HomeMy WebLinkAboutObservation of excavationBst
and
Tec*rnotogies
April9,2024
AshlyDitlow
3285 County Road 241
New Castle, Colorado 81647
RE: Construction Testing and Observations
3683 County Road 241, New Castle, Colorado
Best Engineering Solutions and Technologies Project No. 24-2081
Best Engineering Solutions & Technologies received a request to perform foundation observations on the subject
property during various stages of consfuction. The following observations were made on the dates indicated,
Shoring Piers _NA_The drilled piers were observed fbr consistency with the original
soil and foundation investigation. Piers were constructed in general
conformance with standard construction practice and the plans and
specifications on site during our visit.
OpenExcavation April9,2024 The soil conditions on site during ow observations are consistent with
our soil report. Deviations from the soil report are not necessary.
Footings & Pad NA Footings and pad formwork were laid out in general conformance
with standard construction practice and the plans and specifications
on site during our visit. Utilities were installed and observed by others.
Foundation Wall Wall formwork, reinforcing steel and UFER ground was laid out in
general conformance with standard construction practice and the plans
and specifications on site during our visit.
Foundation Drain NA Perimeter drains were laid out in general conforrnance with standard
construction practice and the plans and specifications on site during
our visit.
Waterproofing Exterior sprayed-on waterproofing was applied in general conformance
with standard construction practice and the plans and specifications on site
during our visit.
If you have any fi.rther questions, please feel free to contact us.
Respectfully Submitted
Cuong Vu,
Project Engineer
Cuong
i, Digitally signed by Cuong
V U Xln", 2024.04.12 1 8:12:35
, r,i -06'00'
'1393 South lnca Street, Denver, Colorado . Psalm 20
Phone: 303.238.1770' Office@BestEnoineerinsUSA.com