HomeMy WebLinkAboutEngineer's Framing LetterE1161NEEBS I C0NST0UCT00S
April 26, 2024
Wendy Davis and Alan Schoenbaum
800 W 511 St Apt 505
Austin, TX 78703-5439
Attn: Wendy Davis and Alan Schoenbaum
Re; 360 River's Bend Residence, Carbondale, CO 81623
Dear Ms. Davis and Mr. Schoenbaum:
Project No. 21663
This letter is to confirm that a representative of our office has observed the completed framing at the 360
Rivers Bend residence and has found the structure to be in general conformance with the structural
construction documents. Our office has also received and reviewed the required steel special inspection
reports dated 02/13/24 and 02/14/24 and the required drilled in epoxy anchor special inspection report
dated 04/24/24.
Please advise if we may be of any other assistance.
Thank You,
Walter A. Gorra, M.S. P.E.
Project Manager
'Do .REGI
.�
•:¢ 29954 ?P
Adolf O. Gorra, M.S., P.E.
President
GLENWOOD STRUCTURAL AND CIVIL, INC.
Please visit our website at www.glenwoodstructural.org
812 Pitkin Avenue, Glenwood Springs, CO 816011 email: gsc(q)sopris.net I Phone (970) 928-0135