Loading...
HomeMy WebLinkAboutSpecial Inspectors Final Report 04.24.2024INDUSTRIAL INSPECTION SERVICES Special Inspector's Final Report REPORTE 30 Pier, Bend, Aspen Gien PERMIT # BLRE-07-22-7668 ADDRESS:360 River's Bend, Aspen Glen, Glenwood Springs CONTRACTOR: Kaegebein Fine Homebuilding BUILDING TYPE: WALL TYPE: wood framed / structural steel INSPECTION DATES: Through 8-22-2023 LOCATION IN STRUCTURE: Special Inspection provided to verify epoxy anchor hold down installation as required as detalled and approved by structural engineer (Glenwood Structural Clvll) at main / foundation level per approved details. REMARKS: Verification of Installation of epoxy anchor hold downs per manufacturer's speclfications using Simpson AT- XP. No problems noted. Upon the completion of the work described herein, the work performed, the materials utlized and the processes used for the shop welding for structural steel columns appear to fully comply with the approved plans and applicable Note: Structural steel fabricated and Inspected by others. REMARKS GENERAL: Special Inspection on this project was performed per the special inspection requirements adopted from the 2021 IBC by the Garfleld County Bullding Department as part of the approved plan. ALL WORK REFERENCED ABOVE WITNESSED BY INDUSTRIAL INSPECTION SERVICES PERSONNEL, PERFORMED THROUGH AUGUST, 2023 WAS SATISFACTORILY COMPLETED AND CONFORMS TO THE APPROVED PLANS, THE 2021 INTERNATIONAL BUILDING CODES (IBC), THE ADOPTED PROVISIONS OF THE AWS D1.1 AND THE AISC MANUAL OF STEEL 360, SECTION N. THIS STATEMENT APPLIED DIRECTLY TO THOSE PORTIONS OF THE STRUCTURE WHICH SPECIAL INSPECTION WAS PRESCRIBED AS PART OF THE APPROVED PLANS. DETAILED ACCOUNT OF DAILY EVENTS AVAILABLE UPON REQUEST.PREMILLION Suecial Inspector ef Record: ID Number: