HomeMy WebLinkAboutEngineer's Design Revision 05.02.24
Notice Of Revision to OWTS
May 2, 2024
Meeker Sand & Gravel Project
110 Gas Ct.
Rifle, CO 81650
Parcel No. 2177-182-01-005
On May 2, 2024, the design engineer met with the owner of the property mentioned above to
discuss the onsite wastewater treatment system (OWTS) design prepared by the design engineer
on May 31, 2023.
During the site visit referenced above, it was determined that the proposed soil treatment area
(STA) may be reconfigured to 4 rows of 18 Quick4 Standard Infiltrators (or equivalent) rather than
the original design of 3 rows of 24 Quick4 Standard Infiltrators (or equivalent). The STA may also
be rotated approximately 90 degrees clockwise, so the trenches are oriented lengthwise north-
south. This layout better fits the property as well as the owner’s preference. The design engineer
approves this change as shown on the attached Septic Layout Plan dated 05/02/24.
The change described above will not affect the functionality of the OWTS, and all required
setbacks will continue to be met. The final layout of the system will be fully documented by K-
Cronk Engineering in the Asbuilt drawing and Certificate of Inspection.
Seal
Kachayla R. Cronk, P.E.
P.O, Box 140
Mack, CO 81525
970-250-0572