HomeMy WebLinkAboutConditions of Permit-Amended 06.07.24AMENDED .o7.2024 --
AMENDED COND ONS OF PERMIT
BLRE-02-24-851 1
GARDNER DYNASTY TRUST
New Single-family dwelling with crawl space &fully finished basement
9171 H*y 82, Carbondale
23931 84001 06
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C,)AND 2018
I NTERNATIONAL EN ERGY CONSERVATION CODE (I.E.C,C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE |TEMS CONTAINED lN THE
ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLYWITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
s) opEN HOLE SOTLS REPORT rS REOUTRED TNCLUDTNG COMPACTTON REPORT FOR STRUCTURAL FILL
AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR, PROVIDE COPY OF
cEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,000 PSF soil bearing.
6) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUTLDTNG TNSPECTOR AT TIME OF
FRAME INSPECTION.
7) AN ELEVATION SURVEY, SEALED BY A COLORADO LICENSED PROFESSIONAL SURVEYOR, IS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD
COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
B) RESIDENCE IS SERVED BY LP PROPANE. SEE PLAN ATTACHMENTS FOR LOCALLY ADOPTED
BUILDING AMENDMENTS.
9) NOTE TO OWNER BUILDER: MUST NOT REMOVE VEGETATION FROM 3s FT RIPARIAN ZONE -
MEASURES FROM HIGH WATER MARK.
10) NO WORK MAy OCCUR tN THE REOUTRED 35-FT MTNTMUM SETBACK FROM THE TP|CAL AND
ORDINARY HIGH WATER MARK PER GARFIELD COUNry LAND USE & DEVELOPMENT CODE, SECTION
7.203. MAPPING & FIELD STAKING OF HIGH WATER MARK SHALL BE PROVIDED BY A LICENSED
SURVEYOR, PROFESSIONAL SURVEYOR OR OTHER OUALIFIED CONSULTANT BEFORE ANY WORK IN
THIS AREA IS ALLOWED.
1 1 ) BLOWER DOOR TEST tS REOUtRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFTELD
COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
12) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINALAPPROVAL/SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH
DEPT.
13) PRESCR|PTIVE PATH USrNG 2018 rECC R402J.2 HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF
THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.