Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-04-24-8632 JOHN & MARLISSA WESTERFIELD New Single-family dwelling w/ attached garage 15 Horseshoe Ln, Carbondale Aspen Glen, FLG 7, H17 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018 I NTERNATIONAL EN ERGY CONSERVATION CODE (I. E.C.C.) 2) pROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE lTEl\4S CONTAINED lN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERN/tTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCASTAND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR BUILDING INSPECTOR AT TIME OF FRAME INSPECTION. 8) BLOWER DOOR TEST tS REOUtRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 9) A LOT TMPROVEMENT CERT|FtCATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK REOUIREMENTS / BUILDING ENVELOPE. 10) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSTONAL LTCENSED SURVEYOR, lS REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 1 1) PRESCR|pTtVE PATH USrNG 2018 tECC TABLE R402.1.2 HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET. (NO ERV, EXHAUST ONLY SYSTEM I NSTALLED PER ARCHITECT). \tt \.\\ N N