Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-0 5-24-87 01 PEDRO PALMA New Primary Residential Dwelling & ADU with attached garage TBD Seneca Dr, Silt Mineota Ridge Est 3'd, Lot 1 - 217914400738 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESIDENTAL CODE (l.R.C.)AND 2018 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERTOR LTGHTTNG TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG INSPECTTON AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR BUTLDTNG INSPECTOR AT TIME OF FRAME INSPECTION, 8) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 9) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINALAPPROVAL/SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. 10) PRESCR|pTtVE PATH USTNG 2018 rECC TABLE 402.1.2 HAS BEEN CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET. $ .s r"t .9.'_ \ .b _ s