Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT BLCO-03 -24-8553 GLENWOOD SPRINGS CITADEL SELF STORAGE NEW 2 STORY, CLIMATE CONTROLED SELF STORAGE FACILITY CENTER DRIVE, PARCEL 218506 1 OOO42 COOPER SUBDIVISION, WEST GLENWOOD THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS. SANITARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS. A LIST OF REOUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. UNDERGROUND UTILIry LOCATES IS THE RESPONSIBILIry OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILIry LOCATE HOT LINE. EVALUATE THE OVER TOPPING OF THE DETENTION PONDS DURING LARGER MAGNITUDE STORMS. IN THE INTERIM BETWEEN THE PROPOSED GRADE PLAN AND FINAL BUILDOUT, IT'S TO BE VERIFIED THAT RUNOFF WOULD BE SAFELY CONVEYED THROUGH THE PROJECT WITHOUT DETRIMENT TO ADJACENT PROPERTIES. ALL BACKFLOW PREVENTERS ARE REOUIRED TO BE TESTED AND CERTIFIED BY A LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. SEPARATE SIGN PERMITS ARE REOUIRED FOR ANY EXTERNAL SIGNS. PLEASE SEE THE COUNry'S WEBSITE FOR THE APPLICATION. ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. THE ELECTRICAL CODE REQUIRES A SEPARATE ELECTRICAL PERMIT FOR LOW VOLTAGE FIRE ALARMS THAT HAS AN ALARM PANEL AND SEND A NOTIFICATION TO THE FIRE DISTRICT WHEN UNDER ALARM. A ROUGH-IN INSPECTION WITH THE STATE ELECTRICAL INSPECTOR lS REOUIRED (303)869-3458. Please have the inspector sign the building card or provide written documentation of the inspection. THE FIRE SPRINKLER AND ALARM ARE REOUIRED TO BE INSPECTED AND APPROVED BY THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP DRAWINGS TO THE FIRE DISTRICT FOR REVIEW AND SCHEDULE THE INSPECTIONS ACCORDINGLY. PLEASE HAVE THE FIRE MARSHAL SIGN THE INSPECTION CARD WHEN THE ROUGH INSPECTION IS APPROVED AND WHEN THE FINAL INSPECTION IS APPROVED. ANY WATER SUPPLY THAT FEEDS A FIRE SUPPRESSION SYSTEM IS TO BE INSPECTED BY THE FIRE MARSHAL FOR THAT FIRE DISTRICT PRIOR TO BACKFILLING. PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING DEPARTMENT AS SPECIFIED WITHIN THE GENERAL NOTES OF THE STRUCTURAL DRAWINGS. GEOTECHNICAL OBSERVATION IS REOUIRED WHEN THE EXCAVATION IS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION. THE SOILS REPORT IS REOUIRING 18" OF STRUCTURAL FILL UNDER THE FOOTINGS AND SLAB. IMPORTED STRUCTURAL FILL IS REOUIRED UNDER THE RETAINING WALL FOOTTNGS (3000pSF). ON-SrrE SOrLS CAN BE USED AS STRUCTURAL FILL ON THE REMATNDER OF THE FOOTINGS (2000PSF). COMBUSTIBLE MATERIAL IS LIMITED IN ryPE IAND ryPE II CONSTRUCTION. SEE IBC 603 FOR ALLOWED COMBUSTIBLE MATERIALS. ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE CONSTRUCTION WILL BE REOUIRED TO BE FIRE-STOPPED WITH LISTED FIRE STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE ASSEMBLTES AT THE FRAMING INSPECTION. (lBC 713) A KNOX BOX IS REOUIRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR. PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION. IF THE FIRE SPRINKLER SYSTEM REOUIRES A FIRE PUMP. THEN THE UTILITY ROOM THAT HOUSES THE PUMP WILL BE REOUIRED TO BE ONE-HOUR CONSTRUCTION. (rBC TABLE 508.2.s) ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, tNCLUDTNG POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6) THE UNIT HEATERS SHOWN IN THE STAIR ENCLOSERS ARE NOT TO PROJECT INTO THE EGRESS WTDTH. (lBC 1003.3) AN AIR LEAKAGE TEST IS REOUIRED PRIOR TO PERFORMING THE FINAL BUILDING r NSPECTTON. (r ECC C402.s) THE LOUVERS IN THE MECHANICAL ROOM DOORS ARE TO BE LARGE ENOUGH TO ACCOMMODATE THE RETURN AIR FOR THE FURNACE. A SPRAY APPLIED THERMAL BARRIER IS BEING PROPOSED TO PROTECT THE SPRAY FOAM INSULATION IN THE EXTERIOR WALLS. PLEASE PROVIDE THE BUILDING INSPECTOR WITH THE PRODUCT INFORMATION AND A THIRD-PARTY SPECIAL INSPECTION FOR THE THERMAL BARRIER. THE SNOW MELT SYSTEMS FOR THE NORTH ENTRANCES ARE INDICATED AS DESIGN BUILD. THE AUTOMATIC CONTROLS TO BE VERIFIED DURING INSPECTIONS. C.l0l.t2J Snow- rnd icr'melt rlttem cuntruls' -$nntry' lnd ic:c-mclting lty$lrmii shall includts &llltltnrllic cotrlrultl configurerl l$ lihrl nlT tle s!"ircm whcn tht psvrlri*nt tfln- p€rstum is rhove qroF { l0oc} iud grrecipitation is rlot fxll- ing, and an rutolnalic or nrtnual contrcl that it eonfigurud to shul off when the anr&xr l€mlteralure is abnvE 4{loF t4'Cl-