Loading...
HomeMy WebLinkAboutEngineer Structural Changes ReportSW GENERAL NOTES, LEGEND & SHEET INDEX SHEAR WALL DETAILS & SCHEDULE EXISTING FOUNDATION PLAN EXISTING ROOF FRAMING PLAN PROPOSED FOUNDATION PLAN PROPOSED ROOF FRAMING PLAN FOUNDATION DETAILS FRAMING DETAILS FRAMING DETAILS S1.1 S1.2 S2.1 S2.2 S2.3 S3.1 S2.4 S4.1 S4.2 P.A.F.POWDER ACTUATED FASTENER STEEL WIDE FLANGE COLUMN MOMENT CONNECTION STEEL PIPE COLUMN EDGE OF PLYWOOD SHEATHING BEAM FRAMING MEMBER WOOD FRAME BEARING WALL BELOW OVERFRAME AREA FLOOR ELEVATION TRANSITION ( ) T.O.S. TOP OF STEEL ELEV TOP OF SLAB ELEVATION TOP OF TIMBER (WALL PLATES OR BEAM NAILER)[ ] TUBE STEEL COLUMN - HSS 4X4X1/4 U.N.O. STEEL BUCKET FOR TIMBER BEAM HANGER FOR TIMBER MEMBER TOP OF FOOTING ELEVATIONT.O.F. TOP OF WALL ELEVATIONT.O.W. TOP OF PLYWOOD ELEVATIONT.O. PLY. SHEAR PANELING BELOW 2X6 @ 16 EXT / 2X4 @ 16 INT. U.N.O. UP(U) DOWN(D) THROUGH(T) (E)EXISTING (N)NEW U.N.O.UNLESS NOTED OTHERWISE WOOD FRAME BEARING WALL ABOVE 2X6 @ 16 EXT / 2X4 @ 16 INT. U.N.O. UNDERFRAME AREA TOP OF WALL STEP UP C.J.CONTROL JOINT CRIPPLE POST WITHIN FRAMING LEVEL (3) - 2x6 U.N.O. V.I.F.VERIFY IN FIELD ADHESIVEADH. FACE OF STUDF.O.S. ABOVEABV. CLEARCLR. STEEL FRAMING MEMBER STEEL TO STEEL SHEAR CONNECTION BOTTOM OF GRADE BEAM STEP UP BUILT-UP POST DOWN. WHERE SHOWN ISOLATED USE (3) 2X6 MIN U.N.O. MULTIPLE STUD PACK DOWN. USE (3) 2X6 MIN U.N.O. WHERE SHOWN AT JAMBS, USE DBL 2X6 KING W/ SINGLE 2X6 TRIMMER U.N.O. BUIL T - U P MULTIPLE STUD PACK OR BUILT-UP POST UP AND DOWN (SEE ABOVE) - PACK OUT WITHIN FLOOR PLATE REINFORCINGREINF. FOOTINGFTG. BOTTOMBOT. HORIZONTALHORIZ. VERTICALVERT. CONTINUOUSCONT. AND SHEAR WALL DESIGNATION - SEE SCHEDULE DO.DITTO (Repeat above line or adjacent line) STD.STANDARD FOOTING STEP DOWN PLY.PLYWOOD SHEAR PANELING ABOVE SHTG.SHEATHING BUILT-UP POST OR MULTIPLE STUD PACK UP (SEE ABOVE) - PACK OUT WITHIN FLOOR PLATE FRAMING DETAILSS4.3 TIMBER PRODUCTS 1.All studs for walls up to 12' height shall be DF or HF Grade No. 2 or better. Studs for walls up to 18' high shall be Timberstrand 1.3E or Timberstrand 1.5E where 7-1/4" depth is required. Exterior studs shall be 2x6 @ 16 maximum spacing. Interior studs shall be 2x4 @ 16 maximum spacing. Plates shall be DF or HF No. 1. Doubled top plates shall be lapped a minimum of 6 feet and the lap face nailed W/ (12) 16d or spliced W/ MSTA36 or CS14 straps U.N.O. 2.Laminated Veneer Lumber (LVL) shall be Microllam 1.9E with flexural stress Fb = 2,600 psi or approved equal. When multiple LVL's are called out, use typical nailing and bolting as follows unless noted otherwise: 2 LVL's use 2 rows of 16d sinkers @ 12" O.C.; 3 LVL's use 3 rows of 16d sinkers @ 12" O.C.; 4 LVL's use ½" Dia through bolts 2 rows @ 24" O.C. staggered. 3.Laminated Strand Lumber (LSL) shall be Timberstrand 1.55E with flexural stress Fb=2,325 psi or approved equal. 4.Parallel Strand Lumber (PSL) shall be Parallam 2.0E with flexural stress Fb=2,900 psi or approved equal. PSL beams shall be provided solid width to dimension indicated on drawings. 5.Plywood and Oriented Strand Board. Roof sheathing shall be 19/32" 40/20 rated nailed w/ 10d (x 2 1/4) at 6" O.C. at all framing with all edges supported by framing, clips or blocking and shall be oriented perpendicular to rafters U.N.O. Typical shear wall paneling shall be 7/16" Sheathing grade structural use panels oriented vertically or horizontally and nailed with 8d @ 4-12, all edges blocked (flat or vertical blocking OK) U.N.O. 6.At shear wall bottom plate anchor bolts, plate washers shall be provided. Plate washers shall be a minimum of 1/4" thick x 3" square with diagonally slotted hole up to 1 3/4" in length OK. Plate washer must be installed so that plate edge is within 1/2" of the shear paneling. Simpson BP series plates may be used. 7.Exterior headers shall be (2) 9 1/2" LVL W/ insulated core or inner layer U.N.O. and interior headers shall be (2) 2x10 U.N.O. Headers shall bear on single trimmer and double king stud U.N.O. Headers shall be end nailed through first king stud with 16d @ 2" O.C. at each lamination. Double King Studs shall be face nailed to each other W/ (2) rows 16d @ 8" O.C. Trimmers shall be face nailed into king studs W/ (2) rows 16d @ 12" O.C. EA ply. 8.Exposed timbers shall be DF No. 1 or better and appropriately treated. 9.Rafters and all built-up floor/roof sawn lumber members shall be DF or HF No. 1. 10.Studs of gable end walls may break at lateral supports such as ceiling lids provided temporary bracing is provided during construction. Otherwise, studs shall be continuous bottom plate to raked top plates. 11.Provide blocking within roof systems in conformance with IBC requirements. 12.Lag bolts shall be lead drilled for threads for NDS standards and clearance drilled for unthreaded shank portion. 13.Provide adequate venting at attics, and within rafters (Re: IRC and architectural details). 14.Unless noted otherwise, minimum nailing shall be in accordance with IBC Table 2304.9.1 - Fastening Schedule. 15.Steel connectors shall be manufactured by Simpson Company or approved equal. Unless noted otherwise, hangers to join rafters, joists or beams at flush conditions shall be U or HU designation of the full dimension of the framing member. 16.Isolated beam-to-post connections shall be made with Simpson CCQ or CC column caps unless detailed otherwise. Beams bearing on stud packs or posts within wall framing may bear directly on the wall top plates. 17.Isolated post base connections shall be made with Simpson ABW series post bases unless detailed otherwise. Posts or stud packs within wall framing may bear directly on the wall bottom plate. 18.The plies of multiple 2x stud packs shall be face nailed with 2 rows 16d nails @ 12" O.C. at each ply. 19.The plies of built-up 2x columns shall be attached together as follows: ·3 ply columns shall be nailed together with 2 rows of 16d nails @ 12" o.c. staggered each face( 6" total vertical spacing each face) starting 1" from the edge of the column on both faces of the column and staggered ·4 ply columns shall be screwed with 2 rows of SDS 1/4x6 @ 16" staggered each face (8" vertical spacing each face) starting 1 1/2" from edge of column on both faces of the column and staggered ·5 ply and 6 ply columns shall be through bolted with (2) rows 1/2" bolts at 8" o.c. (4" total vertical spacing) starting 1 1/2" from edge of column. ·Alternatively, a solid LSL or PSL post of equivalent cross sectional area to the built-up post may be provided. FOUNDATIONS & CONCRETE 1.Foundations have been designed using the values stated under the "General" section opposite. A Geotechnical Engineer shall be consulted by the Owner or authorized Agent to witness the excavated conditions or conduct testing prior to construction in order to verify the anticipated values and prepare updated recommendations. The Contractor shall notify a representative of the Geotechnical Engineer upon initial excavation and prior to setting forms in order to field witness the excavated conditions. If findings differ from the originally anticipated conditions and/or design modifications are required, the Engineer shall be promptly notified in order that any revisions may be made prior to proceeding with construction. 2.Any verification of existing conditions required on the drawings is to be performed at the start of construction. The Engineer shall be notified of confirmation of the required verification items or discrepancies therein in a timely fashion in order that the modifications may be made appropriately. 3.The main floor slab-on-grade is non-structural and supports non-load bearing partitions which are necessarily attached to load bearing partitions and posts where these elements intersect. Over the life of the structure, the slab-on-grade will move slightly relative to the load bearing foundation system. It is anticipated that there will be minor cracks in finishes to maintain over the life of the structure. If this is not acceptable to the Owner, the Engineer should be contacted to design a structural floor over a crawl space so that the possibility of finish cracks is reduced. 4.All bottom of footing elevations shall be a minimum of 36" below grade or local frost cover requirements if greater. Footing elevations referenced herein are for initial design based on anticipated conditions; final elevations to be determined by field conditions and Geotechnical Engineer determinations. If any foundations are to be constructed at elevations lower than indicated on these drawings, notify the structural engineer to perform any necessary re-design prior to placement of forms or reinforcement. 5.Backfill shall be compacted to a minimum of 95% standard proctor density against the sides of footings and in structural or paved areas. Backfill shall be compacted to a minimum of 90% standard proctor density in landscaped areas. 6.Prior to placement of structural reinforcement, the bottom of excavation shall be viewed by the Geotechnical Engineer to certify adequacy of subgrade for placement of concrete. 7.All footings shall be placed on firm, undisturbed natural soil or properly compacted and tested backfill with prior approval of the Engineer. Contractor shall protect excavations and direct site drainage to avoid deterioration of substrates prior to concrete placement. 8.Concrete aggregate shall conform to the requirements of ASTM C-33. Maximum fly ash content in cementitious material shall be 20%. Maximum slump at the truck discharge point shall be 6". Air content shall be in accordance with local industry standard practice. Additional concrete properties shall be as follows: ·Footings compressive strength (F'c) at 28 days 3,000 psi, water cement ratio (W/C) 0.55 max ·Foundation walls and pedestals F'c 4,000 psi, W/C 0.50 max ·Interior slabs on grade F'c 4,500 psi, W/C 0.45 max ·Exterior slabs (site flatwork) F'c 4,500 psi (CDOT Class D) 10.Non-Shrink grout shall be Rapid Set, Masterflow # 928, or equal meeting ASTM C-1107 with prior approval of the engineer. 11.Adhesive anchors shall be Simpson AT-XP or Hilti HY 200. These shall be of the depth indicated and shall be installed in accordance with the manufacturer specifications. Special Inspection shall be provided unless noted otherwise. 12.Expansion Anchors shall be Hilti Kwik Bolt KB-TZ or Simpson Strong Bolt 2. These shall be of the depth indicated and shall be installed in accordance with the manufacturer specifications. Special Inspection shall be provided unless noted otherwise. 13.Reinforcing steel shall be high strength deformed bars in compliance with ASTM A-615. Yield strength (Fy) shall be 60 ksi. Welded wire reinforcement shall conform to ASTM A-185 and shall be lapped a minimum of one full mesh at ends and sides and tied together. 14.Steel shall be detailed and installed in accordance with the latest editions of ACI 318 and the ACI Detailing Manual. 15.All bars and embedded items must be secure prior to placement of concrete; placement of any items during the pour is not permitted without prior approval of the Engineer. 16.Unless noted otherwise, clear distance to reinforcement for placement against earth shall be 3" and clear distance to reinforcement for placement against forms shall be 2" for bars #6 and greater and 1-1/2" for bars #5 and smaller. 17.Splices in reinforcement shall not be made unless otherwise detailed herein or previously approved on the fabrication drawings. Unless noted otherwise or prohibited, lap length of reinforcement steel shall be 40 db (bar diameters). Continuous reinforcement in beams and walls shall be spliced at midspan for top bars and over supports for bottom bars. 18.Provide a minimum of 2-#5 bars at all jambs, heads, and sills of openings as well as all top and bottom of walls, top of wall steps, top of grade beam stems, bottom of wall steps and bottom of grade beam steps. 19.Wall concrete must be allowed to cure for a minimum of 7 days prior to backfill unless high early additives or other measures, such as partial backfill to facilitate other portions of the work, are specifically approved by the Engineer in advance. 20.Control joints shall be spaced at a maximum of 15' on slabs. Cold joints or construction joints shall be as detailed herein or otherwise pre-approved by the Engineer. Slabs on grade may be poured continuously and sawcut within 12 hours at minimum 15' intervals 1/8" x 1" deep. Reinforce slabs on grade with welded plain wire mesh 6x6-W2.1xW2.1 ASTM A-1064 (Fy=65 ksi) U.N.O. on plan and pour over a 4 inch gravel drainage course U.N.O. on plan. 21.All exposed concrete edges shall have a minimum of 3/4" chamfer or 1/2" tooled round unless noted otherwise. 22.Reference Architectural drawings for non-structural concrete. 23.Care should be exercised in backfill. Heavy equipment should not be used in proximity of retaining walls or stem walls. When backfilling stem walls that have soil on both sides, backfill should be brought up evenly to avoid loading the walls in retention. 24.Reference Architectural and Civil drawings for waterproofing and drainage provisions. All walls are designed for backfill free from groundwater pressure and all footing subgrades shall be protected from excessive wetting - a reliable perimeter drain with adequate slope and suitable discharge must be installed per a Geotechnical Engineer's recommendations. 25.At sawcut edges or cold joints, unless specifically detailed otherwise, apply bonding agent. Use Dayton Superior PVA Bonding Agent J41 or equivalent with prior approval. GENERAL NOTES LEGEND AND SHEET INDEX AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S1.1 These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG GENERAL 1.DESIGN CRITERIA: a.Code: 2015 IRC & IBC where required b.ASCE 7 Building Occupancy Risk Category II c.Design Roof Snow Load Pf = 35psf (Median of Garfield County 40 psf requirement and 25 psf recommendation by 2016 SEAC) d.Seismic Design Category "B", Site Class "D", Basic Seismic Force Resisting System per ASCE 7 Table 12.2-1 is type A-15; Ie = 1.0; Ss = 0.275g, S1 = 0.075g, Sds = 0.289g, Sd1 = 0.121g, R = 6.5, Cs = 0.044, V total building = approximately 7k, V addition = approximately 1.0k (including 20% roof snow load). Designed by equivalent lateral force procedure (Section 12.8). e.Wind Ultimate Design Speed (3-second gust) Vult = 115 mph (Vasd = 90 mph), Exposure B, GCpi = 0.18 f.Allowable soil bearing 1,500 psf 2.Work shall be performed in accordance with regulations of all agencies having jurisdiction, including, but not limited to: Federal, State, County, and OSHA standards. 3.Dimensional information provided is only for general reference for interpretation of the structural design. Dimensional information is not intended to be relied upon for construction or fabrication. The Contractor shall independently arrive at all horizontal and vertical dimensioning, coordinate all dimensions with those provided among these documents and with the Architectural, verify all field conditions and site grades, and communicate any significant discrepancies to the Engineer. Any discrepancies encountered that may affect the work shall be communicated to the Engineer at the earliest prior to proceeding with any work that may be affected. 4.The Contractor is responsible for all bracing and shoring for vertical/wind/seismic/soil retention loads, shoring and protection of adjacent property, temporary construction, and means that may be required to carry out the work safely and appropriately. Field observations by the Engineer shall not encompass these considerations. 5.Shop drawings shall be reviewed in detail for quality and conformance to the construction documents by the General Contractor prior to submittal to the Engineer. Any deviations or requested substitutions from the construction documents must be clearly noted and clouded in the submittal. Drawings with obvious deficiencies or unidentified deviations from the construction documents will be returned to the General Contractor for proper review and re-submittal prior to the Engineer's review. Allow two weeks turnaround time for the Engineer's review of shop drawings. Shop drawings shall be submitted, at a minimum, for the following: ·Concrete Mix Design 6.Where discrepancies may be encountered in the construction documents, the more stringent requirement shall govern unless otherwise clarified by the Engineer. 7.Special lnspections are not required due to work of minor nature or as warranted by conditions in the jursdiction per IBC Section 1704.2 pending approval from the Building Official. 8.At a minimum of five working days prior to frame inspection, notify the engineer for observation of all work in place. Confirmation by the engineer in writing shall be obtained prior to applying any architectural covering over structural items and prior to building department sign off on framing. 9.Engineer's acceptance must be secured in advance for all structural deviations or substitutions. 10.These documents are intended to complement the Architectural documents and shall not be used independently thereof. 11.These documents are intended for the exclusive use of this project. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil, Inc. must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. MASONRY 1.Masonry block units shall conform to ASTM C-90, Grade N, Type I. 2.Masonry shall develop a minimum prism compressive strength of f'm = 1500 psi at 28 days. 3.Mortar for reinforced masonry walls shall conform to ASTM C-270 Type S. 4.Grout for bond beams and vertically reinforced cells shall be made with stone aggregate and shall develop a minimum compressive strength of 3,000 psi at 28 days. 5.Horizontal wall reinforcing shall be as noted in the drawings but in no case less than Standard Dur-O-Wal joint reinforcement at 16" O.C. 6.Vertical wall reinforcement shall be as noted on the drawings but in no case less than #5 bars at 48" O.C. for 8" walls. Vertical bars shall extend the full height of the wall. Reinforcing bars shall conform to ASTM A-615, grade 60. Laps shall be a minimum of 48 bar diameters U.N.O. All cells containing vertical reinforcement shall be fully grouted. Care should be taken to prevent excessive mortar in the grout space. Provide cleanouts at each lift where grout pours exceed 5 feet. Grout pours may be a maximum of 18 feet high with individual lifts not exceeding 6 feet each and mechanically consolidated by means of a vibrator. Grout pours should be stopped 1-1/2" below the top of the masonry except that where bond beams occur this may be reduced to 1/2". 7.Bond beams shall be provided with a minimum of (2) #5's continuous at the parapet or top of wall, roof bearing elevations and floor bearing elevations. Bond beams should be lapped 48" where stepped. 8.Lintel, jamb,and sill reinforcement for any opening exceeding 16" in width or height shall consist of (2) #5's projecting 24" beyond the edge of the opening. At wall ends and corners reinforcement shall consist of (2) #5's vertical unless noted otherwise. 9.Vertical reinforcement at wall ends and corners shall consist of (2) #5's unless noted otherwise. SCALE: = 1'-0" SHEAR WALL BASE CONNECTION @ FOUNDATION STEM WALL 1 S1.21" SCALE: = 1'-0" HOLDOWN DETAIL @ FOUNDATION STEM WALL 2 S1.21" SCALE: = 1'-0" TYPICAL SHEAR WALL CORNERS 3 S1.21" Paneling & framing per schedule Shear wall panel edge nailing per schedule Anchor bolts per schedule Foundation wall per plan Panel edge nailing per schedule Double end studs to be faced nailed w/ (4)-16d per foot min. Holdown per schedule may be installed tight to plate or raised if anchor rod is extended Trim studs @ openings where occur Shear wall end post Typical (2)-2x6 min. full height HD embed per schedule typical post set allthread into adhesive or embedded anchor Simpson SSTB or SB series for higher tension applications Holdown or strap where required Single end stud to be faced nailed to double end stud w/ (4)-16d per foot min. Adjacent wall not specified as shear wall or specified as shear wall Holdown or strap where required Shear wall & paneling per schedule Face nail end stud to shear wall end post w/ (4)-16d per foot min. Adjacent wall not specified as shear wall or specified as shear wall Shear wall end post TYPICAL CORNER ALTERNATIVE CORNER Plate 1/4"x3" w/ standard 1/16" oversized hole (Shear Walls only) Shear wall & paneling per schedule Holdown where required 16d @ 6" O.C. (Full height stud) Facenail w/ (4)-16d per foot 16d @ 6" O.C. TEE CORNER Foundation mud sill & floor sheathing where occurs Foundation stem wall Interior shear paneling where occurs 16d @ 4" O.C. where interior shear paneling occurs Shear wall & paneling per schedule Interior shear paneling where occurs 16d @ 4" O.C. where interior shear paneling occurs 1-1D A-BC (18'-5") King/Trimmer per plan both ends 8d @ 4-12 Block all Edges 7/16 OSB Sheathing Per Plan N/A Rim or Sill to Top Plate Below N/A HTT4#10x1 1/2" SD Holdown @ Both ends (2) rows 1/2" Anchor bolts (ABs) or 1/2" threaded rods set into adhesive @ 32" O.C. Provide 7" min embed @ 2x4 sill, & 4" min embed @ 2x6 sill RE: 4/S3.1. SHEAR WALL LABELING CONVENTION: A- Refers to floor framing level supporting shear wall (1,2,Main, etc.) B- Refers to closest grid parallel to wall C- Refers to closest grid line perpendicular to wall (X'-Y) - Refers to minimum length of shear paneling 1 and 2/S1.2, 4/S3.1 Plate washers required Bottom Plate to Rim/Beam/Sill NOTE: Details this sheet are intended to represent general shear transfer and anchorage concepts pertaining to shear walls. Refer to framing details for balance of information and specific conditions. NOTES: 1.Unless noted otherwise, nail sizes are "Common" designation - 8d nails are 0.131" Ø x 2 1/2", 10d nails are 0.148" Ø x 3 1/4" (2 1/4" OK for wall or floor sheathing), and 16d nails are 0.162" Ø x 3 1/2". 2.10d nails may be substituted for 8d nails except where spacing is 3" O.C. or less 3.All nails through shear paneling and insulated shear paneling must be of sufficient length to penetrate the wall frame studs and blocking 1 1/2" MIN. 4.Shear panel nailing convention example: 4-12 refers to 4" O.C. at panel edges and 12" O.C. at intermediate supports 5.Face nail each ply of shear wall end posts W/ (6) 10d per foot full height of double studs U.N.O. 6.Shear paneling may be run vertically or horizontally U.N.O. Vertically oriented panels may be used to eliminate intermediate blocking if all edges bear on studs or plates. 7.At bottom plate or sill connections where anchor bolts are required, these bolts are in addition to any embeds for holdown anchorage. The minimum number of bolts at sill or bottom plate shall be (2) located between any embeds required for holdown connections. 8.At shear wall bottom plate anchor bolts, plate washers shall be provided U.N.O. Plate washers shall be a minimum of 1/4" thick x 3" square with diagonally slotted hole up to 1 3/4" in length OK. These may be Simpson BP series. Plate washer must be installed so that plate edge is within 1/2" of the shear paneling. 9.Where 10d nail spacing is 3" O.C. or less at conditions noted with " * ", use double studs at panel joints (except plates). Face nail double stud W/ (6) 16d per foot full height of studs 10.Shear wall end or jamb straps for anchorage/ties to walls/beams below shall be installed over the shear paneling Mark Paneling Nailing Frame Sill to concrete HD/Ties @ Ends/Jambs End post HD Embeds Details/Comments 5/8" Rod into adhesive @ Both ends w/ 12" Min Embed 1-1B (4'-5") King/Trimmer @ South, (2) 2X6 MIN @ North DODO 2x6 @ 16 N/A N/A HTT4#10x1 1/2" SD Holdown @ South end only 1/2" ABs @ 48"O.C. 1, 2 and 3/S1.2 Plate washers required 5/8" Rod into adhesive 12" Min Embed @ South end only 1-B (4'-5") (2) 2X6 MINDODODON/A N/A NONEDO 1 and 3/S1.2 Plate washers required NONE 1-2F (13'-0") Post per plan @ North, (2) 2X6 MIN @ South 8d @ 3-12 Block all Edges DO DO N/A N/A (N) 1/2" threaded rods set into adhesive @ 32" O.C. Provide 7"min Embed. 1, 2 and 3/S1.2 Plate washers required HTT4#10x1 1/2" SD Holdown @ South end only 5/8" Rod into adhesive 12" Min Embed @ South end only These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG SHEAR WALL DETAILS & SCHEDULE AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S1.2 B C D E F 21 21 3 4 A 5 6 3 4 5 6 B C D E F A 100'-0" T.O.S. 99'-11" T.O.S. SCALE: 1/4" = 1'-0" 0'2'8'4'1 S2.1 T.O.W. 99'-4" T.O.W. 99'-8"-95'-2" T.O.F. 95'-8"-92'-2" T. O . W . 99 ' - 4 " T. O . W . 95 ' - 2 " T. O . F . 92 ' - 2 " T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T.O.W. 99'-2" T.O.F. 97'-0" T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " (E ) P I P E ( U ) (E ) P I P E ( U ) (E) P I P E ( U ) (E) P I P E ( U ) (E ) P I P E ( U ) (E) P I P E ( U ) (E) P I P E ( U ) (E) P I P E ( U ) (E) P I P E ( U ) T.O.W. 99'-4" T.O.F. 97'-0" T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T. O . W . 99 ' - 2 " T. O . W . 95 ' - 2 " T. O . F . 92 ' - 2 " T. O . W . 95 ' - 4 " T. O . F . 97 ' - 0 " T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T.O.W. 99'-2" T.O.F. 97'-0" T.O.F. TYP. 99'-6" T.O.W. 99'-4" T.O.F. 97'-0" LIMIT NEW CONSTRUCTION TO R E M A I N T O R E M A I N T O R E M A I N O R T O B E R E M O V E D @ C O N T R A C T O R ' S O P T I O N S E E S 2 . 4 (E) PARTITION TO BE REMOVED (TYP.) DEMOLITION LEGEND (E) POSTS TO BE REMOVED (TYP.) (E) BEAM TO BE REMOVED (TYP.) (E) JOIST TO BE REMOVED (TYP.) FIELD VERIFY PRESENCE OF THICKENED SLAB BEARING ON 16" SQUARE GRADE BEAM (RE: ORIGINAL CD'S 10/S-5) OR CONTACT ENGINEER FOR NEW FOOTING DESIGN IF NOT CONFIRMED 12'-0"12'-0"12'-0"12'-0"12'-0" 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 2'-0" 1'-0" 2' - 0 " 1' - 7 " 1' - 2 " 8" 2' - 0 " 1' - 7 " 1' - 2 " 2'-0" 1'-4" 8" 2' - 0 " 1' - 4 " 8" 2'-0" 1'-6" 1'-2" 6" 2' - 0 " 1' - 6 " 1' - 2 " 6" 2' - 0 " 1' - 6 " 1' - 2 " 5 1 / 2 " 2' - 0 " 1' - 4 " 8" 2' - 0 " 1' - 4 " 8" 2'-0" 1'-4" 8" (E) 1'-4"X18" FOOTING TYP. 2'-0" 1'-4" 8" FIELD VERIFY PRESENCE OF THICKENED SLAB BEARING ON 16" SQUARE GRADE BEAM (RE: ORIGINAL CD'S 10/S-5) OR CONTACT ENGINEER FOR NEW FOOTING DESIGN IF NOT CONFIRMED These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG EXISTING FOUNDATION PLAN AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S2.1 B C D E F 21 21 3 4 A 5 6 3 4 5 6 B C D E F A 4:12 4: 1 2 4: 1 2 4:12 4:12 TRUSS F TR U S S E TR U S S A TR U S S A TR U S S G TR U S S G SCALE: 1/4" = 1'-0" 0'2'8'4'1 S2.2 (E ) 6 X 1 2 T O R E M A I N (E) 6X12 TO BE EXPOSED OR FIELD VERIFIED (E ) 6 X 1 2 (E ) 6 X 1 2 (E) 6X12 (E) 6X12 (E) 6X12 (E) 6X12 (E) 6X12 (E)(3) 2X12 HEADER (E) ( 3 ) 2 X 1 2 H E A D E R (E ) ( 3 ) 2 X 1 0 H E A D E R TO B E R E M O V E D (E ) ( 3 ) 2 X 1 0 H E A D E R (E ) P I P E 4 " S T D (E ) P I P E 4 " S T D (E) P I P E 4 " S T D (D) (E) P I P E 4 " S T D (D) (E) P I P E 4 " S T D (D) (E ) P I P E 4 " S T D ( D ) (E ) P I P E 4 " S T D ( D ) (E ) P I P E 4 " S T D ( D ) LIMIT NEW CONSTRUCTION(E) LOAD BEARING PARTITION TO BE REMOVED (TYP.) (E) NON-LOAD BEARING PARTITION TO BE REMOVED (TYP.) DEMOLITION LEGEND (E) POSTS TO BE REMOVED (TYP.) (E) BEAM TO BE REMOVED (TYP.) (E) JOIST TO BE REMOVED (TYP.) (D ) T O R E M A I N (D ) T O R E M A I N (E ) 6 X 1 2 T O R E M A I N (E ) H E A D E R T O BE R E M O V E D (E) HEADER OR BEAM TO BE EXPOSED JACK TRUSSES @ 24"O.C. TRUSS B @ 24"O.C. JA C K T R U S S E S @ 2 4 " O . C . TR U S S E @ 2 4 " O . C . TRUSS D @ 24"O.C. (E ) P I P E ( D ) T O R E M A I N O R T O B E R E M O V E D @ C O N T R A C T O R ' S O P T I O N S E E S 2 . 4 (E) 6X12 TO REMAIN OR BE REMOVED @ CONTRACTOR'S OPTION (E) 6X12 TO REMAIN OR BE REMOVED @ CONTRACTOR'S OPTION (E) 6X12 TO REMAIN OR BE REMOVED @ CONTRACTOR'S OPTION These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG EXISTING ROOF FRAMING PLAN AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S2.2 B C D E F 21 21 3 4 A 5 6 3 4 5 6 B C D E F A 100'-0" T.O.S. 99'-11" T.O.S. 1-1D 1-1B 1-B 1 S3.1 2 S3.1 3 S3.1 4 S3.1 5 S3.1 6 S3.1 7 S3.1 SCALE: 1/4" = 1'-0" 0'2'8'4'1 S2.3 T. O . W . 99 ' - 4 " T. O . W . 95 ' - 2 " T. O . F . 92 ' - 2 " T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T.O.W. 99'-2" T.O.F. 97'-0" T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " (E) P I P E ( U ) (E ) P I P E ( U ) (E) P I P E ( U ) (E ) P I P E ( U ) (E) P I P E ( U ) (E) P I P E ( U ) T.O.W. 99'-4" T.O.F. 97'-0" T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T. O . W . 99 ' - 2 " T. O . W . 95 ' - 2 " T. O . F . 92 ' - 2 " T. O . W . 95 ' - 4 " T. O . F . 97 ' - 0 " T. O . W . 99 ' - 4 " T. O . F . 97 ' - 0 " T.O.W. 99'-2" T.O.F. 97'-0" T.O.F. TYP. 99'-6" T.O.W. 99'-4" T.O.F. 97'-0" W O O D P O S T S (U ) T Y P . O F ( 3 ) (N) 4" SLAB ON GRADE W/ #4 @ 16"O.C. EACH WAY OVER 4" GRAVEL DRAINAGE COURSE. PLACE SLAB ON COMPACTED STRUCTURAL FILL TO BE APPROVED BY THE GEOTECHNICAL ENGINEER. DOWEL (N) STEM WALL TO (E) STEM WALL W/ #5X24" DOWELS INTO 6" ADHESIVE @ 12"O.C. TYP. OF 3 FIELD VERIFY PRESENCE OF THICKENED SLAB BEARING ON 16" SQUARE GRADE BEAM (RE: ORIGINAL CD'S 10/S-5) OR CONTACT ENGINEER FOR NEW FOOTING DESIGN IF NOT CONFIRMEDFIELD VERIFY PRESENCE OF THICKENED SLAB BEARING ON 16" SQUARE GRADE BEAMS (RE: ORIGINAL CD'S 10/S5) OR CONTACT ENGINEER FOR NEW FOOTING DESIGN IF NOT CONFIRMED 12'-0"12'-0"12'-0"12'-0"12'-0" 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 12 ' - 0 " 2' - 0 " 1' - 7 " 1' - 2 " 2' - 0 " 1' - 6 " 1' - 2 " 5 1 / 2 " 2' - 0 " 1' - 4 " 8" 2' - 0 " 1' - 4 " 8" 2'-0" 1'-4" 8" (E) 1'-4"X18" FOOTING TYP. 2'-0" 1'-4" 8" 8" 1' - 8 " 1' - 2 " 6'-0" 1-2F (N) 1/2" THREADED ROD SILL ANCHORS @ 32"O.C. INTO 7" MIN ADHESIVE EMBED 5/8" ROD INTO 12" MIN. ADHESIVE FOR HOLDOWN CONNECTION @ SHEAR WALL ABOVE HOLD DOWN & STRAP SCHEDULE (N) 1/2" THREADED ROD SILL ANCHORS @ 32"O.C. INTO 7" MIN ADHESIVE EMBED OR 1/2" ABs @ 32" O.C. @ (N) FDN WALL PORTION 8 S3.1 (N) CONCRETE PEDESTAL PLACE (N) INTERIOR WOOD POSTS (U) ON ABU66Z POST BASE TYP OF (4) LOCATIONS THIS LINE. LOCATE (N) POST ON (E) STEM WALL LOCATE (N) POSTS ON (E) STEM WALL 8" C M U 2' - 0 " 1' - 4 " T. O . F . 97 ' - 0 " T.O.F. 97'-0" T. O . W . 10 0 ' - 0 " T. O . W . 99 ' - 6 " RECOMMENDED SLAB CONTROL JOINT LOCATION RE: 11/S3.1 DOWEL (N) FOOTING INTO (E) FOOTING W/ (3) #5X24" DOWELS INTO 6" ADHESIVE LIMIT NEW CONSTRUCTION (N) 4" SLAB ON GRADE W/ #4 @ 16" O.C. EACH WAY OVER 4" GRAVEL DRAINAGE COURSE. PLACE SLAB ON COMPACTED STRUCTURAL FILL TO BE APPROVED BY THE GEOTECHNICAL ENGINEER. 9 S3.1 AT CONTRACTOR'S OPTION, WOOD POST CAN BE FRAMED WITHIN THE EXTERIOR WALL LINE ON GRID "B" LEVEL FLOOR W/ SELF LEVELING CONCRETE TOPPING, DAYTON SUPERIOR ECONOLEVEL, CHIP OUT LOOSE CONCRETE PRIOR TO POUR (N) 3'-0" SQUARE X 10" THICK FOOTING W/ (3) #4 BARS EA. WAY BOTTOM TYP. OF (3) LOCATIONS 1' - 7 1 / 2 " 10 ' - 6 " 10 ' - 6 " (N) (2) 2x4 STUD PACK BELOW EACH TRUSS BEARING POINT (E) PIPE COLUMN (U) TO REMAIN OR BE REMOVED AT CONTRACTOR'S OPTION. SEE S2.4. (E) PIPE COLUMN (U) TO REMAIN TYP OF (2) THIS LINE . These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG PROPOSED FOUNDATION PLAN AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S2.3 5 S4.1 6 S4.1 B C D E F 21 21 3 4 A 5 6 3 4 5 6 B C D E F A 4:12 4: 1 2 4: 1 2 4:12 4:12 4: 1 2 3: 1 2 3: 1 2 4:12 4:12 1-1D 1-1B 1-B 1-2F 1 S4.1 2 S4.1 1 S4.2 (E) TRUSS F TR U S S E (E ) T R U S S A TR U S S A TR U S S G TR U S S G SCALE: 1/4" = 1'-0" 0'2'8'4'1 S2.4 (E ) 6 X 1 2 (E ) 6 X 1 2 (E) 6X12 (E) 6X12 (E) 6X12 (E) 6X12 (E) 6X12 (E)(3) 2X12 HEADER (E) ( 3 ) 2 X 1 2 H E A D E R (E ) ( 3 ) 2 X 1 0 H E A D E R (E) P I P E 4 " S T D (D) (E) P I P E 4 " S T D (D) (E) P I P E 4 " S T D (D) (E ) P I P E 4 " S T D ( D ) (E ) P I P E 4 " S T D ( D ) (E ) P I P E 4 " S T D ( D ) (N)(2) 2x8 N) ( 3 ) 1 8 " L V L [ D R O P P E D ] (N)(2) 9 1/2" LVL CANT. [LOW] (N ) ( 3 ) 9 1 / 2 " L V L [ L O W ] (E ) 6 X 1 2 TO R E M A I N (N)(2) 2x8 (N)(2) 9 1/2" LVL CANT. [LOW] (N)(2) 9 1/2" LVL CANT. [LOW] (N)(2) 9 1/2" LVL HEADERS W/ INSULATED CORES TYP @ EXTERIOR OF ADDITION U.N.O. 6X6 D F # 1 P O S T S (D) T Y P . O F ( 3 ) MAKE-UP AIR UNIT LOCATION TO REMAIN V.I.F. REMOVE DRYWALL @ THIS WALL & SHEATHE THE INTERIOR FACE OF STUDS PER THE SHEAR WALL SCHEDULE ON S1.2. (E) 6X12 (N) (4) 7 1/4" LVL (E) JACK TRUSSES @ 24"O.C. (E) TRUSS B @ 24"O.C. (E ) J A C K T R U S S E S @ 2 4 " O . C . (E ) T R U S S E @ 2 4 " O . C . (E) TRUSS D @ 24"O.C. (N ) ( 2 ) 7 1 / 4 " L V L [S L O P E D ] RA F T E R S @ 2 4 " O . C . (N ) 2 X 8 D F # 1 R A F T E R S @ 16 " O . C . T O AL I G N W / ( N ) S T U D F R A M I N G O N G R I D "1 " . S E E 3/ S 4 . 1 (N) 11 7/8" LVL EA SIDE OF BOTTOM CHORD EA TRUSS B TO C 2' - 4 " 3'-0"3' - 0 " MIN (4) 2X6 (D) V.I.F. PROVIDE ADDITIONAL 2X6 PLIES AS REQUIRED & SCREW TOGETHER PER GENERAL NOTES DO U B L E K I N G DO U B L E T R I M M E R D O U B L E K I N G D O U B L E T R I M M E R LSSR2 8 Z 3 S4.1 LUS28-2 OK TO K E R F CUT DO U B L E K I N G SIN G L E T R I M M E R TY P @ E X T E R I O R U.N . O . HUC 4 1 0 I N S T A L L E D UPS I D E D O W N TYP O F ( 3 ) LOC A T I O N S 9 S4.1 (N) ( 4 ) 2 X 6 BUI L T - U P (D) W/ B C 6 P O S T C A P (N ) ( 4 ) 2 X 6 BU I L T - U P (D ) W/ B C 6 P O S T C A P (N) (2) 2X8 TIMBERSTRAND (TYP OF (2) LOCATIONS) FOR HOOD SUPPORT. CONTRACTOR TO COORDINATE PLAN LOCATION OF BEAMS W/ LINE OF HOOD SUPPORT ANGLES (N) 2X8 BLOCKING @ 32"O.C. RE: DETAIL 8/S4.1 8 S4.1(N ) ( 3 ) 1 1 7 / 8 " L V L [D R O P P E D ] 4 S4.1 LIMIT NEW CONSTRUCTION (N) (4) 2X 6 BUILT-UP (D) W/ BC6 PO S T C A P AT CONTRACTOR'S OPTION, POST CAN BE LOCATED WITHIN EXTERIOR WALL FRAMING ON GRID B. LOCATE (N) POSTS ON (E) STEM WALL (N) (2) 2x4 STUD PACK BELOW EACH TRUSS BEARING POINT CONTRACTOR TO COORDINATE PIPE COLUMN CONFLICT WITH OWNER, ARCH. AND KITCHEN CONSULTANT. ALTERNATIVELY, (E) PIPE COLUMN CAN BE REMOVED & (N) STUD PACK CAN BE FRAMED WITHIN PARTITION WALL AS SHOWN FOR SUPPORT OF (E) 6X12 BEAM (N) (4) 2X4 STUD PACK @ CONTRACTOR'S OPTION TO BE INSTALLED IF PIPE COLUMN ON GRID C1 IS TO BE REMOVED. SEE NOTE AT LEFT. ( N ) ( 3 ) 2 X 6 ( D ) ( N ) ( 4 ) 2 X 6 ( D ) (N) ( 4 ) 2 X 6 (D) (E) PIPE COLUMN (D) TO REMAIN TYP OF (2) THIS LINE. 10 S4.1 [LOW] 7 S4.1 (E ) 6 X 1 2 TO R E M A I N TYP. OF (2) (N ) ( 3 ) 2 X 6 (D ) (N ) ( 3 ) 2 X 6 (D ) AT CONTRACTOR'S OPTION, IF (E) BEAM REMAINS, PROVIDE (N) HU612 HANGER (N ) ( 2 ) 1 1 7 / 8 " L V L (N ) ( 2 ) 1 1 7 / 8 " L V L 11 S4.1 TYP. OF (4) (N ) 6 X 1 0 D F # 1 (N ) 6 X 1 0 D F # 1 These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG PROPOSED ROOF FRAMING PLAN AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S2.4 1 S4.2S4.3 ALT SCALE: = 1'-0" TYPICAL CONSTRUCTION & CONTROL JOINT 11 S3.11" "t"/4 (Depth of joint) 1'-0"1'-0" 8" 8" Sawcut or tooled control joint seal all control joints w/ cont. bead of sealant same color as concrete Sleeve to assure slippage 1"Ø x18" long smooth dowels @ 18" O.C.mid depth - use SIKA dowel or equivalent w/ prior approval (2) #4 @ Bottom (2) #4 @ Bottom CONSTRUCTION JOINT AS REQUIRED CONTROL JOINT 1/4"x1"reveal w/ cont. bead of sealant same color as concrete t (Slab thickness per plan) Per Plan T.O.F. Per Plan T.O.W. SCALE: = 1'-0" TYPICAL NEW EXTERIOR FOUNDATION WALL 1 S3.13/4" SCALE: = 1'-0" EXTERIOR FOOTING & COLUMN 3 S3.13/4" SCALE: = 1'-0" EXISTING FOUNDATION @ GRID 1/C-E 4 S3.13/4" Per Plan T.O.F. Per Plan T.O.W. SCALE: = 1'-0" TYPICAL EXTERIOR FOUNDATION @ DOORS 2 S3.13/4" SCALE: = 1'-0" EXISTING FOUNDATION @ GRID E/1-2 5 S3.13/4" SCALE: = 1'-0" SLAB @ EXISTING FOUNDATION @ GRID C/1-2 6 S3.13/4" SCALE: = 1'-0" SLAB @ EXISTING FOUNDATION @ GRID 2/B-C 7 S3.13/4" (2) #5 T&B continuous Horiz. Reinf. #5 @16"O.C. Vert. Reinf. #4 @ 18"O.C. w/ Standard 90° hook - alternate legs Slab-on-grade & base course per plan 1/2" fiber pad 1/2" Sealed fiber isolation joint Shear wall sheathing & nailing per schedule & general notes 1/2"AB w/ 7" min. embed @ 48"O.C. TYP. @ office U.N.O Check shear wall schedule Footing Reinf.: (2) #5 Continuous Place footing on undisturbed native grade or properly compacted and tested structural fill w/ approval of the geotechnical engineer #5 Continuous Roughen surface #3 Rebar or #9 Wire ties @ 12" O.C. (For erection only) (4)-#4 "J" Dowels w/ 6" horizontal leg 7" min. embedded into footing Re: 1/S3.1 for foundation subgrade Top Ties: (2) #4 around anchor rods (top 5" of pedestal) Bottom Footing Reinf.: Per Plan Grade or slab slope away Roughen surface Slab-on-grade Simpson ABW66Z series post base w/ anchor bolt or expansion anchor - 7" min. embedment Timber post per plan Slab-on-grade & base course per plan See 1/S3.1 See 1/S3.1 for balance of information (E)(2) #5 Cont. (E)#3 @ 16"O.C.x1'-6" (E) (2) #5 Cont. T&B w/ #3 ties @ 18"O.C. (E) (3) #3 @ 18"O.C. E.W. (E) #3 Dowels x36" @ 36"O.C. Shear wall sheathing & nailing per schedule & general notes 1/2" rods into 7" min. adhesive embed Typ. U.N.O. Shear wall sheathing & nailing per schedule & general notes 1/2" rods into 7" min. adhesive embed Typ. U.N.O. (E) CMU to remain or be removed Re: Arch. See 4/S3.1 for balance of information (N) Slab-on-grade per plan See 4/S3.1 for balance of information 1/2" Sealed isolation joint (N) Slab-on-grade per plan 1/2" Sealed isolation joint See 4/S3.1 for balance of information Grade or slab slope away Grade or slab slope away 3' - 0 " m i n . f r o s t d e p t h 2 1/2" 10" U.N.O. 3" C l r . 1'-8" U.N.O. Eq.8"Eq. 5 1/2" 6" m i n . Per plan 6" M i n . Re : A r c h 3' - 0 " M i n . f o r fr o s t p r o t e c t i o n . Per plan 12" Square 10" Square 3' - 0 " m i n . f r o s t d e p t h 10" U.N.O. 3" C l r . 1'-8" Eq.8"Eq. 2'-0" 10 " 2' - 2 " m i n . 8" 2'-0" 10 " 2' - 4 " m i n . 8" 8"6" 5" 2'-0" 10 " 2' - 4 " m i n . 8" 10 " 2' - 2 " m i n . 8" 2" 8" 6"2" 1' - 4 " Provide 6" min. into adhesive Typ. #4 ties @ 10"O.C. w/ Std. 90° hook #4 ties @ 10"O.C. w/ Std. 90° hook #4 ties @ 10"O.C. w/ Std. 135° hook ( 5 ) # 5 Ve r t . b a r s (N) Conc. pedestal 8" (N) Wood post above per plan Provide 6" min. into adhesive 1 1/2" Clr. 3" C l r . (N) Wood post above per plan (E) Footing & stem wall per plan Provide 6" min. into adhesive See 7/S3.1 for balance of information 3" A A A A SCALE: = 1'-0" NEW CONCRETE PEDESTAL DETAIL @ OFFSET PPOST 8 S3.13/4" 10 " 3' - 0 " m i n . f r o s t p r o t e c t i o n 4' - 0 " m a x . Per Plan T.O.F. 8" CMU 2'-0" 1'-4"8" Horiz. Reinf: (2)-#5 cont. @ top of wall 9 Ga. Dur-O-Wall Horiz. reinf. @ 16" o.c. #5@ 48" Vert. Reinf. centered in wall Grout wall solid 30# felt isolation joint, Slab-on-grade slope away Centered Footing Dowels: #5 @ 48" with 15" legs alternate sides Roughen Surface Solid grout below grade 3" C l r . 3" C l r . See 1/S2.1 SCALE: = 1'-0" TYP. MECHANICAL SCREEN WALL 9 S3.13/4" (2)-#5 Cont. bottom SCALE: = 1'-0" EXTERIOR PORCH SLAB EDGE 10 S3.13/4" 1' - 0 " m i n . 8" m i n . 8"min. (2) #4 (2) #4Slope Re: Arch. 2' - 6 " P r o j e c t i o n Roughen surface 6"min. Chip back existing stem wall and roughen surface prior to placement of new slab 6" Slab haunch Roughen surface (N) foundation drain per Geotechnical Engineer's recommendations 1/2" rods into 4" min adhesive embed Typ. U.N.O. Thin veneer Re: Arch. to bear on (E) ledge 2"V.I.F. These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG FOUNDATION DETAILS AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S3.1 SCALE: = 1'-0" RAFTER @ EXTERIOR BEAM 1 S4.11" SCALE: = 1'-0" (N) TYPICAL BUILT-UP WALL DETAIL @ (E) BEAMS TO REMAIN 3 S4.11" SCALE: = 1'-0" BEAM TO POST CONNECTIONS 2 S4.11" 1 2 Beam per plan 10d Toenails @ 6"O.C. 2x Blocking 2x T&G Roof sheathing & nailing per General notes 10d @ 6 HGA10KT each rafter Rafter per plan (E) Beam to remain (E) Holdown to remain V.I.F. (E) Roof sheathing 10d @ 6 Roof sheathing & nailing per general notes 2x6 T&G Hanger per plan Rafter per plan 2x8 Ledger w/ (2) SDS 1/4"x5" screws @ 16"O.C. HGA10KT not shown for clarity Rafter per plan Beam per plan Column per plan Column below Column below Mitered beams over column BEAMS TO CENTER POST BEAM TO END POST Lag bolts Lag bolts (2) 1/2" Lag bolts w/ 6" min. penetration 1 1/2" 1 1/2" 1 1/2" 1 1/2" 2x6 @ 16 Cripple wall w/ (2) rows 10d @ 6 to LVL Sheathing 7/16" OSB w/ 8d @ 6-12 LVL beam per plan Hanger per plan 10d@6 2x blocking 10d toenails @ 6 10d@6 2x blocking 10d toenails @ 6 2x6 @ 16 Cripple wall Extend shear paneling from top of wall to upper sheathing 7/16" OSB w/ 8d @ 6-12 Re: plan & shear wall schedule for paneling & nailing 2x6 nailer w/ (2) 10d to each rafter 10d toenails @ 6 LVL ra f t e r p e r p l a n 2x6 overframe rafters @ 16"O.C. Run lower sheathing to end of rafter & nail to blocking w/ 10d @ 6O.C. Roof sheathing & nailing per general notes Low cantilevered beams per plan 10d @ 6 into 2x flat blocking 2x10 cleat w/ (3) 10d into each rafter (3) 10d toenails rafter to cleat H2.5a clip each rafter & beam SCALE: = 1'-0" SECTION @ CANTILEVERED ROOF 9 S4.11" (N) Hood support beam per plan: at ends, provide HGA10KT from side of beam to top of top plate or to top of LVL beam (N) Blocking per plan (E) Trusses per plan V.I.F. (E) Roof sheathing SCALE: = 1'-0" SECTION @ HOOD SUPPORT BEAMS 8 S4.11" (N) H2.5a Clips each truss (E) Trusses per plan V.I.F. (N) Dropped LVL beam per plan SCALE: = 1'-0" EXISTING TRUSS @ NEW DROPPED LVL BEAM 4 S4.11" (N) 2x6 blocking (2) rows 10d @ 6 into dropped LVL beam (N) LVL beam beyond per plan, see 6/S4.1 for beam bearing condition (E) Truss per plan (N) Rafter per plan w/ birdsmouth cut (N) Roof sheathing & nailing per general notes (N) H2.5a Clips each rafter (N) 10d @ 6 (E) Roof sheathing (N) cont. 2x blocking between (E) trusses (N) 10d toenails @ 6 (N) cont. Double 2x6 top plate/blocking between (E) trusses (N) 2x6 @ 16 stud framed cripple wall between (E) trusses (N) H2.5a Clips each truss (N) Dropped LVL beam per plan (N) HGA10KT both faces of beam typ. of (3) beam locations (N) Dropped LVL beam per plan (N) LVL beam [Low] per plan (N) 2x6 blocking (2) rows 10d @ 6 into dropped LVL beam (N) 2x blocking 10d toenails @ 6 AA (N) LVL beam beyond per plan (E) Truss per plan (N) Cripple wall framing, see above A A (N) cripple wall framing beyond SCALE: = 1'-0" HIGH TRUSS HEEL & RAFTER DETAIL @ DROPPED BEAM 5 S4.11" SCALE: = 1'-0" CANTILEVERED BEAM END @ DROPPED BEAM 6 S4.11" 10d Toenails @ 6 Full depth LSL or 2x blocking Expose (E) sheathing edge & provide 10d @ 6"O.C. nailing into (N) blocking (N) MTS16 twist strap each rafter to stud (N) Shear wall sheathing & nailing per plan & schedule (E) Tr u s s t o r e m a i n A35 each stud (3) 10d nails from blocking into (E) studs SCALE: = 1'-0" TYPICAL HEADER CONDITION @ BUILT- UP WALL 7 S4.11" (E) Holdown to remain V.I.F. (E) Roof sheathing (E) Tr u s s t o r e m a i n Edge of backing stud beyond top of backing stud beyond 1 1 / 2 " 1 1 / 2 " 2 1 / 4 " 1 1 / 2 " (2) Rows 1/4"x8" SDS screws @ 8"O.C. into top plate & header. Pre-drill w/ 1/8"Ø drill bit (N) LVL header per plan 10d @ 6 See balance of information on 3/S4.1 (N) 2x6 @ 16"O.C. backer stud (2) Rows 10d @ 6"O.C. staggered Typ. (N) 2x6 @ 16"O.C. (N) 2x4 @ 16"O.C. full height (N) Shear wall sheathing & nailing per plan & schedule PLAN VIEW SCALE: = 1'-0" BUILT-UP WALL FRAMING SECTION ON GRID "1" BETWEEN GRIDS "C" & "E"10 S4.11 1/2" See balance of details for remainder of information PLAN VIEW SCALE: = 1'-0" TYPICAL KING/TRIMMER STRAP DETAIL @ BUILT-UP WALL ON GRID"1"11 S4.11 1/2" (N) Shear wall sheathing & nailing per plan & schedule LSTA9 strap @ 16"O.C. last 2x4 king stud to last 2x6 stud King/trimmer assembly per plan/general notes door/window opening 1 1 / 2 " OK to build-up below header with flat ripped 2x's or infill studs to reach window R.O. Extend sheathing to R.O. These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG FRAMING DETAILS AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S4.1 SCALE: = 1'-0" EXISTING TRUSS REINFORCEMENT 1 S4.21/2" B C D E 2 S4.2 3 S4.2 4 S4.2 5 S4.2 BOT. CORD SPLICE BOT. CORD SPLICE TOP CORD SPLICE LARGE WAFFLE PLATE TOP CORD SPLICE PRO SHOPMECHANICAL 4 12 2X4 WEB TYP. (E) 2X6 (E) 2X6 (E) 2X6 (E) 2X6 (E) 2 X 6 (E) 2 X 6 ( E ) 2 X 4 (E) 2 X 4 + (N ) ( 2 ) 2 X 4 (3) 2 X 4 T O T A L + ( N ) ( 2 ) 2 X 4 ( 3 ) 2 X 4 T O T A L (N) (2) 11 7/8" LVL REQUIRED 2X4 CONTINUOUS BRACE LOCATIONS ALL TRUSSES W/ ADJACENT. OK TO LAP/SPLICE ON SAME SIDE OF MEMBER. 36'-9 1/2" 2'-0" 1'-0"+/- 6'-4" 5'-6" 12'-2 1/4" 2" 4' - 8 " 2" 2" 2" 1/ 3 12'-0"12'-0"12'-0" 2" 7 1/2" 1/ 3 1/ 3 EQ . EQ . SCALE: = 1'-0" TRUSS WEB REINFORCEMENT 2 S4.21 1/2"SCALE: = 1'-0" ADDITIONAL LVL SUPPORT @ TRUSS BOTTOM CHORDS 3 S4.21 1/2"SCALE: = 1'-0" EXISTING TRUSS SUPPORT @ NEW LVL'S 4 S4.21 1/2"SCALE: = 1'-0" SUPPORT OF TRUSS PANEL POINT @ OFFSET BEARING WALL 5 S4.21 1/2" (N) Web reinf. members per truss elevation (E) Truss web member to be reinforced per truss elevation Assemble built-up web member as required in general notes for built-up columns (N) 2X4 Bracing continuous (may be lapped or spliced @ LVL'S) w/ (2) 10d to top of LVL's (E) Truss bottom chord (E) Ceiling lid - R&R as required (N) LVL's per plan & truss elevation. Face nail to (E) truss bottom cord w/ 16d @ 16"O.C. (E) Truss vertical web (E) Ceiling lid - R&R as required (N) CMSTC 16 strap saddle centered on vertical truss web bent around truss bottom chord and over both LVL's. Nail 4" each side of each LVL (N) Additional LVL's support Re: 3/S42 (E) Truss vertical web (E) Truss sloped webs w/ (N) reinforcement per truss elevation (N) CMSTC strap saddle Re: detail 4/S4.2 around bottom of (E) truss & over both LVL's ℄Truss panel point ℄Load bearing wall (N) Blocking over load bearing wall both ends of LVL supports (E) 2x6 Truss bottom cord (N) Additional LVL supports both sides 4" 1'-0"+/- (E) Truss connector plate These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG FRAMING DETAILS AS NOTED 10/23/23 Permit Set 03/07/24 Construction Changes 03/07/24 S4.2 SCALE: = 1'-0" EXISTING TRUSS REINFORCEMENT ALTERNATIVE DETAIL 1 S4.31/2" B C D E 2 S4.2 BOT. CORD SPLICE BOT. CORD SPLICE TOP CORD SPLICE LARGE WAFFLE PLATE TOP CORD SPLICE PRO SHOPMECHANICAL 4 12 2X4 WEB TYP. (E) 2X6 (E) 2X6 (E) 2X6 (E) 2X6 (E) 2 X 6 (E) 2 X 6 ( E ) 2 X 4 (E) 2 X 4 + (N ) ( 2 ) 2 X 4 (3) 2 X 4 T O T A L + ( N ) ( 2 ) 2 X 4 ( 3 ) 2 X 4 T O T A L REQUIRED 2X4 CONTINUOUS BRACE LOCATIONS ALL TRUSSES W/ ADJACENT. OK TO LAP/SPLICE ON SAME SIDE OF MEMBER. 36'-9 1/2" 2'-0" 1'-0"+/- 6'-4" 5'-6" 12'-2 1/2" 2" 4' - 8 " 2" 2" 2" 1/ 3 12'-0"12'-0"12'-0" 2" 7 1/2" 1/ 3 1/ 3 EQ . EQ. (N) (2) 2x4 STUD PACK BELOW EA SUPPORT - FACE NAIL W/ (2) ROWS 16d @ 8"O.C. 2'-0"MIN notch height both LVL's 1'-4"MIN nailing EA end of strap (@ EA LVL) CMSTC16 STRAP AROUND BOTTOM OF (E) TRUSS TO SIDES OF (N) LVL'S 3 1/2" notch width both LVL's 2x8 CONT. BLOCKING B B A A Assemble LVL's and 2x8 filler W/ (2) rows SDS 1/4x5 @16" O.C. EA face staggered (Total vertical spacing 8"O.C. EA face) (N) 16" LVL full height of truss notched as shown in elevation CMSTC16 Strap around bottom of (E) truss to sides of (N) LVL's (E) 2x4 Truss vertical web member Assemble LVL's and (E) truss member W/ (2) rows SDS 1/4x5 @16" O.C. EA face staggered (Total vertical spacing 8" O.C. EA face) (N) 16" LVL full height of truss notched as shown in elevation (N) 2x8 filler block full height of truss PLAN SECTION A-A (N) 16" LVLs full height of truss notched as shown in elevation (E) 2x4 Truss vertical web member CMSTC16 Strap around bottom of (E) truss to sides of (N) LVL's (E) 2x6 Truss bottom chord See truss elevation for MIN length of strap overlap for nailing ELEVATION SECTION A-A These documents are intended for the exclusive use of the project specified below. The use of these documents for any other purpose is not authorized. Written authorization from Glenwood Structural and Civil must be obtained for any other use. This document is to be used within one year of the date of preparation. Use after that period is not authorized. Date Description Scale: Job Number Engineer Date 23704 AG STRUCTURAL & CIVIL, INC. E N G I N E E R S I C O N S T R U C T O R S G L E N W O O D 812 Pitkin Avenue, Glenwood Springs CO 81601 gsc@sopris.net I 970-928-0135 GOLF CLUBHOUSE ADDITION Battlement Mesa CO Drafter/Designer KK/WG,AG FRAMING DETAILS AS NOTED 03/07/24 Construction Changes 03/07/24 S4.3