HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-o4-24-8620
Barbi Benton Gradow
Foundation Repairs
934 River Bend Wty, Carbondale
lronbridge Ph ll, PH t-3,Lot246
1) ALL WORK MUST COMply W|TH 2015 TNTERNATIONAL RESTDENTIAL CODE (lRC)AND
ENGINEER OF RECORDS SOIL EVALUATION AND STRUCTURAL REPAIR PLAN.
2l THtS PERMtT tS TSSUED FOR FOUNDATTON REPATRS ONLY. ADDITIONAL REPAIRS TO THE
RESIDENTIAL BUILDING STRUCTURE - IF DEEMED NECESSARY - MAY REQUIRE A
SEPARATE BUILDING PERMIT. IF ADDITIONAL STRUCTURAL DEFICIENCIES ARE
ENCOUNTERED DURING FOUNDATION REPAIR WORK, THEN A SUBSEQUENT
EVALUATION AND STRUCTURAL DETAILS MAY BE DEEMED NECESSARY FROM THE
ENGINEER OF RECORD.
3) ENGINEER OF RECORD SHALL FTELD VERTFY TNSTALLATTON OF 34 PUSH PIERS ALONG
FOUNDATION WALLS AS REFERENCED IN BUILDING APPLICATION. ENGINEER,S
STAMPED APPROVAL REPORT IS REQUIRED AT BUILDING FINAL INSPECTION.
4l tF GAS METER tS DISCONNECTED, A GAS PtPE PRESSURE TEST AND INSPECTION MAY BE
REQUIRED FOR METER RECONNECTION.
5) FTNAL BUtLDtNG tNSPECTTON BY GARFIELD COUNTY BUILDING DEPT lS REQUIRED AFTER
COMPLETION OF FOUNDATION REPAIRS.
\
N
\J
aIt
F
-\
ils