Loading...
HomeMy WebLinkAboutConditions of PermitcoNDriloNs o F PERMIT BLRE-0 1-24-8505 SCIB LLC New Single-family dwelling w/ attached garage & finished basement 354 Blue Heron Dr, GWS lronbridge Ph lll, Flg 1, Lot 41 - 239501230041 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE 1I.N.C.) AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE |TEMS CONTAINED lN THE ATTACH ED "GARFIELD COUNTY BU I LDI NG REOUI REMENTS". NU MBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSpECT|ONS BY COLORADO STATE EIECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COM M U N ITY DEVELOPM ENT WEBSITE FOR AD DITI ONAL I N FORMATI ON. s) opEN HOLE SOTLS REPORT rS REOUTRED (TNCLUDTNG COMPACTTON REPORT FOR STRUCTURAL FtLL)AT FOOTTNG TNSPECTTON AND PR|OR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing. o) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUTLDING INSPECTOR AT TIME OF FRAME INSPECTION. 7) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 8) PRESCR|pTtVE PATH USrNG 2018 tECC PRESCRIPTIVE TABLES CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. ZEPHYR DESIGN LOAD CALCS ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.