Loading...
HomeMy WebLinkAboutCorrespondenceColleen Wirth From: Sent: To: Cc: Subject: Attachments: Paul Adams <padams@earthskyarchitecture.com> Tuesday, July 16,2024 6:04 PM Colleen Wirth alexandra.shabtai@gmail.com; snichols@ levelengineering.com; Alan Short Re: BLRE-06-24-8744 - EBBS and FLOWERS LLC detached garage is now UNDER REVIEW Shabtai 3-Car Garage - construction set 7-16-2024.pdf HiColteen, I have attached an updated drawing set that shows the fire-rated door at the top of the stair and the drywatt detail. for the steel beams in the garage. The etectricat ptan was updated to correspond. Ptease let me know if you need anything etse Thanks, PauI Paul, Adams, AIA Earth and Sky Architecture 1400 H Street Satida, CO 81201 303-521 -8242 c Attached: Shabtai 3-Car Garage - construction set 7-16-2A24.pdt On7/12/249:57 PM, Atan wrote: Cotteen, pl,ease find attached MJ correction and response fottowing each question betow from both owner and L Paut the the architect witt be reptying with info regarding question 7 with detaits. Kind Regards Atan Short (President) Woodstone lnc. 1 On Jul, 10,2024, at4;19 PM, Cotteen Wirth s_c_wintr@garfield c-o_unty-eomi wrote: BLRE-06-24-8744 - 1000 Btack Bear Rd, Glenwood Springs Gotorado Courtesy Message for EBBS and FLOWERS project team: l've been performing ptans examination for your proposed detached garage and request some written confirmations before I continue with your buitding and zoning review. Your careful written response(s) witt best direct me to pl.acing correct stamps and apptying the correct code sections onto your FIELD COPY of prints; as wetl as supptying a ctear written record of the intended buitding use(s). Thanks in advance for your rep[y. QUESTTONS: 1. Witt the 3-car garage, attached greenhouse, and 2nd story [oft over the garage be used as a commerciat business operation or otherwise planned to be occupied for use by emptoyees or visiting customers in any manner? NO 1. 2. Witt the proposed buitding be strictty for use by the property owner and existing residentiat buitding occupants as a private use, accessory garage and attached greenhouse (incidentat and accessory to the main residence)? The sote purpose witl be strictty for personaI use. 3. Does the property owner intend the second story loft over garage to remain strictty for future use as conditioned garage storage room?YES 4. Does the property owner intend the second story loft above the garage - now or in the future - to be for use as habitabl,e iiving space i.e. yoga studio, bedroom, private office, other bonus exercise I pLay area? lf so, please explain in writing. NO 2 4. 5. Witt the garage loft remain open to the garage occupancy betow with no proposed fire separation between the 1't and second levets of the garage?We do plan on instalting a fire rated door at the top of the stairs and compl,etety wrapping with drywall to minimize the spread of dust. lf you anticipate future changes in occupancy to the Loft second story level, then I highty encourage or recommend suppl'ying and constructing a fire-separation assembty detail, and provide framing detaits to separate opening(s) between stairwett and the future buitding occupancies. No fire separation is shown on remitted ptans. 6. 7. Witt load bearing structural beam in the 1"t story garage tid (supporting the loft fl,oor system) be wrapped with drywatt? YES 6. Provide detail, if appl,icabte to 2015 IRG Tabte R302.6. Ptans are unclear. 7. 8. The manuat J8 Load Catc report for 1000 Btack Bear dated June 6, 2024currentl,y tists a minus 5 degree F winter design temperature. As the site is over 8,000 ft etevation, I believe the 2018lECC and 2015 IRC and [oca[ Garfiel'd County Buitding Resolution, witl require a minimum minus 16 degree F winter design temperature for heated conditioned buitding structure. Please suppty a corrected report when avaitabte. Email, to Cotteen Wirth, Ptans Examiner, euli rtb@€a rfi qtd:qounty,com. Bu i td i n g C od e re q u i re m e nt P D F i s attached for generat knowl,edge. Your responses to ltems 1-8 witt atso ensure a ctear understanding of which sections of the 2018 IECC energy conservation code wi[[ pertain to your project. Most helpfut, thanks for your time. I am schedul,ed out of the off ice Juty 1 1-14, returning Juty 15. Cotteen Wirth Buitding Ptans Examiner Garfietd Gou nty Community Development 108 Bth Street, Suite 401 (970) 945-1 377 ext 1 61 0 3 5 6 ewirtfi @ga rf ie Id -c o u nty. com <Buil,di ng Code Requi rements - ResidentiaL. pdf> 4 Colleen Wirth Sent: To: Cc: From:Colleen Wirth Wednesday, July 17,2024 8:11 AM PaulAdams alexandra.shabtai@g mail.com; snichols@ levelengineering.com; Alan Short RE: BLRE-06-24-8744 - proposed plan updates Hi Pau[, Please go ahead and resubmit (2) FULL SIZE COMPLETE SETS of drawings inctuding the proposed changes / updates. Paper copies of REVISED plans can be dropped off or otherwise delivered to the Garfietd County Community Devetopment Department front desk, County Administration Buitding downtown Glenwood Springs, CO, between 8:30 am - 4:00 pm weekdays. Please submit attn: Cotteen Wirth Plans Examiner, BLRE-06-24-8744 EBBS AND FLOWERS LLC Cotteen Wirth Buitding Plans Examiner Garfietd County Community Devetopment 108 8th Street, Suite 401 (970) 945-1 377 ext 1 61 0 cwi rth@ga rf ie td-co u nty. co m From: Pa ul Adams <pada ms@earthskya rchitecture.com> Sent: Tuesday, July t6,2024 6:04 PM To: Co I leen Wi rth <cwi rth @ga rfield-co u nty.co m > Cc: alexandra.shabtai@gmail.com; snichols@levelengineering.com; Alan Short <Alan@woodstoneinc.net> Subject: Re: BLRE-06-24-8744 - EBBS and FLOWERS LLC detached garage is now UNDER REVIEW HiCotteen, I have attached an updated drawing set that shows the fire-rated door at the top of the stair and the drywattdetait for the steel beams in the garage. The etectrical ptan was updated to correspond. Ptease let me know if you need anything etse Thanks, PauL Paul,Adams, AIA Earth and Sky Architecture 1400 H Street Salida, CO 81201 Subject: 1 303-521-8242c Attached: Shabtai 3-Car Garage - construction set 7-16-2o24.pdt On7112/249:57 PM, Atan wrote: Cotteen, ptease find attached MJ correction and response foltowing each question betow from both owner and l. PauI the the architect witl. be reptying with info regarding question 7 with detaits. Kind Regards Al,an Short (President) Woodstone lnc. On Jut 10,2024, at 4:19 PM, Cotteen Wirth <cwirth@garfietd-equoty-e om? wrote: BLRE-06-24-8744- 1000 Btack Bear Rd, Glenwood Springs Cotorado Courtesy Message for EBBS and FLOWERS project team l've been performing ptans examination for your proposed detached garage and request some written confirmations before I continue with your buitding and zoning review. Your carefuI written response(s) witt best direct me to pl,acing correct stamps and appl,ying the correct code sections onto your FIELD COPY of prints; as wetl as supptying a ctear written record of the intended buitding use(s). Thanks in advance for your repty. QUESTTONS: 1. Wiii the 3-car garage, attacheci greenhouse, and Znd story ioft over the garage be used as a commercial business operation or otherwise ptanned to be occupied for use by emptoyees or visiting customers in any manner? No 2 1. 2. Witt the proposed buil,ding be strictly for use by the property owner and existing residentiat buitding occupants as a private use, accessory garage and attached greenhouse (incidental and accessory to the main residence)? The sole purpose witl be strictty for personat use. 3. Does the property owner intend the second story loft over garage to remain strictty for future use as conditioned garage storage room?YES 4. Does the property owner intend the second story [oft above the garage - now or in the future - to be for use as habitabl'e tiving space i.e. yoga studio, bedroom, private office, other bonus exercise / ptay area? lf so, ptease explain in writing. NO 4. 5. Witt the garage Loft remain open to the garage occupancy betow with no proposed fire separation between the 1"t and second levets of the garage? We do plan on instatling a fire rated door at the top of the stairs and completety wrapping with drywall to minimize the spread of dust. lf you anticipate future changes in occupancy to the toft second story level, then I highty encourage or recommend supptying and constructing a fire-separation assembly detait and provide framing details to separate opening(s) between stairwe[[ and the future buitding occupancies. No fire separation is shown on remitted ptans. 6. 7. Wilt load bearing structural beam in the 1"t story garage tid (supportingthe l,oft floor system) be wrapped with drywatt?YES 6. Provide detait, if appticabte to 2015 IRC Tabte R302.6. Ptans are unclear. 7. 8. The manuat J8 Load Calc report for 1000 Btack Bear dated June 6, 2O24currentty tists a minus 5 degree F winter design temperature. As the site is over 8,000 ft elevation, I believe the 3 5 6 2018lECC and 2015lRG and local Garfiel,d County Buitding Resotution, wi[[ require a minimum minus 16 degree F winter design temperature for heated conditioned buitding structure. Ptease supply a corrected report when avaitabte. Email to Cotteen Wirth, Ptans Examiner, erryirti@€a rf ietd-cou nty. com. Bu i td i n g Code req u i re me nt P DF i s attached for general, knowledge. Your responses to ltems 1-8 witt atso ensure a ctear understanding of which sections of the 2018 IECC energy conservation code wi[[ pertain to your project. Most hetpfut, thanks for your time. lam scheduted out of the office Juty 11-14, returningJul,y 15. Colleen Wirth Buitding Plans Examiner Garfield County Community Devetopment 108 8th Street, Suite 401 (970) 945-1 377 ext 1 61 0 cw irtb@ga rf LeLd - c o u n ty.e arn <Buitd ing Code Requi rements - Residentiat. pdf> 4 Colleen Wirth From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Follow up Flagged Alan < alan@woodstoneinc.net> Friday, July 12,2024 9:58 PM Colleen Wirth alexandra.shabtai@gmail.com; padams@earthskyarchitecture.com; snichols@ levelengineering.com Re: BLRE-06-24-8744 - EBBS and FLOWERS LLC detached garage is now UNDER REVIEW SHABTAI GARAGE- Load RePort.Pdf RECHIVED ",t.ru 1 5 ?,rJ24 GARFIELD CO{JNTY C0M;.1 U i.lt iy flSVF|., )ptvtENT Cotteen, ptease find attached Mj correction and response fottowing each question below from both owner and l. Pautthe the architect wil,l, be repl,ying with info regarding question 7 with detaits. Kind Regards Atan Short (President) Woodstone lnc. On Jut 10,2024, at 4;19 PM, Cotteen Wirth <cwirth@garfietd-county.com> wrote: BLRE-06-24-8744- 1000 Btack Bear Rd, Glenwood Springs Golorado Courtesy Message for EBBS and FLOWERS project team: I've been performing pl,ans examination for your proposed detached garage and request some written confirmations before I continue with your buitding and zoning review. Your carefut written response(s)witt best direct me to ptacing correct stamps and appl.ying the correct code sections onto your FIELD COPY of prints; as wet[ as supptying a ctear written record of the intended buitding use(s). Thanks in advance for your rePtY. QUESTTONS: 1. Witt the 3-car garage, attached greenhouse, and 2nd story loft over the garage be used as a commercial, business operation or otherwise ptanned to be occupied for use by emptoyees or visiting customers in any manner? NO I 1 2. Witt the proposed buitding be strictl,y for use by the property owner and existing residentiat buitding occupants as a private use, accessory garage and attached greenhouse (incidental and accessory to the main residence)? The sote purpose wltl be strlctl,y for personaI use. 3. Does the property owner intend the second story loft over garage to remain strictly for future use as conditioned garage storage room? YES 4. Does the property owner intend the second story loft above the garage - now or in the future - to be for use as habitabte tiving space i.e. yoga studio, bedroom, private office, other bonus exercise / ptay area? lf so, ptease exptain in writing. NO 4. 5. Witt the garage loft remain open to the garage occupancy betow with no proposed fire separation between the 1't and second levets of the garage? We do plan on instalting a fire rated door at the top of the stairs and comptetety wrappingwith drywaltto minimize the spread of dust. 5. 6.lf you anticipate future changes in occupancy to the toft second story levet, then I highty encourage or recommend supptying and constructing a fire- separation assembty detait and provide framing details to separate opening(s) between stairwelt and the future buitding occupancies. No fire separation is shown on remitted ptans. 6. 7. Witl load bearing structural beam in the 1't story garage tid (supporting the toft ftoor system) be wrapped with drywatt? YES 6. Provide detail, if appticabte to 2015 IRG Table R302.6. Ptans are unctear. 7. 8. The manuat J8 Load Catc report for 1000 Btack Bear dated June 6, 2024 currentty lists a minus 5 degree F winter design temperature. As the site is over 8,000 ft elevation, I betieve the 2018 IECC and 2015 IRG and local Garfietd County Buitding Resotution, wilt require a minimum minus 16 degree F winter design 2 temperature for heated conditioned buil,ding structure. Ptease suppty a corrected report when avaitable. Emait to Cotteen Wirth, Plans Examiner, ewirth@€arfiel.d-county.com. Buitding Code requirement PDF is attached for generaI knowtedge. Your responses to ltems 1-8 witt atso ensure a ctear understanding of which sections of the 2018 IECC energy conservation code witl pertain to your project. Most helpfut, thanks for your time. I am schedul,ed out of the office Juty 11-14, returning Juty 15. Go[[een Wirth Buitding Plans Examiner Garfietd County Gommunity Development 108 Bth Street, Suite 401 (970) 945-1 377 ext 1 61 0 cwi rth @ga rf ie [d -co u nty.co m <Buitding Code Requirements - Residentia[.pdf> 3