Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 03.29.24 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 March 29. 2024 Unity Mountain Builders Attn: Luis Vargas Re: Framing Inspection Items 543 Ponderosa Circle Battlement Mesa, Colorado Project No. 223115 Gentlemen: A representative of Weeks & Associates reviewed framing items noted during the framing inspection at the referenced site. 1) We understand there is a floor I-joist below the master bedroom that is spaced 19” from the neighboring joist. We also understand the floor joists installed are 11 7/8” BCI 6000 series I-joists. The joist in question spans no more than 17’-0”. This joist at the spacing noted is sufficient to carry the design loads. 2) We understand the steel beam below the floor is attached to the steel cap plates at the column locations with (4) 5/8”-diameter bolts into the bottom beam flange. This connection is acceptable. If we can be of further assistance, please contact us. Sincerely, Weeks & Associates, Inc. Patrick Sanders, P.E. Gary G. Weeks, P.E. Staff Engineer Structural Engineer