HomeMy WebLinkAboutConditions of PermitCONDITIONS OF P ERMIT
BLRE-02-24-85 1 1
GARDNER DYNASTY TRUST
New Single-family dwelling with crawl space and unfinished basement
9171 H*y 82, Carbondale
23931 84001 06
1 ) ALL WORK SHALL COMply WITH THE 2015 TNTERNATTONAL RESTDENTTAL CODE (l.R.C.) AND 2018
I NTERNATIONAL EN ERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED'GARFIELD COUNTY BUILDING REOUIREMENTS'. NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE l\4lTlGATlON AND
DEFENSIBLE SPACE RECON/MENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COIV|MUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
5) OPEN HOLE SOTLS REPORT tS REOUTRED tNCLUDING COMPACTION REPORT FOR STRUCTURAL FILL
AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF
cEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,000 PSF soil bearing.
6) pRE-ENGtNEERED ROOF TRUSSES. HAVE ENGINEERING FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION.
7) AN ELEVATTON SURVEY, SEALED By A COLORADO LICENSED PROFESSIONAL SURVEYOR, lS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD
COUNry'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
8) RESIDENCE IS SERVED BY LP PROPANE. SEE PLAN ATTACHMENTS FOR LOCALLY ADOPTED
BUILDING AMENDMENTS.
9) NOTE TO OWNER BUILDER: MUST NOT REMOVE VEGETATION FROM 35 FT RIPARIAN ZONE -
MEASURES FROM HIGH WATER MARK.
1 0) NO WORK MAy OCCUR tN THE REOUTRED 35-FT MINIMUN/ SETBACK FROM THE TYPICAL AND
ORDINARY HIGH WATER MARK PER GARFIELD COUNTY LAND USE & DEVELOPMENT CODE, SECTION
7.203. MAPPING & FIELD STAKING OF HIGH WATER MARK SHALL BE PROVIDED BY A LICENSED
SURVEYOR, PROFESSIONAL SURVEYOR OR OTHER OUALIFIED CONSULTANT BEFORE ANY WORK IN
THIS AREA IS ALLOWED.
1 1) BLOWER DOOR TEST tS REOUIRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD
COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
12) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAL/SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH
DEPT.
13) PRESCR|pTtVE PATH USTNG 2018 rECC R402j.2 HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF
THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.