HomeMy WebLinkAboutConditions of PermitcoNDriloNs o F PERMIT
BLRE-0 1-24-8505
SCIB LLC
New Single-family dwelling w/ attached garage & finished basement
354 Blue Heron Dr, GWS
lronbridge Ph lll, Flg 1, Lot 41 - 239501230041
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE 1I.N.C.)
AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE |TEMS CONTAINED lN THE
ATTACH ED "GARFIELD COUNTY BU I LDI NG REOUI REMENTS". NU MBER REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSpECT|ONS BY COLORADO STATE EIECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE
FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY
COM M U N ITY DEVELOPM ENT WEBSITE FOR AD DITI ONAL I N FORMATI ON.
s) opEN HOLE SOTLS REPORT rS REOUTRED (TNCLUDTNG COMPACTTON REPORT FOR
STRUCTURAL FtLL)AT FOOTTNG TNSPECTTON AND PR|OR TO ANY CONCRETE POUR.
PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF soil bearing.
o) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUTLDING INSPECTOR AT
TIME OF FRAME INSPECTION.
7) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO
GARFIELD COUNry COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING
FINAL BUILDING INSPECTION / C.O. FINAL.
8) PRESCR|pTtVE PATH USrNG 2018 tECC PRESCRIPTIVE TABLES CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. ZEPHYR DESIGN LOAD CALCS ALSO ATTACHED
FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION
SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.