Loading...
HomeMy WebLinkAboutCorrespondence- Changes-Revisions in Lower Level.lnilrkct Colleen Wirth From: Sent: To: david @thrivedesig narchitectu re.com Monday, April 1 5,2024 1 1:25 AM Colleen Wirth; gmz52@aol.com RE: SIM - 11072023-1 change order #5 Lower /ere/floan Ffu'Subject: Good Moring Colteen, Ptease see my Comments in red below. lf you need something more formaI please let me know. Thank You! THRIVE David L. Ortiz Owner / Designer$ 303.931.1084E david@thrivedesiqnarchitecture.com b th rivedesignarchitectu re. com 3491 West Amherst Avenue Denver, Colorado 80236DESIGN From: Colleen Wirth <cwirth@garfield-county.com> Sent: Monday, April 15,202410:45 AM To: david @thrivedesignarchitecture.com; gmz52 @aol.com Subject: SIM - 11072023-1 change order #5 RE: SIMONETTI residence - 55 River Park Ln, Aspen Glen, Lot F-3 David Ortiz, Thrive Design Architecture Gerd Zeller, General Contractor Hello David and Gerd, I am currently reviewing change order #5 to Architectural plan sheet A2.01 dated April 11, 2024, delivered by Gerd Zeller and received in our office on April 12. QUES ONS: L. With the modest reshaping of walkout "flex f bedroom", new bathroom group AND introduction of glazing along exterior fall facing the exterior spiral stairs in space - formerly marked as "unfinished" -- may I re-confirm the subject lower level area is to become part of SIMONETTI residence finished habitable living area as the construction project reaches building final inspection / Certificate of Occupancy final inspections? The Wolkout level will have still have the same unfinished areas per original permit submittol except for the added bathroom adiacent to the Flex Bedroom. The windows were odded only becouse the window manufacture shipped wrong windows (sizes) and Client wanted to incorporate what would have been unused windows in the house ond the unfinished basement areo wos the only areo where they fit. The spoce will remain unfinished. 2. Am I correct understanding the walkout basement at time of building final / certificate of occupancy will have no partially finished basement space. See Comment obove. The lJnfinished oreas will remain with the exception of the added bathroom. 3. Space formerly marked as unfinished 1,506 sq ft "unfinished" is now "finished habitable living area" - save for a modest modification of a basement "utility" room from 96 sq ft to an amended approximate 192 sq ft non-habitable "utility" space (accessing the Simonetti's adjacent existing crawl space). Correct? lncorrect. See comments for questions No.L and No. 2 obove. The South utility room has grown but is still uninhabitable spoce. 4. Change Order #5 dated 4/LL/2024 includes clouded CHANGE ORDER DIRECTIVE #L: Kitchen 1. Furr side wall at Refrigerator. As part of this most recent revision, I request an affirmation the walkout floor plans include no "second kitchen" nor full size kitchen appliances. Please confirm. Wall chonge wos for refrigerator size ot the kitchen on main level. There ore no plans for secondary kitchen or oppliances ot the walkout level thot Thrive Design is aware of. 5. As this is a residential fire-sprinklered building, has the general contractor / sub contractor obtained rough-in reinspect and /or final fire sprinkler re-inspect for the walk out floor plan changes? The office copy inspection card shows this building has received drywall inspection, striving to avoid unintended rework or delays at GarCo building final inspections. Thrive Design has no knowledge of the inspections at this point. The response I received from the contractor (Gerd) was thot the Fire Dept was ok with them movinq the Heads. Written response to items #1 - 5 will be most helpful in supporting the remaining "red lines" and fee calculations for the submitted change order. I am reaching out now to avoid unnecessary confusion and delay at building final inspections. Cordially, Colleen Wirth Building Plans Examiner Garfield County Community Development 108 8th Street, Suite 401 (970) 945-1377 ext't GIO ewlrth @ea rfieId-cou ntv.cont 2