Loading...
HomeMy WebLinkAboutEngineer's OWTS Planrcn Kumar & Associates, lnc.' Geotechnical and Materials Engineers and Environmental Scientists 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com An Employcc Owncd compony www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado RECEIVED JUN 2 8 202\ GARFIELD COUt,JTy COMMUNITY DEVELOPMENT ONSITE WASTEWATER TREATMENT SYSTEM DESIGN PROPOSED ACCESSORY DWELLING UNIT (ADU) 411 COUNTY ROAD 237 GARFTELD COUNTY, COLORADO PROJECT NO.24-7-244 JUNE 19,2024 PREPARED FOR: JASON STRAND 411 COUNTY ROAD 237 SILT, COLORADO 81652 wcaclaims@gmail.com TABLE OF CONTENTS INTRODUCTION PROPOSED CONSTRUCTION SITE CONDITIONS SUBSURFACE CONDITIONS OWTS ANALYSIS DESIGN RECOMMENDATIONS ... SOIL TREATMENT AREA OWTS COMPONENTS OWTS OPERATION AND MAINTENANCE.. OWTS HOUSEHOLD OPERATION OWTS MAINTENANCE...... OWTS CONSTRUCTION OBSERVATION ........ LIMITATIONS............ FIGURES FIGURE 1 _ OWTS SITE PLAN FIGURE 2 _ USDA GRADATION TEST RESULTS FIGURE 3 _ SOIL TREATMENT AREA CALCULATIONS FIGURE 4 - SOIL TREATMENT AREA PLAN VIEW FIGURE 5 _ SOIL TREATMENT AREA CROSS SECTION ATTACHMENTS VALLEY PRECAST 1,OOO GALLON, TWO-CHAMBER SEPTIC TANK DETAIL TUF-TITE 4-HOLE DISTRIBUTION BOX 1- 1- 1 1 -2- a -3 - ...- 5 ...- 6 ...- 6 .....- 3 - ....- 6 - ......- 7 - Kumar & Associates, lnc.Project No.24-7-244 INTRODUCTION This report provides the results of an onsite wastewater treatment system (OWTS) design for a proposed accessory dwelling unit (ADU) to be located at 4lI County Road 237, North of Silt, Garfield County, Colorado. The purpose of the report is to provide design details for the OWTS in accordance with the Garfield County Environmental Health Department Onsite Wastewater Treatment System Regulations and the Colorado Department of Public Health and Environmental Regulation#43. The services were performed in accordance with our agreement for professional services to Jason Strand dated April 16, 2024. PROPOSED CONSTRUCTION The existing barn will be remodeled into an ADU located on the site as shown on Figure 1. The existing barn is a steel-framed, one-story structure with slab-on-grade floor. The ADU will have two bedrooms. The OWTS will be designed for two bedrooms. The proposed soil treatment area (STA) for the OWTS will be located to the southwest of the ADU as shown on Figure l. Water service will provided by a shared well on the lot to the south. The route of the water supply line to the ADU has not yet been determined. If proposed construction is different than that described, we should be contacted to re-evaluate our design recommendations. SITE CONDITIONS The site was occupied by an existing residence, the barn and apond at the time of our field exploration, see Figure 1 for locations. The terrain is gently sloping down to the south. The pond is located to the south of the ADU. The nearest well is located on the adjacent property to the south. The area of the proposed STA is fallow field. Vegetation consists of grass and weeds SUBSURFACE CONDITIONS The field exploration for the OWTS was conducted on May 21,2024. Two profile pits (Prof,rle Pits 1 and2) were excavated with an excavator at the approximate locations shown on Figure 1 to evaluate the subsurface conditions at the planned soil treatment area for the OWTS. The pits were logged by a representative of Kumar & Associates. Logs of the profile pits are provided below. Log of Profile Pit 1 Depth USDA Classification 0-%TOPSOL; organic Loam, firm, moist, brown. V2'-6'SANDY CLAY LOAM; strong blocky structure, very stiff; slightly moist, brown. 6'-8',SANDY LOAM; gravelly, moderate blocky structure, medium dense, slightly moist, brown. a a a Disturbed bulk sample obtained from 4 to 5 feet. Bottom of pit @ 8feet. No sroundwater or redoximorPhic feohtre.s observed at time ofoit excavation. Kumar & Associates, lnc.Project No.24-7-244 Depth USDA Classification 0-Y"'TOPSOL; organic Loam, firm, moist, brown. V2'-6'SANDY CLAY LOAM; strong blocky structure, very stiff, slightly moist, brown. 6'-8',SANDY LOAM; gravelly, moderate blocky structure, medium dense, slightly moist, brown. a a Bottom of pit @ 8feet. No groundwater or redoximorphic observed at time of pit excavation. n Log of Profile Pit 2 The soils encountered in profile pits, below about Yzfoot of organic topsoil, consisted of about 5/z feet of Sandy Clay Loam overlying Sandy Loam down to the pit depths of 8 feet. Hydrometer and gradation analyses were performed on a disturbed bulk sample of the soils from Profile Pit 1 from 4 to 5 feet depth with the results provided on Figure 2. The tested sample (minus No.10 size sieve fraction) classifies as Sandy Clay Loam per the USDA system. No free water was encountered in the pits nor indications of seasonal high groundwater were observed at the time of the pit excavations. Based on the subsurface conditions and laboratory testing, the soils at the STA have been classified as Type 3 per State regulations, which equates to a long-term acceptance rate (LTAR) of 0.35 gallons per square foot per day. OWTS ANALYSN Based on the site conditions and profile pit evaluations, the evaluated area should be suitable for a conventional infiltration disposal system. There is adequate elevation difference from the ADU down to the STA for gravity flow of the sewer effluent. The STA will consist of chambers in a trench configuration based in the Sandy Clay Loam soils. The STA will be sized for two bedrooms (4 persons) with an average daily flow of 75 gallons per person, and an LTAR of 0.35 gallons per square foot per day for the natural soils. The effluent will gravity flow from the ADU to the septic tank for primary treatment and then gravity flow to the STA for dispersal and final treatment. The STA will consist of two trenches with Infiltrator Quick 4 Plus Standard chambers. Equal distribution will be provided to the chambers and trenches by a distribution box. The well is far outside of any setbacks to the OWTS. The route of the planned water supply line to the ADU is currently not designed. The required setback to the water line from the septic tank is 10 feet, 5 feet for sewer and effluent lines, and25 feet from the STA. We should be notified for additional recommendations if the water line is within these minimum setbacks. DESIGN RE COMMENDATIONS The design recommendations presented below are based on the proposed construction, the site and subsurface conditions encountered and our experience in the area. A layout of the proposed OWTS components is provided on Figure 1. If conditions encountered during construction are different than those that are described in this report, we should be contacted to re-evaluate our design recommendations. Kumar & Associates, lnc.Project No.24-7-244 -3 - SOIL TREATMENT AREA o The STA will consist of two trenches with25Infiltrator Quick 4 Plus Standard chambers placed in each trench (50 chambers total) in the native soils. Equal distribution will be provided to the trenches by a distribution box. o The STA was sized based on an LTAR of 0.35 gallons per square feet per day. o Each chamber was allowed 12 square feet of area. A30% reduction of the STA size was applied for use of Infiltrator chambers in a trench configuration. The total STA design size is 600 square feet. Soil treatment area calculations are shown on Figure 3. o A minimum of four feet of undisturbed soil between trenches is required. . Trench cut depths should be a maximum of 4 feet deep. o The trenches should be oriented along ground contours to minimize soil cut and cover. o The base and sidewalls of the trench excavations should be scarified prior to the chamber placement. o A minimum of 12 inches and a maximum of 24 inches of cover soil should be placed over the chambers. o Backfill should be graded to deflect surface water away from the STA and should be sloped at3 horizontal to 1 vertical or flatter. A swale to divert surface water flow away from the STA may be needed. o Disturbed soil should be re-vegetated as soon as possible with a native grass mix. No trees, shrubs or other plants with deep roots should be planted on or near the STA as this may damage the system PiPing. o Four-inch diameter inspection ports should be installed vertically into the knockouts provided in the chamber end caps. Install ports at each end of the trench. The inspection port piping should be screwed into the top to the chambers and should not extend down to the ground surface inside the chambers. The inspection ports should extend at least 8 inches above the finished ground surface or be protected in a valve box at finished grade. o The STA must be a minimum of 5 feet from the septic tank. o The STA must be a minimum of 25 feet from any potable water supply lines. o The STA must be a minimum of 20 feet from the ADU. o The STA must be a minimum of 50 feet from the pond' o The STA must be a minimum of 10 feet from piped irrigation lines. o A plan view of the STA is presented on Figure 4 and a cross section of the STA is presented on Figure 5. OWTS COMPONENTS Recommended OWTS components provided below are based on our design details and our experience with the specific component manufacturers. Equivalent components may be feasible but need to be approved by us prior to construction. Septic Tank o A Valley Precast 1,000 gallon, two-chamber septic tank should be used. A detail of the tank is provided as an attachment. o An effluent filter should be installed in the tank outlet tee. Kumar & Associates, lnc.Project No.24-7-244 -4- o The tank must be a minimum of 5 feet from the ADU and the STA. o The tank must be a minimum of 10 feet from any potable water supply lines or irrigation lines. o The tank must be a minimum of 50 feet from the pond. o The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling course. o The tank lids must extend to final surface grade and made to be easily located. o Install the tank with 2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. Sewer Pipe o The sewer line to the septic tank should not be less than the diameter of the building drains and not less than 4 inches in diameter. o The sewer pipe should have a rating of SDR35 or stronger. o Schedule 40 PVC pipe is required beneath any driveway surfaces. o The sewer pipe should be sloped between 2oh to 4Yo to help limit disturbance of solids in the tank and potential sewage bypass of the first chamber of the tank. If a steeper slope is needed, this can be accomplished with vertical step-downs in the sewer line. o A minimum 18 inches of cover soil should be provided over the sewer pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas, and the pipe be insulated on top and sides with 2-inch-thick blue foam insulation board. If adequate soil cover is not possible, we should be contacted for re-evaluation prior to installation. o The sewer pipe should be bedded in compactedt/o-rnchroad base or native soils provided that the native soils contain no angular rocks or rocks larger than2Vz inches in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing effluent to freeze and damage the PiPing. o Install cleanout pipes within 5 feet of the building foundation, where the sewer pipes bend 90 degrees or more and every 100 feet of sewer pipe. . All 90-degree bends should be installed using a 90-degree long-sweep or by using two 45-degree elbows. o The sewer line location shown on Figure I is considered conceptual. We assume that there will be only one sewer line exiting the ADU. It is the responsibility of the owner/ contractors to locate all sewer line exit locations and connections to the septic tank. We should be notified if there are other sewer lines exiting the building. Effluent Transport Piping o The effluent transport pipe should be 4-inch diameter SDR35 piping sloped at a2Yo minimum to flow from the septic tank to the distribution box and from the distribution box to each trench. Piping should extend at least 6 inches into the top knockout provided in the Infiltrator end caps and be screwed in place. Splash plates should be installed Kumar & Associates, lnc,Project No.24-7-244 -5- a beneath the inlet piping to help limit scouring of the infiltrative soil surface in the chambers. The effluent transport pipe should be bedded in compacted3/o-inchroad base or native soils provided that the native soils contain no angular rocks or rocks larger than 2Yz inches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage to the piping. A minimum 18 inches of cover soil should be provided over the effluent transport pipe' Paved areas, patios or other areas without vegetative cover may be more susceptible to frost. We recommend 48 inches of soil cover over the effluent pipe and insulation with at least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible, we should re-evaluate the condition prior to installation. Schedule 40 PVC pipe is required underneath driveway surfaces and should be provided with at least 48 inches of soil cover and be insulated on top and sides with 2-inch-thick rigid foam insulation board. All 90-degree bends should be installed using a 90 degree long-sweep or by using two 45-degree elbows. o Distribution Box o The distribution box will be used to equally divide effluent flow between the trenches. We recommend the Tuf-Tite 4-Hole Distribution Box since it is easily accessible from ground surface for maintenance. A copy of the distribution box detail is provided as an attachment to this rePort. The distribution box outlet pipes should be equipped with Tuf-Tite speed levelers for ease of initial setup and adiustment over time. The distribution box should be a minimum of 18 inches below grade with risers and an access lid at or above grade. The distribution box must be accessible from ground surface for inspection and maintenance per the State guidelines' The effluent line from the septic tank should be directed downward into the distribution box with a 9O-degree elbow inside the box. The distribution box must be installed level on a compacted road base subgrade to ensure equal effluent distribution. If settlement of the distribution box occurs, unequal effluent distribution may take place which could cause hydraulic overload of one of the trenches and potential failure. The distribution box should be monitored periodically, and the speed levelers should be adjusted as necessary for levelling. The ground surface above and around the distribution box should be graded to drain away surface water to prevent standing water near the distribution box which could fteeze or cause settlement. OWTS OPERATION AND MAINTENANCE The OWTS will require periodic inspection and maintenance to function properly. A properly designed, installed and maintained system can greatly increase its lifespan. The level of maintenance will vary depending on the complexity of the system and water use habits of the residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be a a a o o o a Kumar & Associates, lnc,Project No.24-7-244 -6- developed. Depending on the complexity of the system, a contract with an OWTS maintenance provider may be prudent. Below are some basic recommendations for the OWTS O&M. OWTS HOUSEHOLD OPERATION o Use of high efficiency water fixtures is recommended to decrease the hydraulic load on the OWTS sYstem. o Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil absorption system. o Do not irrigate the area on top of or directly upgradient of the STA field as this may cause a hydraulic overload. o Do not dispose of household waste down drains as this may clog or damage OWTS components. Examples of household waste include: dental floss, cotton swabs, coffee grounds, paper towels, feminine products and many other kitchen and bath items. o Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized, kitchen wastewater should be screened thoroughly. Many kitchen solids are not decomposed in the septic tank and may cause increased tank pumping frequency. o Do not dispose of household chemicals, greases, oils, paints, hot tub water or water softener backwash in household drains. A separate drywell, if feasible, may be necessary for hot tub water or water softener backwash disposal. o Limit the use of bleach as this may harm useful bacteria in the septic tank and soil absorption sYstem. . Liquid dishwasher and clothes washer detergent is recommended for households served by an OWTS. Clay substances used as fillers in powder detergents may result in clogging of the soils absorption system. OWTS MAINTENANCE o Inspect the septic tank, distribution box and STA at least annually for problems or signs of failure. o The effluent filter for the tank should be cleaned at least annually by spray washing solids into the first chamber of the septic tank. o The septic tank should be pumped and cleaned every 3 to 5 years depending on use. Longer pumping intervals may increase the amount of solids that reach the STA, which may shorten its life span. o Pumping of the septic tank should take place when the level of the sludge and scum layers combined take up 25 to 33o/o of the capacity of the first chamber of the tank. OWTS CONSTRUCTION OBSERVATION The Garfield County Environmental Health Department requires that the designer of the system provide a record drawing and certification of the OWTS construction (As-Built inspection). We should be provided with at least 4S-hour notice prior to the installer needing the inspections. Prior to issuance of our certification letter, we require observation of all system components prior to backfill. The number of site visits required for the inspection will depend on the installer's construction schedule. Kumar & Associates, lnc.Project No.24-7-244 -7 - LIMITATIONS We have conducted this design in accordance with generally accepted engineering principles and practices in this area atthis time. We make no warranty either expressed or implied. The recommendations provided in this report are based on the site conditions, profile pit evaluations and soil texture analysis, the proposed construction and our experience in the area. Variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design pulposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verifu that the recofilmendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to our design. It is our opinion that the designed location of the OWTS components does not violate any setback requirements of the current Garfield County Regulations. Below is a table of common minimum horizontal setbacks to OWTS components. Refer to the Garfield County Regulations for a complete list of required setbacks. We recommend the OWTS components be surveyed by a Professional Colorado Land Surveyor. Table 1- Common Minimum Horizontal Setbacks from OWTS Components Wells Water Supply Line Occupied Dwelling Lined Ditch Lake, Irrigation Ditch, Stream Dry Ditch or Gulch Septic Tank STA 100'25',20'10'50'25',5' Septic Tank 50'l0'5 l0'50'l0' Buildine Sewer 50'5'0 10'50'l0' Please contact us for any necessary revisions or discussion after review of this report by Garfield County. If you have any questions, or if we may be of further assistance, please let us know. Respectfully Submitted, Kumar M. Mello, Staff Engineer Reviewed David A. Young, SMMlkac (c'A ;t6 Kumar & Associates, lnc.Proiect No.24'7'244 c = moO! o_ 3oam (,Nmo f;b-z.{=m6-or PROFILE PIT 2 T -t PROPOSED TUF-TITE 4-HOLE DISTRIBUTION BOX I PROPOSED SOIL TREATMENT AREA PROPOSED VALLEY PRECAST(srA)CONSISTING OF TWO ROWS oF2 5 INFILTRATOR QUICK PLU ,OOO-GALLON4 STANDARD CHAMBERS (s0 CHAMBERS TOTAL).PROFILE PIT 1 TWO-CHAMBER SEPTIC TANK ao s .ol ,r, o\ Nd $., Bs*.(.v q x D ,;-]- \t $ Crl It \ s N \ s- si nu S\ rr\ o-\e. $'"s sI 50' SET TO POND CLEANOUT h - io oocz--{ no I N (r.l 41 1 COUNTY ROAD 257 o ox a F"o:(d Io- c)o 3 3oa 0 SCALE- FEET ",::", "t;"'^(q %o^ tqr"':" N!,o- to otoo o oo POND 24-7 -244 Kumar & Associates OWTS SITE PLAN Fig. 1 HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS 24 HRS 7 HRS tMtN4i U.S. STANDARD SERIES 415 4t 8 4io J CLEAR SQUARE OPENINGS \/An A/tn 7 1/r"5'6" t 0 10 20 3o 40 5o 60 70 60 90 = 100 90 80 70 60 30 40 30 20 10 o 100 .0s3 DIAMETER OF IN MILLIMETERS CLAY COBBLES .002 mm '02 '05 .1 SAMPLE OF: SANDY CLAY LOAM FROM: PROFILE PIT 1 AT 4 TO 5 FEET .5 I 2mm {20 76 ENTIRE SAMPLE PARTICLE SIZE DISTRIBUTION % COBBLES 0 GRAVEL 6 SAND 53 SILT 19 CLAY 22 PORTION OF SAMPLE PASSING #10 SIEVE PARTICLE SIZE DISTRIBUTION % SAND 56 SILT 20 CLAY 24 TOTAL SAMPLE RETAINED ON f10 SIEVE: 6% PERCENT OF MATERIAL RETAINED ON #10 SIEVE PASSTNG 5/4" SIEVE: 1OO% NOTE: Hydromeler Anolysis wos performed on o bulk sorirple following screening of oll moleriol lorg€r lhon the f10 sleve (2.0 mm) per USDA guidelines. These l6sl r€sulls opply only lo lhe somoles which wer€ lesl€d, The lesll;g report sholl nol be r€produced, 6xc€Dl ln full, wllhout lhs wrlllsn ooorbvol of Kumqr & Associolgs, lnc. Sieve onqlysls l€sllng ls performod ln occordonc6 wlth ASTM D,[22, ASTM C156 ond/or ASTM Dl l40. GRAVELSANDSILT MEDIUM COARSENIEDIUMco.v. co.FINEco.V, FINE FINEFINE GRAIN SIZE(--)SIEVE SIZE % FINER 127.00 5 100 76.00 z 100 58.1 0 1 -1 /2"100 19.05 3/4"100 9.50 3/8"100 4,75 #4 9E 2.00 #10 94 1.00 #18 92 0.50 #55 90 0.25 #60 84 0.1 06 #'140 64 0.055 #270 11 GRAIN SIZE (,.n.) TIME PASSED (min)% FINER 0.037 39 0.019 4 37 0.009 19 30 0.00s 60 27 0.002 435 22 0.001 1 545 14 24-7 -244 Kumar & Associates USDA GRADATION TEST RISULTS Fis. 2 OWTS SOIL TREATMENT AREA CALCULATIONS In accordance with the GarfieH County OWTS Regulatbns and the Cobrado Depaftment of Publh Health and Envlronment's Regulatbn #43, the soil treatment area was calculated as fohuts: CALCULATION OF OWTS DESIGN FIOW: q = (F)(N) WHERE: Q = DESIGN FLOW F = AVEMGE FLOW PER PERSON PER DAY B = NUMBER OF BEDROOMS N = TOTAL NUMBER OF PERSONS; 2 PERSONS PER BEDROOM PROPOSED RESIDENCE: f= $= [\= Q= 75 GALLONS PER DAY 2 BEDROOMS 4 PERSONS 3OO GALLONS PER DAY CALCULATION OF OWTS SOIL TREATMENT AREA: MINIUMUM TREATMENT AREA = Q + LTAR WHERE: Q= LTAR (SOIL TYPE 3) = 3OO GALLONS PER DAY 0.35 GALTONS/FTTDAY MINIMUM SOIL TREATMENT AREA = REDUCTION FACTOR FOR CHAMBERS = MINIMUM SOII TREATMENT AREA WITH REDUCTION = 857.1SQUARE FEET 0.70 600 SQUAREFEET AREA PER INFILTMTOR QUICK 4 STANDARD CHAMBER = TOTALCHAMBERS NEEDED = 12 SQUARE FEET 50 CHAMBERS NUMBER OF TRENCHES = CHAMBERS PERTRENCH = TOTAT NUMBER OF CHAMBERS AS DESIGNED = 2 25 CHAMBERS 50 CHAMBERS TOTAT SOIL TREATMENT AREA =600 SQUAREFEET 24-7 -244 Kumar & Associates SOIL TREATMENT AREA CALCULATIONS Fig. 5 INFILTRATOR QUICK 4 PLUS STANDARD END CAP. 4 INCH DIAMETER PVC OBSERVATION PORTS INSTALLED VERTICALLY INTO THE KNOCKOUTS PROVIDED IN END CAPS. INSTALL PORTS AT EACH END OF EACH TRENCH. REMOVABLE LID TO BE PLACED ON TOP OF PIPE. PIPE MUST STICK UP AT8 INCHES ABOVE 3 2I c FINISHED GRADE OR BE PLACED AT GRADE IN AN ACCESSIBLE VALVE BOX. PIPES SHOULD NOT EXTEND TO SOIL SURFACE AND SHOULD BE SECURED TO CHAMBER WITH SCREWS OR COUPLINGS TO PREVENT SLIDING DOWNWARD. INFILTRATOR QUICK4 PLUS STANDARD CHAMBERS IN 2 TRENCHES. 25 CHAMBERS PER TRENCH (s0 TOTAL). TRANSPORT PIPING SHOULD BE INSERTED AT LEAST 6 INCHES INTO THE UPPER KNOCKOUT IN THE END CAP. INSTALL SPLASH PLATES BENEATH INLET PIPING TO HELP LIMIT SCOURING OF THE INFILTRATIVE SURFACE.TUF-TITE 4-HOLE DISTRIBUTION BOX LINE FLOW 4 INCH DIAMETER NON-PERFORATED SDR55 TRANSPORT PIPE SLOPED AT A 2% ]vllN. DOWN TO TRENCH. TANK 4 INCH DIAMETER NON-PERFORATED SDR35 TRANSPORT PIPE SLOPED AT A 2% MlN. DoWN TO DISTRIBUTION BOX. 10 t,1 SCALE- FEET Notes: 1. Chambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if necessary, 2. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of trench excavations should be scarified prior to chamber installation 3. All piping should have a rating of SDR35 or stronger' 4. Changes to this design should not be made without consultation and approval by Kumar & Associates. S Refer to the Garfield County Onsite Wastewater System Regulations for other applicable specifications, 24-7 -244 Kumar & Associates SOIL TREATMENT AREA PLAN VIEW Fig. 4 EXCAVATE 36'' WIDE TRENCH 12" MtN./24" MAX. COVER SOIL GRADED TO DEFLECT INFILTRATOR QUICK 4 PLUS STANDARD CHAMBER INSTALLED LEVEL URFACE WATER EX ISTING GROUND SURFACE APPROX. Notes: l. C-hambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if necessary. 2. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of trench excavations should be scarified prior to chamber installation. 3. Changes to this design should not be made without consultation and approval by Kumar & Associates. otr tr SCALE- FEET NDISTURBE SOIL BETWEEN NATIVE SOIL SCARIFY GROUND SURFACE PRIOR TO CHAMBER PLACEMENT 24-7 -244 Kumar & Associates SOIL TREATMENT AREA CROSS-SICTION Fig. 5 {OOO Gallon Top Seam -2CPItom # {oooT-zcP ..: :.' -. 'J-.i-''.;-'...-d--i' --It Top View b Gnade Rubber Sealant Section -l 11 DESIGN NOTESo Design per performonce test per ASlil C1227 o Top surfoce oreo 46.25 ft2 r f'c @ 2E doys; concrete = 6,000 PSI Min. lnstollotion:r Tonk to be set on 5" min. sond bed or peo grovelr Tonk to be bockfllled uniformlY on oll sides in lifts less thon 24' ond mechonicolly compoctedo Excovoted moteriol moy be used for bockfill, provided lorge stones ore removedr Excovotion should be dewotered ond tonk filled with woter prior to being put in service for instollotion with woter toble less thon 2' below grode r Meets C1644-06 for resilient connectorso lnlet ond Outlet identified obove pipe o Delivered complete with internol piping r 4' Moxlmum bury depth Digging Specs 11' Long x 7' Wide 56" below inlet lnvert lnlet ioutlet i s6" i 5J" I t: Chal j] TA{K ilni i .. .. _..- | .- Fleldble Dimensions Net Copocity 6i ,"1 l View 1 60" Height let Side 687 gol Net Weight Tonk 9380 lbs Totol 12000 lbs I I l l ALLOWABLE BURY (Bosed on Woter Toble) WATER TABLE ALLOWAELE FARTH FII I 0'-0'2'- O' 1'- 0"3'-0' 2'-O"3'- o" 3'-0"+'-o' DRY 4'- o' 1 1 n Phone: 719€956764 Fax 71$895€7? Webclb: www.vallelprccastom Emall : fiondesk@val leyprccastomBuena Vbtar Colorado PRTCASI'rnc. Tough Problem Providing a simple, reliable, and permanent means for dividing septic tank effluent flow, TUF-TITE Solution A skong, stable, permanent, non-corrosive Tuf-Tite Distribution Box, with a Tuf-Tite Speed Leveler in each outlet. I lnjection molded HDPE I Non-corrosive I Simple to install I Easy to level ln a septic environment, no other material can match High Density Polyethylene in delivering a lifetime of trouble{ree service, Tuf-Tite Diskibution Boxes are injection molded, using only premium HDPE which contains no fillers or foam. Snap-in pipe seals They're patented. Simply insert your PVC pipe and push it through the flexible, polyethylene Tuf-Tite seal. Pipes fit watertight. lnstallation couldn't be easier. They're permanent Unlike cement-based pipe grout, Tuf-Tite seals will not crack or corrode in septic conditions. They stay pliable and wateftight permanently. t ffi rE- .O -TUF.TITE'4-Hole Distribution Box 4HD2 I Patented snap-in pipe seals simplify installation. INSTALLATION IS JUST THIS SIMPLE 1. Position the Distribution Box on level virgin soil. Do not place box on a concrete slab, 2. lnstall the inlet pipe and outlet pipes. Be sure the bottoms of all pipes rest on virgin soil. 3, Level the Distribution Box and all pipes as needed, 4, Backfill the pipes to within two feet of ihe Distribution Box. Recheck the level of the box, then backfill up to the top lid ridge. 5. lnstall and adjust Tuf-Tite Speed Levelers. 6. Place lid on the Distribution Box and finish backfilling. 2" Drop s-35 t\s-40 P-10 Choice of Fittings S-35 Pipe Seal, for: I Sewer and Drain I SDR 35 T ASTM 3034 I Thin Wall I 1500 Lb. Crush S-40 Pipe Seal, for: I Schedule 40 I 4" Corrugated P-10 Plug, for unused holes A Model 81 Riser. For series lo" st Box.StackableHDPE * Risers extend to grade in 6"' increments, Accept 1 1" x 1 1" lids and grates. lnterlocking Lid. Heavy-duty HDPE Lid is ribbed for added strength and rigidity. Slotted sides interlock on the Distribution Box.to assure a tight fit. The 4HD2 Distribution Box comes complete with a Regular Lid or an lnspection Port Lid, and 5 snap-in fittings of your choice. Tuf-Tite Speed LevelersTM Control the flow of effluent from the Distribution Box. Simply inserl a Speed Leveler into each outlet pipe. Rotate each Speed Leveler so the flow is distributed as desired. Available for 3" or 4" PVC pipe. I lniection molded. Exceptionally strong. I HDPE is non- corrosive in a septic environment. 151/2" 11" 't Choice of Lids Regular Lid. Molded of rugged HDPE. lnspection Port Lid. For easy access and inspection. Models available to accept eiiher 4" or 6" extension pipes. :O.TUF.TITE'I; I Drainage and Septic Products i Tuf-Tite@ Corporation \''. '1200 Flex Court Lake Zurich, lllinois 60047 ] -.". betterseptic'- systems t A full line of' innovationsfor : . r:i," @1999 Tuf Tite@ Corporation Fo(m 4ND2 3. Printed in USA