Loading...
HomeMy WebLinkAboutApplicationGarfield County 1l;l l' ,. . ' i t:HB 1 fi / Community Development Department il?tt 108 8th Street, Suite 401 Glenwood Springs, CO 81601' (9701945-8212 www.garfield-countv.com ',,rli.': I i. .; ,.r., iiir'ii; . r BUILDING PERMIT APPLICATION DemolitionCom mercial/Multi-Fami Manufactured Home or Tiny Home (Single or Multi-Level) T Residential (SF, Duplex or Townhome)Reroof Accessory Dwellins Unit (ADU)- MAXIMUM SIZE OF 1,200 SQUARE FEET mking horn @kconsultantsl lc.com / andy@nutrientfarm.com 366-2478970Phone:Property owner: Nutrient Holding LLC Email Address: Mailing Address:PO Box 560 New Castle CO 81647 Phone:I Mailing Address: Email Address: contractor: TBD p6on".1970 p66-2478 370 Maroon Ct New Castle CO 81647Mailing Address: Architect:Kinghorn Consultants, llc Email Address:mking horn @kconsu ltantsllc.com N/A Phone: { )Engineer: Mailing Address: Email Address: Email Address: Phone: ( )Manufactured Home lnstaller; Mailing Address Finish out unfinished basementDescribe Work: 218305200063 4 acres135,000.00 8',Height: Job Address#Coal Ridge Ln, New Castle, CO 81647 Sq. Ft. of Building:1,905 (bsmnt)1 Owner's Valuation of Work:Property Size (Sq. Ft. or Acres): #of Assessoy's Parcel Number: Sub.Lot Block _ RemodeUAlteration Garage: Class of Work: Detached Driveway Permit: I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. 2t15t2024 CommunitySeptic: OtherType of Heat:Propaneatural Gas (existing) Electric Permit #: Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permlts. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Vold-Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement, I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Applicatlon, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. fllExemnt (existing) Property Owner Print and Sign Date speciarconditions: s@ altzzhe/ A/Vb/ V4//S YUE"rc Manu. Home Fee: I Misc. Fees: , N + tRtFS,g,D= fiLi?Blwff!lttr:'w Plan Check Fee:lo0,oa ffi'6',po Balance DugL -,749, /e fr?i-ssrsTotal Fees: a ?g4g, t e Setbacks:, l r1d ul*tor OCC Group: OWTS No: Al,I4L Signed Approval Const. Date BUITDING / PTANNING DIVISION : ^rkD u4 Gurfreld CountY' BUILDING DEPARTMENT 108 Eighth Street, Suite 407, Glenwood springs, CO 81601 Tel: (970) 94s-8212 PI.AN R VI CH CK Lls T Permit No: BLRF-O7-Z/- g5r?5 Building lssues PlanninglTo ning lssues Rury,4t lfr Septic Permit and Setbacks Grade/ Topography 30% oa ttach Residential Pla Sr^+Mivision Plat Notes Fire Department Review Valuation Determination/ Fees Energy Cornpliance Path/Plan Received Plan Reviewer to Sign APPlication Parcel/Schedule No. 40# Snowload Letter - Manuf. Homes Soils Report Property Line Setbacks ttA 35 ft. Stream Setbacks Flood Plain Buitding Height Zoni 4d e pogra phy 4O% Planning lssues ma Su 47/a5/ ,/ o^/LY Eng$neered Foundation Driveway Permit Jmeikrx ,/ /a c/rdrYE n Reviefr List Gradel Line Plans/ Stamps/ Sticker 6a€erzub Attach Conditions Application Signed Des on /qO/ x 73,68 La/4/,# /' -/ ,tfg a a4 rep/ace/7./?nt "/ eK+ o/t.ks ,4fuTr;rr/a/"2 a*b.L /n z%ls #5?B,oo ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30,2023Please provide details showing how building complies / meets Garfield County's adopted 2018 IECC andSl!ma1]g',.!cle.5., Depict and show outline theEructure's building thermal envelope. Outline should clearly show portions of ine building to be conditioned inside the envelope (and label or otherwise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Path. Prescribtive: Cross Sections of insulated assemblies including the selected material/ R-Value and U-Values to comply with IRC Table R402.1.2 . U-Factor Alternative: Provide a ResCheck Report. Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openlngs, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) ManualJ Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. . SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigatton report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to submit a building permit application. . Design specifications to include roof and deck snow load, wind and seismic design and frost depth.o Foundation plan showing complete footing and foundation dimensions. r Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. r Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. if determined by the Building Officialthat additional information is necessary to review the application and/or plans ior compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Gertificate of Occupancy (CO) is issued. Using the building w!!!o_ut a CO wiliOe considered an illegaloccupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Mark Kinghorn (owners rep.) Owner Print:Sign Date ?i15t2024