Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Blower Door Test
Testing Company: Name:Energy Pro Address:2892 I70B Grand Junction, CO 81501 Phone: 970 623 7327 trent@energyproservices.com Technician: Name:Dennis Patterson Credentials: Email:dennispatt27@gmail.com Building Information: Project ID:SCIB LLC Address:303 Blue Heron Dr Lot 54 Glenwood Springs, CO 81601 Year Built:2024 Geo-Tag Data:Latitude: Longitude: Timestamp: Customer Information: Name:SCIB LLC Address:115 Boomerang Rd Suite 5201B Aspen, CO 81611 Phone: 512/673/3867 Email: michael.price@sunriseco.com Measured Leakage:1.83 ACH50 Leakage Target:3.00 ACH50 Compliance with Leakage Target:Pass Test ID:303 Blue Heron lot 54 Purpose of Test:IECC 12/15 Env. Leakage Measured CFM50:893.6 Effective Leakage Area: 49.2 in² Building Volume:29,257.0 ft³Enclosure Surface Area: 2,032.0 ft² Coefficient (C):70.3 Exponent (n): 0.650 (assumed) Test Standard:RESNET 380 One-Point Test Mode: Depressurize Test Characteristics:Indoor Temp: 79 °F Altitude: 5,883.0 ft Outdoor Temp: 80 °F Time Average Period: 10 seconds Test Date and Time:2024-07-12 11:09:49 Envelope Leakage Test Test Readings: Target (Pa)Bldg (Pa)Adj Bldg (Pa)Fan (Pa)Flow (cfm)Config Baseline -2.7 -50.0 -53.2 -50.5 -212.3 862.9 Ring B Test Equipment: Flow Device:Model 3 110V Fan Pressure Gauge:DG1000 Serial #: 14229 Calibration Date: 2023-06-14 Deviations from Standard: None Comments: None Envelope Leakage Test Page 2 of 2Report by TEC Auto Test 1.9.1 (8), © 2023 The Energy Conservatory, Inc.