Loading...
HomeMy WebLinkAboutCorrections and Conditions of ApprovalGaffield Couln$ Community Development Department 05t13t2024 Owner: Garfield County Government 108 8th Street Glenwood Springs, CO 81601 Applicant: High Performance Hangers PO Box 7609 Aspen, CO81612 Architect: Cloud Hill Design, Jeffrey Woodruff 266 Light Hill Road Snowmass, CO 81654 Contractor: Larkin Construction 158 Sopris Avenue Carbondale, CO 81623 Corrections and Conditions of Approval Building A, Building B BLCO-05-24-8659, BLCO-05-24-8660 Job Address: Garfield County Airport Dear Mr. Woodruff, The County Building Department has performed the review on the building permit application and plans for the new building proposed at the above address. There are items that need to be addressed prior to considering issuance of the building permit and items that can be addressed after the issuance of the building permit. Please provide a response letter addressing each item listed in the "ltems to address prior to issuing a building permit". Response not required for the "Conditions to be addressed during construction" but please address if clarification is needed. 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970) 94s-82r2 Re Please provide 2 complete sets of corrected sheets, with clouded areas reflecting changes, for the resubmittal. Corrections to address prior to issuinq a buildins permit: 1 Both sets of drawings are identical. All 4 sets submitted are for Building B, Hanger 3 and 4 Please provide 2 complete sets of drawings for Building A, Hangers 1 and 2. 2 A002 - Travel distance is measured horizontally and vertically. The common path of travel is indicated as measured diagonally. When measured correctly the proposed location of the egress door is overthe allowed 100' maximum common path of travel. (lBC Table 1006.2.1 and 1017.3) 3 4002 - There is a statement indicating the intended use is NOT Storage Group S. IBC Section 311.2 clearly states Aircraft Hangers are an S-1 Occupancy. Please change the statement accordi ngly. 4 A004 - There's a letter inserted on this sheet referencing a project in Moab, Utah. Why is there a letter for a different county and state within the submittal? 5 ,4005 - The interior lighting is indicating using 150w Lepro High Bay Light without a depiction on how many there will be. The closest occupancy within the interior lighting allowances are warehouses. This allows .48 watts per square foot or (28) 150w lights for the entii-e building. Please provide a layout of the lighting forverification. flECC Table C405.3.2(1)l 6 ,4006 - There is a vanity shown under the lavatory in the restroom. Knee and toe clearances are required to be provided under the lavatory. Please address accordingly. (2009 ANSI 4117.1 - 606.2) 7 ,A006 - The lavatory scales at 36" above the floor and is not dimensioned. This lavatory is required io be 34" maximum height. Piease adciress accordingiy. (2009 ANSI Ai 17.i - 606.3) 8 4003 - The window schedule is indicating a 60'x4' polycarbonate window. Please show on the elevation drawings the location of the window(s). 9 Please show the leased boundary, the airport property lines, and the existing airport boundary fence on the Civil Plans. (lBC 107) 10 Provide the vehiele turnaround and additisnal fire hydi=ant per the Fire Marshai's request. ii i have a call anci e-maii to ltrmstrong regarciing siie cjrainage. i would iike to veriiy the proposed site drainage coordinates with the overall airport drainage plan. I assume it does but wanted some verification. lf you can provide info on the subject, it would be appreciated Gonditions to be addressed durinq construction: The approved plans are to be on-site for inspections. Sanitary facilities are required to be provided for workers 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)94s-8212 A list of required inspections will be attached to the plans. The State is to permit and approve the electrical work. https://www.colorado. gov/pacific/dora/DPO Electrical Plumbinq Permits Underground utility locates is the responsibility of the owner or contractor. 811 is the Colorado Utility Locate Hot Line. All backflow preventers are required to be tested and certified by a licensed backflow specialist after installation and prior to issuance of the Certificate of Occupancy. Separate Sign Permits are required for any external signs. Please contact the County Planner for the apPlication. Electrical Code compliance will be determined based on field inspections performed by the State Electrical lnspector, (303) 869-3458. Please have the inspector sign the building card or provide written documentation of the inspections. please provide special inspections reports to the Building Department for bolting and welding. Geotechnical observation is required when the excavation is complete and written verification be supplied at footing inspection, 2000psf' Combustible material is limited in Type I and Type ll Construction. See IBC 603 for allowed combustible materials. All exterior lighting is to be downcast and shielded A Knox Box is required to be mounted adjacent to the front door. Please contact the Local Fire District for exact location. All accessible door hardware shall have a shape that is easy to grip, including pocket and sliding doors. (ANSI A117.1 - 404.2.6) Grab bar backing is to be in place for the toilet at framing inspection. Sincerely, Inftn thne John Plano Building Official CC via e-mail: High Performance Hangers Larkin Construction Cloud Hill Design Laurel Catto Brian Condie Orrin Moon 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 (970)94s-82r2 o511312024 Owner: Applicant: Architect: Garfield Gounty Government 108 8th Street Glenwood Springs, CO 81601 High Performance Hangers PO Box 7609 Aspen, CO 81612 1 Cloud Hill Design, Jeffrey Woodruff, AlA, LEED AB 266 Light Hill Road Snowmass, GO 81654 Gontractor: Larkin Construction 158 Sopris Avenue Garbondale, GO 81623 Re: Gorrections and Conditions of Approval Building A, Building B BLCO-OS-24-8659, BLCO-05-24-8660 Job Address: Garfield Gounty Airport John Plano, Building Official Garfield County 108 Eighth Street, Suite 401 Glenwood Springs, Colorado 81601 Dear Mr. Plano, Gorrections to address prior to issuing a building permit: Both sets of drawings are identical. All 4 sets submitted are for Building B, Hanger 3 and 4. Please provide 2 complete sets of drawings for Building A, Hangers 1 and 2. Attached to this submittal are 2 sets of complete drawings. 2. A002 - Travel distance is measured horizontally and vertically. The common path of travel is indicated as measured diagonally. When measured correctly the proposed location of the egress door is over the allowed 100' maximum common path of travel. (lBC Table 1006.2.1 and 1017.3) 4002 Building Code and Airport Standards- Section 106.2.1 Egress based on occupant load and common path of egress travel distance. ,4002 Shows horizontal distance as 31'-0" and vertical distance oi63'-8" for a maximum travel distance of 94'-8". The maximum common path of egress travel distance (feet) as per Table 1006.2.1 in spaces with one exit or exit access door is 100 feet with an occupancy load of <= 30. The egress doors in Hangers 3 and 4 were moved to the center of the North and South hanger walls, in order to meet the common path of egress travel distance (feet). 3. A002 - There is a statement indicating the intended use is NOT Storage Group S. IBC Section 311.2 clearly states Aircraft Hangers are an S-1 Occupancy. Please change the statement accord i ngly. 4002 Building Code and Airport Standards- Statement updated accordingly. 4.AOO4 - There's a letter inserted on this sheet referencing a project in Moab, Utah. Why is there a letter for a different county and state within the submittal? 4004 Hanger lnsulation- Addressed and updated accordingly 5. 4005 - The interior lighting is indicating using 150w Lepro High Bay Light without a depiction on how many there will be. The closest occupancy within the interior lighting allowances are warehouses. This allows .48 watts per square foot or (28) 150w lights for the entire building. Please provide a layout of the lighting for verification. [IECC Table c405.3.2(1)l 4005 Hanger Lighting- New lnterior High Bays specified. As per ,4007 Hanger Lighting Plan. lnterior High Bay Light- 200w x 9= total of 1800w, 3937 sf . .45 LPD = 1772 < 1800 W, as per C405.3.2.(1). See updated layout on 4105 Hanger Lighting. 6. A0OO - There is a vanity shown under the lavatory in the restroom. Knee and toe clearances are required to be provided under the lavatory. Please address accordingly. (2009 ANSI 41 17.1 - 606.2) 4006 The vanity was removed. The lavatory shown is ANSI complaint and meets 2009 ANSI A1 17 .1.606.2 and 606.3. 7. 4006 - The lavatory scales at 36" above the floor and is not dimensioned. This lavatory is required to be 34" maximum height. Please address accordingly. (2009 ANSI A1 17.1 606.3). AOOO ADA Bathroom - The lavatory is 34" above the floor and is dimensioned (and corrected from 36"). Addressed as per 2009 ANSI A117.1.606.3. 8. 4003 - The window schedule is indicating a 60'x4' polycarbonate window. Please show on the elevation drawings the location of the window(s). 4007 Elevations - An elevation sheet was added and the window schedule (,4003)was updated to reflect a change in the polycarbonate window size. The new window size is 20' x 8' polycarbonate window. g. Please show the leased boundary, the airport property lines, and the existing airpoft boundary fence on the Civil Plans. (lBC 107) Addressed as per Civil Grading and Drainage. 10 Provide the vehicle turnaround and additional fire hydrant per the Fire Marshal's request. Addressed as per Civil Grading and Drainage. 11 I have a call and e-mail to Armstrong regarding site drainage. I would like to verify the proposed site drainage coordinates with the overall airport drainage plan. I assume it does but wanted some verification. lf you can provide info on the subject, it would be appreciated. Addressed as per Armstrong Consultants, lnc. A Lochner Company, Chris Nocks, PE (email to John Plano on 5.13.24): Yes, what they (High Per.formance Hangers) are proposing aligns with the overall drainage plan for the airport. Essentially everything on the east side of the airport drains to the north to intercept the drainage ditch that flows roughly parallelwith the runway. Also, all of the drainage infrastructure installed during the major runway project in 2011/2012 was all sized for ultimate buitdout conditions, so everything we've seen seerns fo be properly sized for full buildout. /-//,% ll,/"'*/ A""/^4/ May 13,2024