Loading...
HomeMy WebLinkAboutEngineer's Design Revision 05.02.24 Notice Of Revision to OWTS May 2, 2024 Meeker Sand & Gravel Project 110 Gas Ct. Rifle, CO 81650 Parcel No. 2177-182-01-005 On May 2, 2024, the design engineer met with the owner of the property mentioned above to discuss the onsite wastewater treatment system (OWTS) design prepared by the design engineer on May 31, 2023. During the site visit referenced above, it was determined that the proposed soil treatment area (STA) may be reconfigured to 4 rows of 18 Quick4 Standard Infiltrators (or equivalent) rather than the original design of 3 rows of 24 Quick4 Standard Infiltrators (or equivalent). The STA may also be rotated approximately 90 degrees clockwise, so the trenches are oriented lengthwise north- south. This layout better fits the property as well as the owner’s preference. The design engineer approves this change as shown on the attached Septic Layout Plan dated 05/02/24. The change described above will not affect the functionality of the OWTS, and all required setbacks will continue to be met. The final layout of the system will be fully documented by K- Cronk Engineering in the Asbuilt drawing and Certificate of Inspection. Seal Kachayla R. Cronk, P.E. P.O, Box 140 Mack, CO 81525 970-250-0572