Loading...
HomeMy WebLinkAboutConditions of PermitBLGO-03-24-8585 HCB Group / Serna, Francisco Alteration - Proposed Barndominium Gonversion TBD GR 227 , Silt - 2179061 00734 The approved plans are to be on-site for inspections. Sanitary facilities are required to be provided for workers. A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www.colorado.qov/pacific/dora/DPO Electrical Plumbinq Permits Underground utility locates is the responsibility of the owner or contractor. 811 is the Golorado Utility Locate Hot Line. Drainage across property lines shall not exceed that which existed prior to grading. Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of non-erosive down drains or other devices. All backflow preventers are required to be tested and certified by. a licensed backflow specialist after installation and prior to issuance of the Gertificate of Occupancy. Separate Sign Permits are required for any external signs. Please contact the Gounty Planner for the application. Electrical Gode compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. The Electrical Gode requires a separate Electrical Permit for low voltage fire alarms that has an alarm panel and send a notification to the Fire District when under alarm. A Rough-ln inspection with the State Electrical lnspector is required (303) 869-3458. Please have the inspector sign the building card or provide wriften documentation of the inspection. The fire sprinkler and alarm are required to be inspected and approved by the Local Fire Protection District. Please provide shop drawings to the Fire District for review and schedule the inspections accordingly. Please have the Fire Marshal sign the inspection card when the rough inspection is approved and when the final inspection is approved. Any water supply that feeds a fire suppression system is to be inspected by the Fire Marshal for that Fire District prior to backfilling. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 94s-8212 Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 1500psf. Safety glazing is not designated on the plans. Safety glazing will be checked during the framing and final inspection. (lBC 2406.4) Any membrane and through penetrations of the fire resistive construction will be required to be fire-stopped with listed fire stopping assemblies. The contractor is to provide a cut sheet for the assemblies at the framing inspection. (lBC 713) All the clothes dryers installed in closets will require 100 square inches of make up air in the closet enclosure. (lMC 504.5) lf the fire sprinkler system requires a fire pump. Then the Utility Room that houses the pump will be required to be one-hour construction. (lBC Table 508.2.5) The walls surrounding the commercial toilet are to be non-absorbent for a height of 48" and 2' past on each side of the toilet. All shower head control walls are to be at the end of the required 48" maneuvering clearances in front of the shower. (ANSI A117.1 - 1004.11.3.1.1) All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI A117.1 - 404,2.61 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)e4s-82r2