Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS o F PERMIT BLRE-04-24-861 1 Scott Fenske New Single-family dwelling w/ attached garage 263 Silver Mountain Dr, GWS lronbridge PUD, PH 1, Lot 1 16 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 201B I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE |TEMS CONTATNED lN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG TNSPECTTON AND PR|OR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,000 PSF soil bearing. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR BUTLDTNG INSPECTOR AT TIME OF FRAME INSPECTION. 8) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFTELD COUNTY COMMUNITY DEVELOPMENT DEPT, OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL 9) ANy CONSTRUCTTON ACTrVrry THAT CHANGES THE BAS|C CHARACTER OR TOPOGRAPHY OF THE NATURAL LAND LOCATED IN THE 1OO-YEAR FLOODPLAIN MUST FIRST OBTAIN A "FLOODPLAIN DEVELOPMENT PERMIT" THROUGH GARFIELD COUNry'S PLANNING DEPT. 10) CAREFUL: MUST NOT REMOVE VEGETATION FROM 35 FT RIPARIAN ZONE - MEASURES FROM HIGH WATER MARK. 1 1 ) A LOT TMPROVEMENT CERTTFTCATE, SEALED BY A COLORADO LTCENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIIVIUM SETBACK REOUIREMENTS / BUILDING ENVELOPE. 12) PRESCR|pTtVE PATH USTNG 2018 rECC TABLE R402.1.2 HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT HAS BEEN SCANNED INTO THE ELECTRONIC FILE FOR FUTURE REFERENCE. CUT SHEET FOR INSTALLATION OF AN ERV HAS BEEN STAPLED TO THE FIELD COPY. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET. 1 3) ADVISORY NOTICE TO OWNER BUILDER: PURSUANT TO ATTACHED PLAT NOTE #6: CONSTRUCTION OF HOMES AT THIS LOCATION SHALL NOT TAKE PLACE DURING THE TIME PERIOD BETWEEN FEBRUARY 1 5 AND MAY 31. \L \) { Lt \st J rn