Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-o4-24-8620 Barbi Benton Gradow Foundation Repairs 934 River Bend Wty, Carbondale lronbridge Ph ll, PH t-3,Lot246 1) ALL WORK MUST COMply W|TH 2015 TNTERNATIONAL RESTDENTIAL CODE (lRC)AND ENGINEER OF RECORDS SOIL EVALUATION AND STRUCTURAL REPAIR PLAN. 2l THtS PERMtT tS TSSUED FOR FOUNDATTON REPATRS ONLY. ADDITIONAL REPAIRS TO THE RESIDENTIAL BUILDING STRUCTURE - IF DEEMED NECESSARY - MAY REQUIRE A SEPARATE BUILDING PERMIT. IF ADDITIONAL STRUCTURAL DEFICIENCIES ARE ENCOUNTERED DURING FOUNDATION REPAIR WORK, THEN A SUBSEQUENT EVALUATION AND STRUCTURAL DETAILS MAY BE DEEMED NECESSARY FROM THE ENGINEER OF RECORD. 3) ENGINEER OF RECORD SHALL FTELD VERTFY TNSTALLATTON OF 34 PUSH PIERS ALONG FOUNDATION WALLS AS REFERENCED IN BUILDING APPLICATION. ENGINEER,S STAMPED APPROVAL REPORT IS REQUIRED AT BUILDING FINAL INSPECTION. 4l tF GAS METER tS DISCONNECTED, A GAS PtPE PRESSURE TEST AND INSPECTION MAY BE REQUIRED FOR METER RECONNECTION. 5) FTNAL BUtLDtNG tNSPECTTON BY GARFIELD COUNTY BUILDING DEPT lS REQUIRED AFTER COMPLETION OF FOUNDATION REPAIRS. \ N \J aIt F -\ ils