIC(AL) BSMT. BASEMENT MEMB. MEMBRANE BM. BEAM MET. METAL ERG. BEARING MIN.(`) MINIMUM, MINUTE B.PL. BEARING PLATE, BASE PLATE MISC. MISCELLANEOUS B.M. BENCH MARK MLU MODERN LIVING UNIT (DESK) BVL. BEVELED MTD. MOUNTED BLKG. BLOCKING BD. BOARD N.R.C. NOISE REDUCTION COEFF. B.O. BOTTOM OF NOW. NOMINAL B.O.0 BOTTOM OF CURB N. NORTH BLDG, BUILDING N.I.C. NOT IN CONTRACT N.T.S. NOT TO SCALE CAB. CABINET NO. OR # NUMBER CPT. CARPET(ED) C.B. CATCH BASIN O.A. OVERALL C.L. CENTER LINE O.C. ON CENTER(S) CLG. CEILING OPG. OPENING CLG.HT. CEILING HEIGHT OPP. OPPOSITE C.T. CERAMIC TILE O.D. OUTSIDE DIAMETER CLR. CLEAR(ANCE) O.R.D. OVERFLOW ROOF DRAIN CLO, CLOSET COL. COLUMN PTD. PAINT(ED) CONC. CONCRETE (CAST -IN -PLACE) PNL. PANEL C.M.U. CONCRETE MASONRY UNIT PTN. PARTITION CONST.JT. CONSTRUCTION JOINT PVMT. PAVEMENT CONT. CONTINUOUS OR CONTINUE PERF. PERFORATE(D) C.JT. CONTROL JOINT PLAS. PLASTER CORR. CORRIDOR RLAM. PLASTIC LAMINATE PL. PLATE D. DEEP,DEPTH PL.GL. PLATE GLASS DID DECK DRAIN PWD. PLYWOOD DET. DETAIL PT. POINT DIAG. DIAGONAL P.T. PRESSURE TREATED CIA, DIAMETER PVC. POLYVINYL CHLORIDE DIM. DIMENSION P.C.F. POUNDS PER CUBIC FOOT DR. DOOR P.L.F. POUNDS PER LINEAL FOOT DWR. DRAWER P.S.F. POUNDS PER SQUARE FOOT DWG. DRAWING P.S.I. POUNDS PER SQUARE INCH P.L. PROPERTY LINE ELEC. ELECTRICAL) RECP. RECEPTACLE EL ELEVATION REF. REFER (ENCE) ELEV. ELEVATOR REFR. REFRIGERATOR 65, EQUAL r§EG_ 0EG1STER 1 �eTM iEN. `r A?R1dF ;u�cu�c, °...CF4,m Mr - EXH. EXHAUST RESIL. RESILIENT EXIST, EXISTING RET. RETURN EXP.JT. EXPANSION JOINT R.A. RETURN AIR EXT. EXTERIOR REV. REVISION(S), REVISED R.H. RIGHT HAND FGL. FIBERGLASS R.O.W. RIGHT OF WAY FIN. FINISH(ED) R. RISER F.A. FIRE ALARM R.D. ROOF DRAIN F.E. FIRE EXTINGUISHER RM. ROOM F.E.C. FIRE EXTINGUISHER CABINET R.O. ROUGH OPENING F.R.T FIRE RETARDANT TREATED FLR. FLOOR(ING) SCH. SCHEDULE F.D. FLOOR DRAIN SHT. SHEET FLUOR. FLUORESCENT SIM. SIMILAR FT. FOOT S.C. SOLIDCORE FTG. FOOTING S.T.C. SOUND TRANSMISSION CLASS FDN, FOUNDATION S. SOUTH SPEC. SPECIFICATION GA. GAGE, GAUGE SQ. SQUARE GALV. GALVANIZED S.S. STAINLESS STEEL GL. GLASS, GLAZING STD. STANDARD GL.BLK. GLASS BLOCK STL STEEL GR. GRADE, GRADING STOR. STORAGE G.W.B. GYPSUM WALL BOARD S.D. STORM DRAIN STRUCT. STRUCTURAL HBD. HARDBOARD HDW. HARDWARE TEL. TELEPHONE HDWD. HARDWOOD TV. TELEVISION HDR. HEADER TEMP. TEMPERED HTG. HEATING THK. THICK (NESS) H.V.A.C. HEATINGNENTILATING/AC THRES. THRESHOLD HT. HEIGHT T&G TONGUE AND GROOVE H. HIGH T.O.C. TOP OF CURB H.P. HIGH POINT T.O.S. TOP OF SLAB H.C. HOLLOW CORE T.O.STL. TOP OF STEEL H.M. HOLLOW METAL T.O.W. TOP OF WALL _ HORIZ HORIZONTAL T. TREAD H.B. HOSE BIB TYP. TYPICAL H.W. HOT WATER HR. HOUR V.B. VAPOR BARRIER V.R. VAPOR RETARDER I.I.0 IMPACT INSOLATION CLASS VERT VERTICAL IN.(") INCH V.G. VERTICAL GRAIN INCL. INCLUDE(D),(ING) VEST. VESTIBULE I.D. INSIDE DIAMETER V.C.T. VINYL COMPOSITION TILE INSUL. INSULATE(D), (ION) INT INTERIOR W.C. WATER CLOSET INV. INVERT WP. WATERPROOFING WT. WEIGHT JAN. JANITOR W.W.F. WELDED WIRE FABRIC JT. JOINT W. WEST, WIDE, WIDTH W/ WITH K.O. KNOCKOUT WDW. WINDOW W.W.M. WELDED WIRE MESH LBL. LABEL W/O WITHOUT LAM. LAMINATE(D) W/D WASHER DRYER WD. WOOD GENERAL NOTES 1. REFER TO ENLARGED PLANS FOR DIMENSIONS, DETAIL REFERENCES AND INTERIOR ELEVATION REFERENCES WITHIN THOSEAREAS. 2. DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE OR COLUMN CENTERLINE, AS INDICATED. 3. THE CONTRACTOR SHALL VERIFYAND COORDINATE ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. NOTIFY THEARCHITECT OFALL DISCREPANCIES OR INCONSISTENCIES. DO NOT SCALE DRAWINGS. 4. WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES AND SPECIFICATIONS THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. DETAILS NOTED AS TYPICAL APPLY TO ALL SIMILAR CONDITIONS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ELSEWHERE ON THE PROJECT. 4. THE DRAWINGS AND SPECIFICATIONS (l. E.; ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY. ITEMS SHOWN IN ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OFA DISCREPANCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR BETWEEN DIFFERENT DICIPLINES, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE ARCHITECT. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK. SHEET INDEX A 0.0 COVER SHEET & PROJECT INFORMATION A 1.1 CODE PLAN A 1.2 CODE PLAN, OCCUPANCY CALC. AND EGRESS A2.0 EXISTING/DEMOLITION PLAN A 2.1 FIRST FLOOR PLAN A 5.1 CONSTRUCTION ASSEMBLIES & DETAILS A 8.1 INTERIOR ELEVATIONS PROJECT DIRECTORY Colorado Rocky Mountain School 1493 106 Road Carbondale, CO 81623 Joe White, Owner's Representative jwhite0crms.org ARCHITECT A4 Architects, LLC 242 North Seventh Street Carbondale, CO 81623 970.963.6760 Olivia Emery, R.A. oemery@a4arc.com GENERAL CONTRACTOR ResCom Construction 512 Orchard Ave Silt CO 81652 Tlm Simons, Owner 970.366.1880 timrescom@msn.com Vicinity Map APPROVED SUBJECT TO NOTED EXCEPTIONS & INSPECTIONS GARFIELD COUNTY P, !II DING D`F- it f` P. NT DATE`'' 'i�Y FIELD COPY NO 1N,!SPE;TIrJI',4 L'd`:TI�01JT THESE PLAt,G i� N SITE Page — rRnAQ rAAAP1IR ,i LU SAGE S701 AfO CELLAR. I.) D� FUT PE HCADMASTI RESIDENCE KAYFP. 6,IILL �.G� ` RESIC NCF DCD -! HUUSE:_.. I' A r CIR x _ORM YURT 0- ORES WAY: - •a TURF K 3� -TURF MAINTENANCE Y.ING FACILITY - ! FIELD i f I SJIA4 DORM TV nFUTURE c I PROPOSP. sDE 04. {} ,- ,.r', AGO '4 — - ACADEhfIG. — IF I mv _ YKUMKIl _-->, i Y. - - LIBRARY i Gf.IEnC BUILDING R4 - n 54CF 'Ui4R[ pfPMIiORT i4 r `jno r, dT rc GE QUAD MHACKE I. I�l 7 THE tARII FACED LW 7�1 RESIDENCE\V }� R - ADO et ^ CRMS PROPERTY ; I� PROJECT SITE (Interior) I Building Overview SCALE.- N.T.S. ' TIT HIVORIC BUILDING NF.'N BUILDING U5H OF BUILDING TO CHANGE NO CHANGE TO BUILDING STRUCTURE TO BE REMOVED /^ VR.l S EDUCATION INSIDE AND OUT SCALE 1'=IN' DECc,BER 2W CENTRAL CAMPUS FOR CONS T/ (UC TION NORTH JUNE 12, 2020A�� A 4 A4 ARCHITECTS TLC 242 NORTH SEVENTH STREET CARBONDALE COLORADO 81623 970.963.6760 FAX 970.963.6761 mailga4arc.00m f 305667 Colorado Rocky Mountain School 970.963.2562 // crms.org BAR FORK KITCHEN AND SERVERY MODIFICATIONS FOR COVID 19 Date Issued For 06.12.20 For Construction 05.16.20 Owner Review 04.28.20 Owner Review Project 19 Drawn By:y: OHE I Cover Sheet LACO .0 BUILDING 2 1994 GYMNASIUM ADDITION FiHE ALAHfv1 ANNUNCIATOR PANEL BUILDING 1 ORIGINAL 1964 STUDENT CENTER 1 FIRST FLOOR PLAN SCALE: 1/16"= 1'0" nasiu EXISTING CONDITIONS 1. Original 1964 Student Center (Building 1): Building Area: Construction Type: Fire Sprinklers: 2. 1994 Gymnasium (Building 2): Building Area: Construction Type: Fire Sprinklers: EXISTING 2-HOUR RATED FIREWALL ucatio 5.16d'8a'l 9 16,502 sf (per IBC Section 202) VB No 7,859 sf VB No 3. The 1994 gymnasium addition included the construction of a 2-hour rated firewall between the gym addition and the existing student center. As part of the 2017 remodel for the Strength and Conditioning Center, the two hour separation was completed between the two buildings. 4. The building has an existing fire alarm and detection system incorporating smoke and heat detectors, manual pull stations and horn and strobe units. This system will be altered as required by the scope of work shown. The scope of alterations to the fire alarm system will be documented in a deferred submittal by the selected alarm system subcontractor. S-2 AREA OF WORK rage SCOPE OF WORK SUMMARY WORK AREA (1,700 sf) Changes are primarily to the kitchen serving area, prompted by health concerns and general improvement of flow and service. No changes to the existing building envelope are proposed. Scope of work includes: • Demolition of existing paritions, doors, plumbing, HVAC and electrical as required by the work • Expansion of serving areas including installation of new full -height partitions, doors, plumbing fixtures, ht fixtures d kitchen appliakces asssociiAd with food servingareas yy �, • Relocation of existindishwa �quipm t 6S1� R � • Minor modifications to kitchen for circulation and additional storage Wjp, • Renovation of finishes, fixtures and HVAC where impacted by work abov All work to be done per IBC 2015 Since the work area does not exceed 50% of the floor area no automatic sprinicli r A' system is required. Egress from the work area and dining hall meets the requirements of Chapter 10 2015 IBC. No structural work is proposed in the work area. All partitions are non -bearing and no existing structural elements will be altered. All electrical work within the work area will meet the requirements of NFPA 70. All mechanical work will meet the requirements of the 2015 IMC. The proposed building alterations will not increase the occupant load of the story by more than 20 percent. 09 ASSEMBLY OCCUPANCY A-3 - GYMNASIUM ASSEMBLY OCCUPANCY A-2 - CAFETERIA EDUCATIONAL OCCUPANCY F RX i RESIDENTIAL OCCUPANCY R-3 STORAGE OCCUPANCY S-3 CRMS Bar Fork Building Building Areas by Occupancy [Type VB - NS] Mark Occupancy Description Area Allowable Area Factor[Table 506.2] Building 1 - Original 1964 Dining Hall D A-2 Cafeteria 6,735 E A-2 Roof Projection @ Loading Dock 160 F A-2 Roof Projection @ Dining Room Porches 2,353 Subtotal 9,248 6,000 G E Classrooms, Bookstore, Etc. Areas 4,700 H E Roof Projection 66 1 E Roof Projection 40 J E Roof Projection 57 K E Roof Projection 67 L E Roof Projection 80 M E Roof Projection 150 Subtotal 5,160 9,500 N R-3 Residential Unit 977 P R-3 Roof Projection 10 o R-3 Roof Projection 30 Subtotal 1,017 7,000 R S-2 Storage @ Receiving Area 811 S S-2 Kitchen Storage 266 Subtotal 1,077 Total Area Building 1 16,502 Building 2 - 1994 Gymnasium A A-3 Gymnasium 7,654 B A-3 Roof Projection 154 C A-3 Roof Projection 51 Total Area Building 2 7,859 6,000 Allowable Areas per Section 506 (2105 IBC) Construction Type VB Notes Fire Sprinklers No A-2/NS Occupancy AAF (At) 6,000 sf A-3/NS Occupancy AAF (At) 6,000 sf EMS Occupancy AAF (At) 9,500 sf R-2/NS Occupancy AAF (At) 7,000 sf Eq. 5-1: Aa = At + INS x If) Aa = allowable area At = Tabular allowable area factor per T506.2 NS = Tabular allowable area factor for NS per T506.2 If = Area factor increase due to frontage If for 1962 Dining Hall = 0.67 See Sheet A1.2 If for 1994 Gymnasium = 0.62 See Sheet A1.2 Building 1 - Original 1964 Dining Hall Actual Area k1lowable Area Cafeteria (A-2) 9,248 10,020 s jb, Lounges, Etc. (E) 5,160 15,865 Residential (R-2) 1,017 11,690 Storage (S-2) 1,077 13,500 Building 2 - 1994 Gymnasium Addition (A 7,859 9,720 A4 ARCHITECTS LLC 242 NORTH SEVENTH STREET CARBONDALE COLORADO 81623 970.963.6760 FAX 970.963.6761 mail C a4arc.com Colorado Rocky Mountain School 970.963.2562 // crms.org BAR FORK KITCHEN AND SERVERY MODIFICATIONS FOR COVID 19 Date I Issued For 06.12.20 For Construction 05.18.20 Owner Review 04.28.20 Owner Review Project No: 1902 Drawn By: OHE Code Plan 0 8 24 48 NORTH T A 1.1 BUILDING 2 1994 GYMNASIUM ADDITION i BUILDING 1 ORIGINAL 1964 STUDENT CENTER CFIRST FLOOR P' 1 / SCALE: 1/16-= P-T �Jraj TO0 /(+� /lo LEGEND ROOM OCCUPANCY TAG: OCCUPANCYGROUP ROOM NAME OCCUPANTLOAD M641 9490CC ROOM OCCUPANCY ROOM AREA _ Indicates Exit Access Door 33" Width = Capacity of 165 Persons _ Indicates Exit Access Door Pair 66" Width = Capacity of 330 Persons Indicates Exit Discharge O Existing door NOT equipped with panic hardware, therefore not considered as exit access door. ONew or existing, exit door equipped with panic hardware and illuminated exit sign. Perimeter Calculati�ons ii. .=JjArQ .'r'C&or increase F = Frontage P = Perimeter W= Open Space Width 1964 Dining Hall Mark Frontage Length (1-1) Open Space Width (w1) Li x wi A 84.3 30 2529.0 B 180.9 30 30 30 5427.0 2544.0 1707.0 C 84.8 D 56.9 E 52.1 30 1563.0 F 40.3 30 1209.0 G 52.0 28 1456.0 H 56.0 30 1680.0 Total (F) 607.3 HH 27.7 0 0.0 Total P 635.0 18115.0 W 28.5 Area Factor Increase If = [F/P - 0.25] W/30 If - 0.67 1994 Gymnasium Addition AA 80.1 30 2403.0 BB 58.8 30 1764.0 CC 74.8 30 2244.0 DID 24.3 30 729.0 EE 20.5 30 615.0 FF 28.8 30 864.0 GG 52.0 28 1456.0 Total (F) 339.3 0 0.0 HH 27.7 P 367.0 10075.0 W 27.5 Area Factor Increase If = [F!P - 0.25] W/30 If 0.62 NORTH 0 8 24 48 \ A4 A4 ARCHITECTS LLC 242 NORTH SEVENTH STREET, CARBONDALE COLORADO 81623 970.963.6760 FAX 970.963.6761 mail@?a4arc.com I�, I OF COS 0. co OLf C3 E C 905667 A Rri���� I !I �I II Colorado Rocky Mountain School 970.963.2562 U crms.org BAR FORK KITCHEN AND SERVERY MODIFICATIONS FOR COVID 19 Date Issued For 06.12.20 For Construction 05.16.20 Owner Review 04.28.20 Owner Review Project No: 1902 -- Drawn By: OHE ('nrqo Dion vv I 1u. 'lrea Calculations, Egress 102 LEGEND 0 HEATING PIPES TO REMAIN i HALL HEATING PIPES EXISTING PARTITION TO BE REMOVED A4 EXISTING DOOR AND FRAME TO BE REMOVED A4 ARCHITECTS LLC 242 NORTH SEVENTH STREET EXISTING LED FIXTURE TO REMAIN CARBONDALE COLORADO 61623 970.963.6760 FAX 970,963.6761 LIGHT FIXTURE TO BE REMOVED. REPLACE mailQa4arc.com LUMINAIRE. GENERAL DEMOLITION NOTES (This Sheet Only) A. NO EXTERIOR WORK TO BE PERFORMED WITHIN THIS SCOPE OF WORK EXCEPT RE -LOCATION OF DISHWASHING HOOD VENT. B. PROTECT ALL FINISHES SLATED TO REMAIN, INCLUDING FIXTURES, FURNISHINGS, WALLS, EXPOSED CEILING FRAMING, CASEWORK AND LIGHTING. REPAIR AND REPLACE IF DAMAGE OCCURS. C. WHERE GWB IS REMOVED FROM CEILING STRUCTURE, CLEAN AND RE -STAIN ISOLATED AREAS FOR NEW FINISH. EVALUATE WOOD TO REMAIN WITH ARCHITECT IN FIELD. D. REMOVE OBSOLETE OR NON-FUNCTIONING PIPES, CONDUIT, DRAINS ETC. IN AREA OF NEW WORK. KEYNOTES (This Sheet Only) O REMOVE (X) SHELVING O REMOVE STAINLESS STEEL SINK (BY OWNER) O REMOVE DISHWASHING EQUIPMENT AND ALL ASSOCIATED PIPING, CONDENSATION HOOD, COUNTERS, ETC. RELOCATE PER NEW PLAN. ® REMOVE (3) SECTIONS OF BASEBOARD HEAT AND RELOCATE ON SAME WALL FURTHER TO THE WEST O REMOVE CABINET HEATER AND PIPING TO IT. C REMOVE DOOR ONLY. JAMBS TO REMAIN. O REMOVE DOOR, JAMBS AND ASSOCIATED FRAMING FOR WIDEST OPENING POSSIBLE. ® EXISTING DATA EQUIPMENT TO BE REMOVED BY OWNER AND RE -INSTALLED IN ELECTRICAL / DATA CLOSET ADJACENT. CEILING MOUNTED CABINET HEATERS TO REMAIN 10 EXISTING WOOD BASEBOARD TO REMAIN 11 REMOVE EXISTING FRAME AND GLAZED BLOCK PARTITION AND S.S. DISH DROP WINDOW 12 REMOVE WINDOW DROP MECHANISM AND SLOPED SHELF ABOVE WINDOW 1$ REMOVE RED TILE FLOORING AND MORTAR IN THE AREA SHOWN HATCHED 74J REMOVE BASEBOARD FOR RE -USE. REMOVE WOOD WAINSCOT TO END OF THIS WALL--APPROX 52 LF. GWB TO REMAIN. NEW ROOF PENETRATION AT NEW DISHWASHING VENT. t6 CUT TRAY RAIL PER NEW CASEWORK PLANS. t7 EXISTING CEILING MOUNTED CABINET HEATER TO REMAIN AND BE FLIPPED N-S FOR BETTER DISTRIBUTION. 18 REMOVE 2 X LEDGERS. RETAIN (X) BASEBOARD. 19 , REMOVE CONDUIT AND OUTLETS BOTH SIDES. NORTH 0 2 6 12 OF 0 Colorado Rocky Mountain School 970.963.2562 // crms.org KITCHEN AND SERVERY MODIFICATIONS FOR COVID 19 Date Issued For - — 06.12.20 For Construction 05.16.20 Owner Review 04.28.20 Owner Review Project No:1902 Drawn By: OHE 1 Existing / Demolition Plan 1 /4" = V-0" rA 2_0 I FrFNn EXISTING PARTITION — NEW PARTITION 'mac EXISTING GLAZED BLOCK FACE A4 ® NEW PARTIAL WALL PARTITION A4 ARCHITECTS LLC 242 NORTH SEVENTH STREET .. LINE OF ACOUSTIC SEPARATION CARBONDALE COLORADO 81623 970.963.6760 FAX 970.963-6761 EXISTING DOOR AND FRAME mail@a4arc.00m �- - - T � NEW DOOR AND FRAME �— INDICATES NEW STAINLESS STEEL COUNTER / CASEWORK OF OOtO 0 FIRE EXTINGUISHER FE1 OU MI CASEWORK DESIGNATION r J 3 5667 V `CJ �, APPLIANCE OR EQUIPMENT DESIGNATION O qf�G GENERAL NOTES (This Sheet Only) A. SEE SHEETA5.1 FOR TYPICAL CONSTRUCTION ASSEMBLIES. B- ROUGH OPENINGS FOR NEW INTERIOR DOORS ADJACENT TO CORNERS SHALL BEGIN 41/2 INCHES FROM INSIDE OF CORNER, U.N.O. O REFER TO LARGER SCALE PLANS AS REFERENCED D. REVIEW LOCATION AND NUMBER OF FIRE EXTINGUISHERS WITH FIRE MARSHALL PRIOR TO PURCHASE AND INSTALLATION KEYNOTES (This Sheet Only) 1 i FLEXIBLE WATER LINE REQ'D FOR COFFEE MAKER O NEW HAND SINK IN LOCATION OF REMOVED 3-COMPARTMENT SINK NEW LOCATION FOR DATA CLOSET. OWNER TO RE -LOCATE EQUIPMENT AND WIRING. ® FOUR NEW WELLS IN EXISTING STAINLESS STL. COUNTER. WITH ELECTRIC HEATING COMPONENT SIMILAR TO EXISTING. O PARTIAL WALL TO ENCLOSE HOSE ELEMENTS © POWER FOR UNDER COUNTER REFRIGERATOR AND SERVING WELL EQUIPMENT. CHISEL FLAGSTONE FLOOR FOR UNDERFLOOR POWER. O PARTIAL WALL, MATCH DOOR HEAD ® THICK WALL TO ENCLOSE HEAT PIPES. VIF WITH ARCH. OPEN SPACE FOR TRASH BARREL 10 FURR WALL IF NECESSARY TO ALIGN FLUSH WITH NEW PARTITION ADJACENT 11 UNDER COUNTER REFRIGERATOR 1P NEW HOT AND / OR COLD WELLS 13 RE -LOCATED BASEBOARD HEAT 14 ALIGN DOOR OPENING WITH INSIDE OF SKYLIGHT Colorado Rocky Mountain School 970.963.2562 // crms.org KITCHEN AND SERVERY MODIFICATIONS FOR COVID 19 Date Issued For I �yI 06.12.20 For Construction 05.16.20 Owner Review 04.28.20 Owner Review Project No: 1902 I Drawn By: OHE Enlarged Plan 1 /4" = 1'-0" NORTH 0 2 6 12 A2ml