HomeMy WebLinkAboutObservation of excavationBst and Tec*rnotogies April9,2024 AshlyDitlow 3285 County Road 241 New Castle, Colorado 81647 RE: Construction Testing and Observations 3683 County Road 241, New Castle, Colorado Best Engineering Solutions and Technologies Project No. 24-2081 Best Engineering Solutions & Technologies received a request to perform foundation observations on the subject property during various stages of consfuction. The following observations were made on the dates indicated, Shoring Piers _NA_The drilled piers were observed fbr consistency with the original soil and foundation investigation. Piers were constructed in general conformance with standard construction practice and the plans and specifications on site during our visit. OpenExcavation April9,2024 The soil conditions on site during ow observations are consistent with our soil report. Deviations from the soil report are not necessary. Footings & Pad NA Footings and pad formwork were laid out in general conformance with standard construction practice and the plans and specifications on site during our visit. Utilities were installed and observed by others. Foundation Wall Wall formwork, reinforcing steel and UFER ground was laid out in general conformance with standard construction practice and the plans and specifications on site during our visit. Foundation Drain NA Perimeter drains were laid out in general conforrnance with standard construction practice and the plans and specifications on site during our visit. Waterproofing Exterior sprayed-on waterproofing was applied in general conformance with standard construction practice and the plans and specifications on site during our visit. If you have any fi.rther questions, please feel free to contact us. Respectfully Submitted Cuong Vu, Project Engineer Cuong i, Digitally signed by Cuong V U Xln", 2024.04.12 1 8:12:35 , r,i -06'00' '1393 South lnca Street, Denver, Colorado . Psalm 20 Phone: 303.238.1770' Office@BestEnoineerinsUSA.com