Loading...
HomeMy WebLinkAboutOWTS Permit Card  Garfield County Public Health  2014 Blake Ave.   Glenwood Springs, CO 81601  Phone: (970) 945‐6614 ext. 8150  For inspections, call: 970‐945‐6614 ext. 8150 and call the Design Engineer, if applicable   Project Address: 401 County Road 137 Glenwood Springs, CO 81601     Parcel No.: _212325300004  Owner Name: Rue Balcomb      Owner Phone: (970) 618‐0740  Designed By: CBO, Inc /K‐Cronk Engineering    Designer Phone: (970) 309‐5259  Number of Bedrooms: _4_ Minimum Tank Capacity: 1,250‐gallon Minimum Absorption: 560 ft2  OWTS PERMIT   KEEP AVAILABLE AT PROJECT SITE   Permit Number _SEPT‐8626_______________________________  Permit Type X New X Repair X Remodel/addition X Tank only   Issue Date _04/26/2024____________________ Expiration Date_04/26/2025_________________   Permit Conditions:   This OWTS Permit is approved on the condition of compliance with the report and design as  submitted by CBO, Inc. and K‐Cronk Engineering dated April 1, 2024. Changes to the design and  permit must be approved by Garfield County Public Health and the designer prior to construction.     The new OWTS will serve an existing three‐bedroom residence and future 1‐ bedroom ADU and will  replace the existing OWTS on the property. The system will consist of the existing two‐compartment  1,250‐gallon septic tank at the residence and a new, single‐compartment 500‐gallon pump chamber  set level with access at grade with a high‐head pump in the pump chamber. Effluent will be pumped  to an Automatic Distributing Valve (ADV) set level with access at grade that will distribute effluent to  576 ft2 of STA. The new STA will consist of four gravelless chamber trenches, each trench consisting  of 12 Quick4 chambers per trench (48 Quick4 chambers total). Distribution laterals are to be 1 ½ inch  Schedule 40 PVC, with 5/32‐inch orifices 3‐feet on center and the laterals ending in 90‐degree bends  and flushing valves at the distal end of the laterals. Laterals are to be hung from the underside of the  chambers with zip‐ties. The orifices are to be facing upward except for the first and last orifices.  Inspection ports are to be installed at each end of each trench.  Maintain all setbacks and elevations  as designed.    Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final  inspection of the installed system prior to backfill. NO OWTS COMPONENT SHALL BE BACKFILLED  WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC HEALTH AND THE DESIGNER.    Agreement   All installations must comply with all requirements of the Garfield County OWTS regulations  including but not limited to the conditions specified above.   In consideration of the issuance of the permit, the applicant hereby agrees to comply with all  laws and regulations related to the zoning, location, construction, and erection of the proposed  OWTS and associated structures for which this permit is granted. The applicant further agrees  that if the above said regulations are not fully complied with in the zoning, location, erection,  and construction of the above described OWTS and structure, the permit may then be revoked  by notice from the Health Department and immediately become null and void.  The issuance of a permit and specifications of terms and conditions therein will not constitute  assumption of liability, nor create presumption that the local public health agency or its  employees may be liable for the failure or malfunctioning of any system. Permit issuance will  not constitute a certification that the system, the equipment used in the system, or any  component used for system operation will ensure continuous compliance with the provision of  the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.   Permit Approval  Plans and specifications for the proposed OWTS have been reviewed and are considered  satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated  in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from  the date of issuance unless construction on the system has commenced. An "as‐built" drawing  must be submitted and inspection of the system must be completed by GCPH before final  approval of the system will be issued.        04/26/2024  Issued By: Garfield County Environmental Health  Department  Date