Loading...
HomeMy WebLinkAboutApplicationGarfield County ^ " " CqrRmunity Development Department MAY I il l[# gth street, Suite 401 f.;lr;.:l' ir:.1--,i Gldhwood Springs, CO 81601 CCIM,'..Lii.tllY ,,: rr'- , )l'i*(g7 Ol g45-g2Lz www.garfield-cou ntv.com R!-: TVPE OF CONSTRUCTION Commercial/Mu lti-Fami + BUILDING PERMIT APPLICATION Demolition Manufactured Home or Tiny Home (Single or Multi-Level) Residential (SF, Duplex or Townhome)Reroof Accesso Dwell Unit ADU - MAXIMUM SIZE OF SqUARE FEET INVOLVED PARTIES ,AnS I alPhone: t?h I 6 l7^ f 7s2 O,4Property Owner: Mailing Address: P'a. Brr )aS /"'t ^L \p ln vlz-'t-< Email Address:e us contractor: t4cr y'cl ('.: ls-\S-btrr c,U.tln phone: Mailing Address Email Address: { Architect:Phone: t47o I 7e9^ /85 2 Mailing Address; Email Addressl Engineer:Phone: t dcll Si o - /r*3 Mailing auuress: lo{ Ma}*. <t 1--L"*At.(," . ?tt 29 Email Address: \)a Manufactured Home lnstaller:Phone: Mailing Address Email Address: PROJECT DETAITS e Describe Work: Job Address: Number:Z oIIDU g Owner's Valuation of Work: S lfu ooCI Sq. Ft. of Building: Class of Work:CW 1fu"^,truock {$ FIW NWag I ) Assessor's Sub. rage: [ot Property Size (Sq. Ft. or Acres): # of Floors Addition DetachedGaAttached Height: ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018 IECC and @!q@!. Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of the building to be conditioned inside the envelope (and label or otherwise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Path. Prescriptive: Cross Sections of insulated assemblies including the selected material / R-Value and U-Values to comply with IRC Table R402.1.2. U-Factor Alternative: Provide a ResCheck Report. Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) Manual J Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. . SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigation report or if Structural plans make a specific reference to a soils report, then a- copy of the soils report is required to submit a building permit application.. Design specifications to include roof and deck snow load, wind and seismic design and frost depth.. Foundation plan showing complete footing and foundation dimensions.r Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date.o Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Owner Print:Srq \N'^ 6.,0*ti P*f Sign <^ 9^ 2"1 Garfield CowwtY' BUILD'NG DEPARTMENT Io8 Eighth S/r:eet, Suite 407, Glenwood Springs' Co 81607 Tel: (970) 945-8272 P N EVIE CHE KL T Permit No: B LXF A64/- 8b 86 Building lssues E *gi*eered Fo*r+datior+ Driveway Permit Grade/ TopograPhY 30% Attach Residential Plan Review List $"+belivislon Plat 9{otes Fire Department Review Valuation Determination/ Fees Red Line Plans/ StamPs/ Sticker Attach Conditions Application Signed Energy Cornpliance Pathy'Plan Received Plan Reviewer to Sign APPlication Parcel/ Schedule No. 40# Snowload Letter - Manuf' Homes Soils Report r1/ab:///bb?" Pla n n i ng lToning I ssues Property Line Sethacks 35 ft. Stream Setbacks Flood Plain Buitding Height Zoning Sign-Off Road rmpact Fees < 9OO g'f' hrhtft?ug Grade/ TopcieraPhY a0% Planning lssues Subdivision Plat Descri ption &s urnmarv: *ry 6,baitb/ ra/aa:lin at 9rc4oao.eo '4