Loading...
HomeMy WebLinkAboutMaual J Report+ wrightsoft'Load Short Form Entire House Job: Date: Apr'15,2024 By Project lnformation For:Mike, Perdue/Lot# l9AsPen Glen lo# 19 Golden Bear DR, Carbondale, Co 81623 Design lnformation Glg 93 75 18 H 50 44 Htg -2 68 68 50 57 lnfiltration Outside db fF) lnside db ("F) Design TD ("F) Daily range lnside humidity (%) Moisture difference (gr/b) Method Construction quality Fireplaces Simplified Average 2 (Average) Make Trade Model AHR|ref Effciency Heating input Heating output Temperature rise Actual airflow Airflowfactor Static pressure Space thermostiat ROOM NAME HEATING EQUIPMENT American Standard AMERICAN STANDARD AUHMBOSOACV3\T- 9962867 COOLING EQUIPMENT Make American StandardTrade AIVEREAN STANIDARDCond 4A7M048L1Coil 4TXCB006DS3AHR|ref 8677907Effciency 11.7 EER, 14 SEER Sensible moling 39100 Latent cooling 6900Totalmoling 46000 Actual airflow 1533Airflowfactor 0.046 Static pressure 0.50 Load sensible heat ratio 1.00 91 5 1 115 146 106 136 26 65 2 30 Bfuh Btuh "F cfm cfrn/Btuh in H2O 3010 172 42 3808 4841 3531 4528 872 2169 64 980 416 26u Calculations approved byACCAto meet all requirements of Manual J 8h Ed 97AFUE 80000 76000 55 1 533 0.030 0.50 Btuh Btuh Btuh cfrn ctrn/Btuh in H2O * $ NCIgAVF (cfrn) Ofice Ofice Closet Pantry Kitchen Dining Living Primary Bedroom Closet'1 PrimaryBDRM Bath Closet2 Laundry Restroom Halldoset LowerStairs 10 0 0 13 1 3 2315 28 13 2455 1676 44il 3634 100 751 0 982 224 0 0 121 14 16 230 165 255 240 50 '130 50 68 33 20 65 106 1 1 113 77 205 167 5u 0 45 Clg load (Btuh) HtgAVF (cfrn) Htg load (Btuh) Area (tr) {+ H,Il*gTtt"p.Jg" Ris ht-sdte@ rJ riversa I 2023 23.0.05 RS uo 5085 2O24-Apr-'17 22:55:43 Page 1,g/GCt\...ments\W rigHsoft l-IVAC\LoHl 9 Golden Bear Dr.np Calc = MJ8 Front Door faes: W Hall EnW UpperStairs Lofi Hall Bah Room 1 Bedroom 1 Enty Roof Bedroom 2 Bah Room 2 Living,Rm Ceiling Entire House Oherequip loads Equip. @ 0.98 Latentcooling TOTALS 97 216 93 130 65 221 0 227 45 36 125 3215 3604 1393 492 4319 2863 4624 525 5173 0 1618 975 420 103 1451 2619 2222 382 6969 4 97 109 42 15 130 86 139 16 156 1533 0 74 45 19 5 67 120 102 18 320 1533 1533 RSM 2587 52966 33157 Calculations approved byACCAto meetall requiremenb of Manual J 8h Ed 2587 50875 2092 33390il7 33157 0 1533 d+ urr:gtrtsoft' Right-Suite@ Uriversal 2023 23.0.05 RSU65085 2O24-Apr-17 22:55:43 Page 2ArccN...mer{s\Wrigtisot |-IVAC\LoH19 Golden Bear Dr.np Calc = MJ8 Frort Door faes: W +l wrightsoft'Building Analysis Entire House Job: Date: Apr 15,2024 By lnformation For:Mike, Perdue / Lot# l9Aspen Glen lot# 19 Golden Bear DR, Carbondale, Co 81623 Desi Gonditions Location: Garfield Co Rgnl, CO, USElevation: 6025ftLatrtude: 40"N Outdoor: D'y bulb ('F) Daily range ("F) Wetbulb ('F) Wind speed (mph) lndoor: lndoor temperature ("F) Design TD ("F) Relative humidity (%) Moisture difierence (gr/ b) lnfiltration:Heating -2 15.0 Cooling 9335 (H ) 59 7.5 Method Construction quality Fireplaces Heatigg 68 50 57.2 Simplified Average 2 (Average) cooligg 18 50 44.1 Heati Component Btuh/ff Btuh o/oofload Walls Glazing Doors Ceilings Floors lnfiltration Ducts Piping Humidification Ventilation Adjustrnents Total 5.6 20.3 26.4 4.0 1.4 3.1 1 3660 15074 2137 7301 2638 10065 0 0 0 2092 0 52966 25.8 28.5 4.0 13.8 5.0 19.0 0 0 0 3.9 100,0 Walls Glazing Ventilation Doors lnfiltration Ceilings Cooli Component Btuh/ft3 Btuh % of load Wdls Glazing Doors Ceilings Floors lnfiltration Ducts Ventrlation lntemal gains Blower Adjustrnents Total 1.1 28.9 8.5 2.6 0.0 0.3 2812 21417 691 4896 82 1101 0u7 2390 0 0 33937 8.3 63.1 2.0 14.4 0.2 3.2 0 1.6 7.0 0 100,0 Walls ns Ceilings Doors Glazing Latent Cooling Load = 0 Btuh Overall U-val[e = 0.088 Btuhffi-"F, Window / FloorArea = 28'7 o/o WARNING: windowto floor area ratio =28.7o/o- more than 25%' ERROR: negativewall area in Living Rm Ceiling - checkwindows. d* wriolrtsoft*' ^'d','"; "''-'-'--"' Right-Suite@Uriversal202323.0.05RSU65085 2024-Apr17 22.55:43 Page 1.\,ffi ...mer{s\Wrigitsoft HVAC\LoH 19 Golden Bear Dr.rtp Calc = MJB Frort Door faes: W + wrightsoft'Component Constructions Entire House Job: Date: Apr 15, 2024 Brc ect lnformationP For:Mike, Perdue / Lot# l9Aspen Glen lot$ 19 Golden Bear DR, Carbondale, Co 81623 Design Conditions Location: Garfield Co Rgnl, CO, USElevation: 6025 ftLatitude: 40"N Outdoor: Dry bulb ("F) Daily range ("F) Wetbulb ('F) Wind speed (mph) Cooling 9335 (H ) 59 7.5 lndoor: lndoor temperature ('F) Design TD ('F) Relative humidity (%) Moisture difierence (gr/ b) lnfiltration: Method Constuction quality Fireplaces Heating -2 Heating 68 68 50 57.2 Simplified Average 2 (Average) Cooling 75 18 50 44.1 15.0 Construction descriptions Walls'l2F{sw: Frm wall, stucco ext, 1/2" rrrrood shth, r-25 cav ins, 1/2" gypsum board int fnsh, 2'16" r,riood frm, 16" o.c. stud 12F{sw: Frm uall, vnl ext, 3/8" i,vrod shth, r-25 cav ins, 1/2" gl4psum board int fnsh, 2'*6" unod frm, 16" o.c. stud 12F{sw Frm wall, vnl ext, 1/2" vr,ood shth, r-25 cav ins, 1/2" gypsum board int fnsh, 2'!6" uood frm, 16" o.c. stud 12A{sw: Frm wall, 1/2" gypsum board int fnsh, 2'l4" r,rood frm, 16" o.c. stud 1 2A{sur Frm wall, 1/2" gypsum board int fnsh, 2'16" wood frm, 16" o.c. stud Partitions (none) Windows 2glazing, drout4 airgas, wdfrm mat, drinnr, 1/4"gap, 1/8"thk 2glazing, clr out6 air gas, vrrd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht lnsul R Hts HTIlrl Loss Glg HTM Gain ftTF/Btuh Bluty'ft'Btuh Btuh/ft'1 Btuh 38 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 16.2 21.0 4.40 238 0.70 249 288 537 2866 1876 2370 1824 8937 2925 0 16.2 1024 5.26 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 0 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 5.26 20 45 85 453 297 375 288 1413 946 331 Or Area lj.lalue ff, Btuh/ft{"F 54 0.065n n all n e s all S 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.240 63 0.240 57 65 122 651 426 539 415 2031 180 42 16 134 150 120 108 8 72 34 46 '14 742 862 322 2717 3048 2430 2193 16.'l 1452 682 926 280 15074 506 188 1 592 5616 4477 4042 151 1 364 1257 1 706 516 21417 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 20.3 20.3 20.3 20.3 20.3 20.3 20..3 20.3 20.3 20.3 20.3 20.3 11.9 11.9 11.9 37.4 37.4 37.4 19.1 19.1 37.4 37.4 37.4 28.9 0 0 0 0 0 0 0 0 0 0 0 0 +{J- vwriohtgoft-2024-Apt-17 22:55:43 Page 1AMA...ments\Wrighsofi HVAC\-oH19 colden Bear Dr.np Calc = MJ8 Frort Door fa68: W {t} wrightsoft, H?rr:%*Smary Job: Date: Apr'15,2024 By For:Mike. Perdue/Lot# l9Aspen Glen lot# f 9 Golden Bear DR, Cabondale, Co 81623 Notes: Fresh air Fan Renewair EV-90 ERV Desi lnformation Weatrer: Garfield Co Rgnl, CO, US Winter Design Conditions Outside db -2 lnside db Design TD Heding Summary Summer Design Conditions 93 'F75 'F18 'F H50%44 gr[b Sensible Cooling Equipment Load Sizing Structure 33390 BtuhDucts 0 Btuh Central vent (SER=50% 69 ctrn) 547 Btuh Heat remvervBlower ' 0 Btuh Use manufacfure/s datia 50875 Btuh0 Btuh2092 Btuh 0 Btuh0 Btuh52966 Btuh Outside db lnside db Design TD Daily range Relative humiditv Moisture differerice AHR|ref 8677907 Eficiency Sensible coolino Latentcooling " Total coolino Actual airlloYw Airflowfactor Static pressure Load sensible heat ratio OF OF OF68 68 Stnrcture Ducts Central vent (SER=50% 69 cfrn) Heat recoverv Humidification ' Pioino EquiPiment load lnfiltration Method Construction quality Fireplaces Rate/swino multiolier Equipmenl sensible load Latent Cooling Equipment Load Sizing Structure -1095 BtuhDucts 0 Btuh Central vent (69 cfm) -1683 Btuh HeatrecoveruEquipmentlateniload 0 Btuh EquipmentTotalLoad(Sen+Lat) 33157 BtuhReq.totialcapacityatO.85SHR 3.3 ton Gooling Equipment Summary n 0.9833157 Btuh Simplified Averaoe 2 (Averag"e) Goolino 2581 Heatino 2587 26022 0.38 166 Area (ft') Volume (ff) Air change6/l'rour Equiv.AVF (cftn) Make Trade Model AHR|ref Heating Equipment Summary American Standard AMERICAN STANDARD AUHMBOSOACV3\A- 9962867 26022 0.16 69 97AFUE 80000 Btuh 76000 Btuh55 'F1533 cfrt 0.030 cfrn/Btuh0.50 in H2O Make Trade Cond Coil American Standard AMERICAN STANDARD 447M048L1 4TXCBOO6DS3 Effciency Heatino inout Heatin! output Temoerafure rise Actual airflow Airflowfactor Static pressure Space thermostat 11.7 EER, 14 SEER 39100 6900 46000 1533 0.046 0.50 1.00 Btuh Btuh Btuh cfrn ctrn/Btrrh in H2O Calculations approved byACCAto meetall requirements of Manual J 8th Ed tl* W;:g*Ff*- Ri s ht-sdte@ urive rs I 2 02 3 23.0.0s RS u650 s5 2024-Aptr'17 22:55:43 Page 1^.\,/lCCf,...ments\Wrightsot HVAC\LoW l9 Golden Bear Dr.rtp Calc = MJ8 Front Door faces: W {r wrightsoft'AED Assessment Entire House Job: Date: Apr15,2024 Byr Project lnformation For:Mike, Perdue i Lot# l9Aspen Glen lo# 19 Golden Bear DR, Cartondale, Co 81623 Design Conditions Location: Gaffidd Co Rgnl, CO, USElevation: 6025 ftLatitude: 40'N Outdoor: Dry bulb ("F) Daily range ('F) Wet bulb ("F) Wind speed (mph) Gooling 9335 (H ) 59 7.5 lndoor: lndoor temperature ('F) Design TD ('F) Relative humidity (%) Moisture difierence (gr/l b) lnfiltration: Heating Heating 68 68 50 57.2 Cooling 75 18 50 44.1 -z 15.0 Test for ure Di 0 Hourly Glazing Load 12 IJ 14 15 16 Hour of Day tttt 17 -l =*# 18 19 2011 Maximum hourly glazlng load exceeds avenge by 15.7Ya House has adequate exposurc diversity (AED), based on AED limit of 307o AED excursion: 0 Btuh 6 I .E g t{* X;ltn*--:.*:Right-Sdte@ Uriversal 2023 23.0.05 RSU65085 2O24-Apt-17 22:5543 Page 1,€.ffi,.,.menis\Wrighsfr HVAC\LoW19 colden Bear Dr.np Calc = MJB Front Door faes; W + wrightsoft'Loads for Multiple Orientations Entire House Job: Date: Apr 15,2024 By Project lnformation For:Mike, Perdue/Lot# l9Aspen Glen lot# 19 Golden Bear DR, Cabondale, Co 81623 Design Conditions Location: Garfield Co Rgnl, CO, US Elevation: 6025 ftLatitude: 40"N Outdoor: Dry bulb ('F) Daily range ("F) Wetbulb ("F) Wind speed (mph) 100 Cunent Orientation: HighestCooling Load: Cooling 9335 (H ) 59 7.5 lndoor: lndoor temperature ("F) Design TD ("F) Relative humidity (%) Moisture difierence (gr/ b) lnfiltration: '15.0 Building Orientation Cooling Load ESE Direction Front Door faces S SW Front Doorfaces West Front Doorfaces East Calculations approved byACCAto meet all requirements of Manual J 8th Ed Heating -2 Heating 68 68 50 57.2 W Gooling 75 18 50 44.1 c tn !(EoJD.co O EoF 0 N NW Front Door Nortt Northeast East Southeast South Souhwest West Norhwest Sensible Load (Btuh) Latent Load (Btth) Total Load (Btuh) HeatingAVF (cfm) CoolingAVF (cfm) 30281 0 30281 1317 1317 36057 0 36057 1567 1567 37685 0 37685 1567 1567 36861 0 36861 1567 1567 28818 0 28818 1247 1247 32361 0 32361 1533 1533 33157 0 33157 1533 1533 33898 0 33898 1533 1533 +l+w;*-g"::"Tsg*"Risrrt-sdte@uriversat202323.0.05RSU65085 2O24-Apr17 22:55:47 Page 1A .rccN ...ments\Wrigt{$ft FIVAC!-oS19 Golden Bear Dr.rQ Calc = MJB Frorl Door faces: W 'l1ryw Level 2 Entry Upper Stairsx Bedroom 1 130 cfn 15 cfin Bath Room 1 '&i:,:* X t*"* LiMno Rm Ceilino" X,r* Bath Room 2 X BedrooXb 139 "1n Job #: Peformed for: Mike lot# 19 Golden Bear DR Carbondale, Co 8 1623 Scale: 1 :100 Page 1 Rlght€uite@ Universal 2023 23.0.05 RSU65085 2O24-Apr-17 22t58:08 ...1 HVAC\LoI#19 Golden BearDrrup * Level 1 Dining 146 cfn Entry closet Hall t-auffi 45 cfn X,ur"* Primary Bedroom Garage 115 cfin Kitdren X@*"* 1533 Pantry 97 Lower Stairs X."* 102 cftn LiMng X,*"* Closet 2x Primary BDRM Bath cfn Closet 1 Job #: Pefformed for: Mike lot# 19 Golden Bear DR Cartondale, Co 81623 Scale: 1 : 100 Page 2 Right€uite@ Universal 2023 23.0.05 RSU65085 2024-Apr-17 22:56:08 ...t HVAC\Lot#19 Golden Bear Drru P f wrightsoft'Manual S Gompliance Report Entire House Job: Date By Ag t5,2024 Project lnformation For:Mike, Perdue / Lot# l9Aspen Glen lo$ 19 Golden Bear DR, Carbondale, Co 8'1 623 Cooling Equipment Design Gonditions Outdoor design DB: Outdoordesign WB: lndoor design DB: lndoor RH: 92.7"F 58.5'F 75.0"F 50% SplitAC Anrerican Standard1533 cfm 39'100 Btuh6900 Btuh 46000 Eltuh Sensible gain: Latent gain: Total gain: Estimated airflow: 33937 0 33937 1533 Btuh Btuh Btuh cfrn 75.4"F 61.4"F Entering mil DB: Entering milWB: Manufacturer's Performance Data at Actual Design Gonditions Equipmenttype: Matrufaulurer. Actual airflow: Sensible capacity: Latent capacity: Totalcapacity: Model: 4N M048L1+4TXCB006DS3 115% ofload 0% ofload 136% of load SHR: 85o/o Heating Equipment Design Gonditions Outdoor design DB: lndoor design DB: 0.3"F 68.0'F Gasfurnace American Standard 1533 cfm76000 Btuh Heat loss:52966 Btuh Model: AUHMBO8OACV3\f. 143o/oofload Entering mil DB: 66.5'F Tenrp. rise:50 "F M an ufactu rer's Perform ance Data at Actual Desi gn Cond itions Equipmenttype: Manufacturer: Actual aiffiow: Output capacity: Meets all requirements ofACCA Manual S. d+ rlvriohtsoft.' ^-',.'.,.7*,'.',.,**'"-* Right-Sdte@tiriversal202323.0.05RSU65085 ...ments\WrightsoftHVAC\Loff19 Golden Bear Dr.re Calc = MJ8 Front Door faces: W 2024-Apr17 22:55:48 Page 1^g/4GCN