HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-05 -24-8693
CITADEL GLENWOOD, LLC
SINGLE STORY FLEX OFFICE BUILDING W/B TENANT SPACES
TBD CENTER DRIVE
GLENWOOD SPRINGS
1 SEPARATE PERMITS ARE REQUIRED FOR TENANT FINISH CONSTRUCTION.
2 THE APPROVED PLANS ARE TO BE ON-SITE FOR INSPECTIONS.
3 SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
4 A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
PLUMBING
MITS
5 UNDERGROUND UTILIry LOCATES IS THE RESPONSIBILITY OF THE OWNER OR
CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE.
6 ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A
LICENSED BACKFLOW SPECIAL]ST AFTER INSTALLATION AND PRIOR TO ISSUANCE
OF THE CERTIFICATE OF OCCUPANCY.
7 SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE
SEE THE COUNTY'S WEBSITE FOR THE APPLICATION.
8 ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
tNSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-
3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE
WRITTEN DOCUMENTATION OF THE INSPECTIONS.
9 THE ELECTRICAL CODE REQUIRES A SEPARATE ELECTRICAL PERMIT FOR LOW
VOLTAGE FIRE ALARMS THAT HAS AN ALARM PANEL AND SEND A NOTIFICATION
TO THE FIRE DISTRICT WHEN UNDER ALARM. A ROUGH-IN INSPECTION WITH THE
STATE ELECTRTCAL |NSPECTOR rS REQUTRED (303) 869-3458. PLEASE HAVE THE
INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WR]TTEN DOCUMENTATION
OF THE INSPECTION.
1O THE FIRE SPRINKLER AND ALARM ARE REQUIRED TO BE INSPECTED AND
APPROVED BY THE LOCAL FIRE PROTECTION DISTRICT. PLEASE PROVIDE SHOP
11 DRAWINGS TO THE FIRE DISTRICT FOR REVIEWAND SCHEDULE THE
INSPECTIONS ACCORDINGLY. PLEASE HAVE THE FIRE MARSHAL SIGN THE
INSPECTION CARD WHEN THE ROUGH INSPECTION IS APPROVED AND WHEN THE
FINAL INSPECTION IS APPROVED.
12 ANY WATER SUPPLY THAT FEEDS A FIRE SUPPRESSION SYSTEM IS TO BE
INSPECTED BY THE FIRE MARSHAL FOR THAT FIRE DISTRICT PRIOR TO
BACKFILLING.
13 PLEASE PROVIDE SPECIAL lNSPECTIONS REPORTS TO THE BUILDING
DEPARTMENT AS SPECIFIED WITHIN THE GENERAL NOTES OF THE STRUCTURAL
DRAWINGS.
14 COMBUSTIBLE MATERIAL IS LIMITED IN TYPE IAND TYPE II CONSTRUCTION. SEE
IBC 603 FOR ALLOWED COMBUSTIBLE MATERIALS.
15 ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED
16 ANY MEMBRANE AND THROUGH PENETRATIONS OF THE FIRE RESISTIVE
CONSTRUCTION WLL BE REQUIRED TO BE FIRE-STOPPED WITH LISTED FIRE
STOPPING ASSEMBLIES. THE CONTRACTOR IS TO PROVIDE A CUT SHEET FOR THE
ASSEMBLIES AT THE FRAMING INSPECTION. (lBC 713)
17 A KNOX BOX IS REQUIRED TO BE MOUNTED ADJACENT TO THE FRONT DOOR.
PLEASE CONTACT THE LOCAL FIRE DISTRICT FOR EXACT LOCATION.
18 IF THE FIRE SPRINKLER SYSTEM REQUIRES A FIRE PUMP. THEN THE UTILITY
ROOM THAT HOUSES THE PUMP WLL BE REQUIRED TO BE ONE-HOUR
CoNSTRUCTION. (lBC TABLE 508.2.5)
19 ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP,
TNCLUD|NG POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6)
20 AN AIR LEAKAGE TEST IS REQUIRED PRIOR TO PERFORMING THE FINAL BUILDING
TNSPECTTON. (rECC C402.5)
21 NATURAL GAS IS 2PSI SYSTEM, REGULATORS ARE REQUIRED AT EACH
APPLIANCE.
22 THE FLUSH HANDLES FOR THE WATER CLOSETS ARE TO BE ON THE ACCESSIBLE
SIDE OF THE FIXTURE. FOUR OF THE RESTROOMS WILL REQUIRE RIGHT HAND
FLUSH MODELS.
23 DOORS WITH DOUBLE KEYED DEAD BOLTS TO HAVE A SIGN POSTED: .THIS DOOR
TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED'
24 THE ENTIRE FOUNDATION PERIMETER IS TO BE INSULATED TO AN R-10 SLAB
EDGE INSULATION. RED-LINED ON A4.1.