HomeMy WebLinkAboutConditions of PermitCONDITIONS OF P ERMIT
BLCO-O5 -24-8665
PUBLIC SERVICE COMPANY DBA XCEL
770 CR264
SECURITY BUILDING
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (I.B.C.)AND
MANU FACTU RER'S I NSTALLATION I NSTRUCTIONS.
2) ALL WORK MUST COMply W|TH CONDTTTONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LOCKS, LATCHES AND LANDTNGS SHALL COMPLY WITH 2015 rBC, SECTION 1010.1 .9 -
DOOR LATCH TO BE OPERABLE FROM INSIDE WITHOUT A KEY OR SPECIAL KNOWLEDGE.
5) pROVtDE A LANDTNG OUTSTDE THE EXTERTOR DOOR. CAN BE 7" BELOW THE INTERIOR
6) CONTRACTOR TO VER|Fy CDOH CERT|F|CATTON PRIOR TO SCHEDULING BUILDING FINAL
INSPECTION
7) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
B) LtcHT AND VENTTLATTON pER 2015 rBC, CHAPTER 12 AND 2015 IMC CHAPTER 3-4
9) GARFIELD COUNTY FINAL / COMPLETION INSPECTION IS REOUIRED.
10) pRovtDE AN EXCAVATTON OBESERVATTON REPORT FROM A GEOTECH ENGINEER AT THE
FOOTING INSPECTION TO VERIFY PROPER BEARING CAPACITY.
11) THE FOUNDATTON DOES NOT COMpLY W|TH THE COUNryS ADOPTED 36" FROST DEPTH.
PLEASE PROVIDE AN ALTERITIVE DESIGN FROM THE ENGINEER AT FOOTING INSPECTION.