Special Inspector's Final Report
REPORTE 30 Pier, Bend, Aspen Gien
PERMIT # BLRE-07-22-7668
ADDRESS:360 River's Bend, Aspen Glen, Glenwood Springs
CONTRACTOR: Kaegebein Fine Homebuilding
BUILDING TYPE:
WALL TYPE: wood framed / structural steel
INSPECTION DATES: Through 8-22-2023
LOCATION IN STRUCTURE: Special Inspection provided to verify epoxy anchor hold down installation as required as detalled and
approved by structural engineer (Glenwood Structural Clvll) at main / foundation level per approved details.
REMARKS: Verification of Installation of epoxy anchor hold downs per manufacturer's speclfications using Simpson AT-
XP. No problems noted. Upon the completion of the work described herein, the work performed, the materials utlized and
the processes used for the shop welding for structural steel columns appear to fully comply with the approved plans and
applicable
Note: Structural steel fabricated and Inspected by others.
REMARKS GENERAL: Special Inspection on this project was performed per the special inspection requirements
adopted from the 2021 IBC by the Garfleld County Bullding Department as part of the approved plan.
ALL WORK REFERENCED ABOVE WITNESSED BY INDUSTRIAL INSPECTION SERVICES PERSONNEL, PERFORMED THROUGH
AUGUST, 2023 WAS SATISFACTORILY COMPLETED AND CONFORMS TO THE APPROVED PLANS, THE 2021 INTERNATIONAL
BUILDING CODES (IBC), THE ADOPTED PROVISIONS OF THE AWS D1.1 AND THE AISC MANUAL OF STEEL
360, SECTION N. THIS STATEMENT APPLIED DIRECTLY TO THOSE PORTIONS OF THE STRUCTURE WHICH SPECIAL
INSPECTION WAS PRESCRIBED AS PART OF THE APPROVED PLANS. DETAILED ACCOUNT OF DAILY EVENTS AVAILABLE
UPON REQUEST.PREMILLION